Login |Register

LTM tenders of Khulna district. | OSTETM tenders of Khulna zilla. | OTM tenders of Khulna. | View All the active tenders of Khulna district.

eGP Tender ID: 1270822; Works (NCT)
APP ID: 225239; District: Khulna
Package Title: Drainage improvements in Sub-Catchment 21 (Nobinagar Area) under KCC (CCAUD II Project)funded by KfW.
Organization: Khulna City Corporation
Procuring Entity: Chief Planning Officer at Office of CPO, Khulna City Corporation
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-05-11 12:00:00
Document last selling: 2026-06-07 17:00:00
Closing / Opening: 2026-06-08 12:00:00
Brief Description of Package: CCAUDP/4B/KfW 513815/WD-01/01
Drainage improvements in Sub-Catchment 21 (Nobinagar Area) under KCC (CCAUD II Project) funded by KfW. i. Reconstruction of approximately 1232m of existing load bearing stormwater drains and 600m of stormwater drains integrated with footpaths; and ii. Improvement of approximately 2,528m of existing drains through structural repairs, lining & top slab construction; and iii. Construction of 123 no. catch basins and 5 no. debris screens
Tender Document Price: Tk. 5000; Tender Security: 5000000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 166666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 500000000 BDT.
Thus, Official Cost Estimate should be BDT. 166666666 ~ 500000000.

Eligibility criteria:
As per TDS and ITT
Similar nature/specific experience of work: BDT 1800 (Taka in lac).  
Average annual construction turnover: BTD 2600 (Taka in lac) Over the best three years in the last five years payment certificate only.
Liquid assed or work capacity: BDT 450 (Taka in Lac).
Payment will be made upon availability of fund. For this no claim will be entertained.
VAT & IT from bill will be deducted as per prevailing Government Rate. No extra claim will be entertained in this regard.
To ensure the Quality of the material, Various test shall be performed by the tenderer as per instruction.
The Share of specific experience will be counted as per the business share of JV Partner and as per details of works completed mention in Format ePW3D-F: Completion Certificate (According to ITT Clause 31.1 (b) specific experience, of the entity(s) participating in the Tender, in construction works under public sector of similar nature and size as stated under ITT Sub Clause 13.1(a), 13.1(b), 13.1(c) & 13.1(d) substantiated by Completion Certificate (s) generated from e-GP system or issued by the relevant Procuring Entity(s) as per Format ePW3D-F.
According to ITT Clause 31.1 (c) average annual construction turnover i.e. total certified payments received for contracts in progress or completed under public sector for a period as stated under ITT Sub Clause14.1(b), 14.1(c) & 14.1(d) substantiated by the payment certificates issued by the Procuring Entity; In case of JV, the business share of the partner shall be taken into consideration to determine the Tenderer's compliance with the minimum qualifying criteria.
Project: Climate Change Adapted Urban Development Phase-II (CCUAD) Khulna
Location of work / delivery: Khulna City Corporation
Budget Type: Development
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: 28 KD ghosh road, City: khulna, Thana: khulna, District: Khulna - 9100, Country: Bangladesh,


See more tenders from Chief Planning Officer at Office of CPO, Khulna City Corporation; Khulna City Corporation:
1316651 : CCAUDP/KfW 512447/WD-05/Lot-1/01 Drainage System Upgrading in Sub-Catchment 11 (Sp-5b) Part 1: - Reconstruction of approximately 2.48km of roadside drains (reinforced concrete construction) - Installation of 24 no. catch-basins - Supply and installation of 3 no. rake bar screens
1316646 : CCAUDP/KfW 512447/WD-10/SP-9/Lot-1/2026 Rehabilitation of 9 no. out of finally 18 ponds around Khulna City. Works include water hyacinth removal and pond reprofiling, construction of foot paths, boundary walls, ghats, retaining / toe walls, community toilets, park lighting, park amenities and planting of trees / shrubs
1315401 : CCAUDP/4D/KfW512447/WD-03/01 Construction and Rehabilitation of 4-Lane Rigid Pavement, Roadside Drain, Retaining Wall, Electrification and Tree Plantation of Sonadanga Bypass Road under KCC (CCAUD II Project) Funded by KfW. i. From PK 0+390 to PK 0+792: Construction of four-lane highway with rigid pavement including a 1.0m median for multiple use (Street lights / trees); and ii. Construction of both side footpath including road site drainage including improved catch basins, Maintenance Covers and outlet structure to Moyur river.
1315397 : CCAUDP/4B/KfW 513815/WD-01/01 Drainage improvements in Sub-Catchment 21 (Nobinagar Area) under KCC (CCAUD II Project)funded by KfW. i. Reconstruction of approximately 1232m of existing load bearing stormwater drains and 600m of stormwater drains integrated with footpaths; and ii. Improvement of approximately 2,528m of existing drains through structural repairs, lining & top slab construction; and iii. Construction of 123 no. catch basins and 5 no. debris screens
1265975 : CCAUDP/4D/KfW512447/WD-03/01 Construction and Rehabilitation of 4-Lane Rigid Pavement, Roadside Drain, Retaining Wall, Electrification and Tree Plantation of Sonadanga Bypass Road under KCC (CCAUD II Project) Funded by KfW. i. From PK 0+390 to PK 0+792: Construction of four-lane highway with rigid pavement including a 1.0m median for multiple use (Street lights / trees); and ii. Construction of both side footpath including road site drainage including improved catch basins, Maintenance Covers and outlet structure to Moyur river.
Share on Twitter