Login |Register

LTM tenders of Khulna district. | OSTETM tenders of Khulna zilla. | OTM tenders of Khulna. | View All the active tenders of Khulna district.

eGP Tender ID: 1214023; Works (NCT)
APP ID: 217536; District: Khulna
Reference No.: 28.21.0000.181.61.002.25/MP
Package Title: Construction, Transportation & Installation of Marker Post for 33KM Gas Transmission pipeline at Bhola, SGCL.
Organization: Sundarban Gas Company Limited
Procuring Entity: Operation Division, SGCL
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-01-29 10:00:00
Document last selling: 2026-02-09 17:00:00
Closing / Opening: 2026-02-10 12:00:00
Brief Description of Package: Construction, Transportation & Installation of Marker Post for 33KM Gas Transmission pipeline at Bhola, SGCL.
Tender Document Price: Tk. 500; Tender Security: 20000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 2000000 BDT.
Thus, Official Cost Estimate should be BDT. 666666 ~ 2000000.

Eligibility criteria:
1. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be minimum two (2) years.
2. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least one (01) contract(s) of construction of marker post or similar any civil works successfully completed within the last five (05) years, each with a value of at least Tk. 5,00,000.00 (Five Lac Only)
3. A satisfactory completion of similar works i.e. Civil works in a Government/Semi-Government organization of at least Tk 5,20,000.00 (Five Lac Twenty Only) under one contract over a period of 5 years shall be required. 
4. The required average annual construction turnover shall be greater than Tk 9,60,000.00 (Nine Lac Sixty Thousand Only) over the best three (3) years in the last five (5) years.
5. The minimum amount of liquid assets i.e working capital or credit line(s) of the Tenderer shall be Tk 4,00,000.00 (Four Lac Only) issued by the Bank not earlier than 28 days prior the day of the original deadline for submission of e-Tender.
6. The minimum capacity shall be: Tk 5,50,000.00 (Five Lac Fifty Thousand Only).
Location of work / delivery: Bhola
Budget Type: Own Fund
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: 218, M.A. Bari Sarak, Sonadanga, Khulna., City: Khulna, Thana: Khulna City Corporation, District: Khulna - 9000, Country: Bangladesh,


See more tenders from Operation Division, SGCL; Sundarban Gas Company Limited:
1182702 : 28.21.0000.190.14.001.25.1 Installation of Permanent Cathodic Protection (CP) System of 10 inch Diameter 8.1 KM Gas Pipelines from Arangghata-BSCIC gate at Khulna.
1156320 : 28.21.0000.181.49.002.25 Coating Defect & Gas leak detection works of 35 km gas distribution pipelines of SGCL in Bhola.
Share on Twitter