Login |Register

LTM tenders of Khulna district. | OSTETM tenders of Khulna zilla. | OTM tenders of Khulna. | View All the active tenders of Khulna district.

eGP Tender ID: 957802; Works (NCT)
APP ID: 196050; District: Khulna
Reference No.: APP ID : 196050
Package Title: Construction of rupsa wholesale fish market Sluice gate cum pump house with 5.5 cumec 3 nos submersible pumps , 3-vent (1.5 m x 1.8 m). upstream and downstream R.C.C. U channel, with 2 box culverts with fencing.
Organization: Khulna City Corporation
Procuring Entity: Executive Engineer Zone A
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-03-07 10:45:00
Document last selling: 2024-04-15 17:00:00
Closing / Opening: 2024-04-16 10:40:00
Brief Description of Package: KCC/IDSRWLP/XEN/Zone-A/2023-24/W-05
Construction of rupsa wholesale fish market Sluice gate cum pump house with 5.5 cumec 3 nos submersible pumps , 3-vent (1.5 m x 1.8 m). upstream and downstream R.C.C. U channel, with 2 box culverts with fencing.
Tender Document Price: Tk. 4000; Tender Security: 18000000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 600000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 1800000000 BDT.
Thus, Official Cost Estimate should be BDT. 600000000 ~ 1800000000.

Eligibility criteria:
As per TDS and ITT
 
1. Similar nature of work : TK 35,00,00,000.00 ( Related Work to Pump house )
2. Average annual construction turnover : TK 100,00,000.00 ( Over the Best 3 Years in the Last 5 Years )
3. Liquid assets or working capital TK : 35,00,00,000.00
4. Tender Capacity : 50,00,00,000.00
5. Payment will be made upon availability of fund. For this, no claim will be entertained.
6. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive.
7. VAT & IT from bill will be as per prevailing Government Rate. No extra claim will be entertained in this regard.
8. To ensure the Quality of the material, Various tests shall be performed by the tenderer as per instruction.
 
N.B:
i. Maintenance and operation of pump house will be done by contractor free of cost for up to one year after completion of whole work.
ii. Security period will be 24 months.
iii. The contractor have to trained the operating system of pump house to three persons from KCC for free of cost.
iv. Fifty percent tender security money will be released after 12 months if the system will be run proprely.
Project: Imrovement of Drainage System for reducing Water Logging Problem in Khulna City Corporation
Location of work / delivery: Khulna City Corporation
Budget Type: Development
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: 28 KD GHOSH ROAD, City: Khulna, Thana: Khulna City Corporation, District: Khulna - 9100, Country: Bangladesh,


See more tenders from Executive Engineer Zone A; Khulna City Corporation:
972032 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-22 Construction of RCC Drain with Footpath Single Side 16 NO. Road Ward 11, DPP No - 45; Right side Drain- From Ch. 0 + 000 km to Ch. 1+769km and Left Side Drain- From Ch. 0+000km to Ch. 1+769 km, Total Drain Length = 3.194 km For Construction: Left side Drain- from Ch. 0 + 000 km to Ch. 0+942 km and Left side Ch. +130km to Ch.1+230 and Right side Drain- From Ch. 0 + 942 km to Ch. 1+769km Total Drain Length= 1.914 km
970428 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-21 Construction of 3 No. Sluice Gate and Outlet RCC drain at Rupsha Bheribadh Road.
968658 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-13 1. (24775-23-10001) Part 1 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m) under Khulna City Corporation (Phase-1) 2. (24775-24-10001) Part 2 :Approach Road of Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m) under Khulna City Corporation (Phase-1) 3. (24775-23-10002) Part 3 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m)L.Control room part 4. (24775-24-10002) Part 4 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m) L.Electric part. 5. (24775-24-10003) Part 5 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m).Automation part.
962329 : LGCRRP/KHULNA/2023-24/W-10 1. (24712-25-10012) Repair & Maintenance of Old Asphalt Plant Road & STS Connecting Road.( Ch 0.00 - 530.00 m ), Drain - 35.00 m 2. (24712-25-10013) Repair & Maintenance of Old Asphalt Plant Road & STS Connecting Road.( Ch 0.00 - 530.00 m ), Drain - 35.00 m 3. (24712-25-10014) Repair & Maintenance of Old Asphalt Plant Road & STS Connecting Road.( Ch 0.00 - 530.00 m ), Drain - 35.00 m 4. (24712-25-10015) Repair & Maintenance of Old Asphalt Plant Road & STS Connecting Road.( Ch 0.00 - 530.00 m ), Drain - 35.00 m 5. (24712-25-10032) Repair & Maintenance of Hazi Ismail Road With 1-Side Drain( Ward#19-From KDA Avenue-To-Pallimonga! More) 6. (24712-25-10033) Repair & Maintenance of Hazi Ismail Road With 1-Side Drain( Ward# 19-From KDA Avenue-To-Pallimongal More) 7. (24712-25-10034) Repair & Maintenance of Hazi Ismail Road With 1-Side Drain( Ward#19-From KDA Avinue-To-Paliirnongal More)
961845 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-10 Construction of RCC Drain beside Khalishpur 11 No. Road (Both sides Drain and Footpath/Walkway: Total Drain Length = 2.117 km Left Side Drain: from Ch. 0 + 000 km. to Ch. 1+319 km. and Right Side Drain: from Ch. 0+000 km. to Ch.1+270 km.) Ward no. 10; DPP- 43
961825 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-09 Construction of Drain from Nur Nagor Divisional Commissioner Office Gate to AG Office Left side Drain: from Ch. 0+000 km to Ch.0+142 km, Ch. 0+000A km to Ch.0+246A km and Right side Drain: from Ch. 0+145 km to 0+495 km,Ch. 04-248A km to 0+269A km. -Total Drain Length = 0.785 km; Ward-16, DPP-77.
See live tender notices for box culvert.
Share on Twitter