eGP Tender ID: 940981; Works (NCT)
APP ID: 197052;
District: Barishal
Reference No.: EE/NOA/O&M/1T- 5/265, DATED: 25-01-2024
Package Title: Precautionary Bank Protection Work along the Right Bank of Taltoli River From Km 0.859 To Km 1.109 = 0.250 Km From Erosion Of Taltoli River at Adhabaria & Adjacent Area in Charbaria Union, Barisal Sadar Upazilla, Dist. Barisal under Barisal O&M Division, BWDB, Barisal during the FY-2023-24.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Barisal O&M Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-02-01 18:00:00
Document last selling: 2024-02-28 17:00:00
Closing / Opening: 2024-02-29 13:05:00
Brief Description of Package: BSL/NDR/2023-24/W-46
Precautionary Bank Protection Work along the Right Bank of Taltoli River From Km 0.859 To Km 1.109 = 0.250 Km From Erosion Of Taltoli River at Adhabaria & Adjacent Area in Charbaria Union, Barisal Sadar Upazilla, Dist. Barisal under Barisal O&M Division, BWDB, Barisal during the FY-2023-24.
Tender Document Price: Tk. 2000;
Tender Security: 200000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 6666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 20000000 BDT.
Thus, Official Cost Estimate should be BDT. 6666666 ~ 20000000.
Eligibility criteria:
a) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, Vat Registration and TIN certificate.
b) Quoted amount of tenderer beyond 10% above/less than official estimated cost will be non- responsive.
c) It is duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluation committee could not able to open the file, no claim from the tenderer will be entertained regarding the file.
d) Vat & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard.
e) Tender evaluation will be done following the latest gazette /circular from CPTU.
f) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted.
g) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard.
h) If BWDB owned/acquired land is not sufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost.
i) Photo and video must have to be taken by the contractor at a different angle during prework and post-work measurement and submitted to the PE. No extra claim will be entertained in this regard.
j) All other criteria stated in the tender document.
k) Detail turnover calculation sheet and Ongoing work mentioning the name of work, PE name etc. (year wise over the last three years) duly signed by the Tenderer must be submitted with the tender.
Location of work / delivery: Barishal sadar
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Barisal, City: Barisal, Thana: Barishal City Corporation, District: Barishal - 8200, Country: Bangladesh,