LTM tenders of Faridpur district. |
OSTETM tenders of Faridpur zilla. |
OTM tenders of Faridpur. |
View All the active tenders of Faridpur district.
eGP Tender ID: 936251; Works (NCT)
APP ID: 196642;
District: Faridpur
Reference No.: 01/e-GP/FRD-PMP-Culvert/2023-2024
Package Title: Engineer's Estimate for Construction of 2.00 Nos R.C.C Box Culvert Single Vent 1x5.00mx 5.00m at Ch: 29+170m and Ch: 29+340m of Faridpur(Badarpur)-Saltha-Sonapur-Muksudpur Road (Z-7004) and 2.00 Nos R.C.C Box Culvert Single Vent 1x6.00mx5.00m at Ch: 4+270m and Ch: 6+274m Talma-Nagakanda Road(Z-8404) under Road Division, Faridpur during FY 2023-2024.
Organization: Roads & Highways Department (RHD)
Procuring Entity: Faridpur Road Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-01-11 18:20:00
Document last selling: 2024-02-07 17:00:00
Closing / Opening: 2024-02-08 11:30:00
Brief Description of Package: Construction of 2.00 Nos R.C.C Box Culvert Single Vent 1x5.00mx 5.00m at Ch: 29+170m and Ch: 29+340m of Faridpur(Badarpur)-Saltha-Sonapur-Muksudpur Road (Z-7004) and 2.00 Nos R.C.C Box Culvert Single Vent 1x6.00mx5.00m at Ch: 4+270m and Ch: 6+274m Talma-Nagakanda Road(Z-8404) under Road Division, Faridpur during FY 2023-2024.
Tender Document Price: Tk. 4000;
Tender Security: 1200000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 40000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 120000000 BDT.
Thus, Official Cost Estimate should be BDT. 40000000 ~ 120000000.
Eligibility criteria:
1. All tenderer(s) registered in e-GP are eligible to participate in the tender if they are otherwise qualified.
2. The tenderer(s) must fulfill the following requirements.
a) A minimum Bridge/RCC Culvert/Concrete Construction Work experience of last 5 (Five) years.
b) The minimum specific experience as a Prime Contractor in Bridge/RCC Culvert/Civil concrete Construction works of at least 01(One) contract with a value of at least Taka 2.50 (Two point five zero) Crore including item of RCC Work successfully completed in a single contract within the last 05(Five) years.
c) The required average annual construction turnover shall be greater than Tk 5.00 (Five) Crore over the last 05 (Five) years counting backward from the date of publication of tender.
d) Minimum Liquid asset of Taka 1.50 (One point five zero) Crore is required.
h) All other criteria stated in the TDS.
3. All Tenderers should submit the full name of their firm.
4. A tenderer not having sufficient information in the TDMS system of RHD Web Site may be evaluated as ineligible.
Location of work / delivery: Road Division, Faridpur
Budget Type: Revenue
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Faridpur Road Division, Sarak Bhaban, Faridpur, City: Faridpur, Thana: Faridpur Sadar, District: Faridpur - 0001, Country: Bangladesh,
See more tenders from
Faridpur Road Division; Roads & Highways Department (RHD):
1269866 : 101/e-GP/FRD/2025-2026
Supply and laying of Asphalt Materials for Emergency Repairing at Different km at Different Road of Road Sub-Division-I, Section-II & III, Under Road Division, Faridpur during the Year 2025-2026.
1262004 : 100/e-GP/FRD/2025-2026
Road Widening with HBB work at 6th(P) Km of Bhanga-Faridpur(Goalchamot) National Highway (N-804) Under Road Division, Faridpur during the Year 2025-2026.
1181843 : 07/e-GP/FRD/2025-2026 PMP Bridge/Culvert
PMP (Major-Bridge/Culvert) work for Construction of 01 Nos P.C Girder (Bailagotti) Bridge Span 44.02m (1x42.68m) Long at 13th km ( Ch: 12+397m) of Faridpur(Badarpur)-Saltha-Sonapur-Muksudpur Zilla Highway (Z-7004) under Road Division Faridpur during the year 2025-2026.
1181842 : 06/e-GP/FRD/2025-2026 PMP Bridge/Culvet
Re- Construction of 01 Nos P.C Girder (Kalikhola) Bridge Span 44.02m(1x42.68m) Long at 31st km( Ch: 30+978m) of Goalondo - Faridpur-Tarail Zilla Highway (Z-7108) under Road Division Faridpur during the year 2025-2026.
1181841 : 05/e-GP/FRD/2025-2026 PMP Bridge/Culvert
PMP (Major-Bridge) work for Re-Construction of 1 Nos P.C Girder (Malopara) Bridge Span 44.02m (1x42.68m) Long at 51st km (Ch: 50+586m) of Goalondo-Faridpur-Tarail Zilla Highway (Z-7108) under Road Division Faridpur During the FY 2025-2026.
1177941 : 04/e-GP/FRD/2025-2026 PMP Major Road
Periodic Maintenance Programme (PMP-Major Roads) Repairing and Maintening with DBS Base; Wearing Course and Rigid Pavement at Ch. 00+000 (Bhanga Rastar More) to Ch. 5+539 ( S.S. Ghat) of Faridpur Town Old Section (Alipur-Faridpur-SS Ghat) Road (N-803) under Road Division, Faridpur During the year 2025-2026.