eGP Tender ID: 935554; Works (NCT)
APP ID: 200993; District: Dhaka
Reference No.: LGCRRP-Memo No. 46.02....23-2.559;Date:18-12-2023.
Package Title: (1) Construction of RCC Drain with slab at starting from Bank Colony Bazar Road Walton Plaza Mr. Toru Bepary House Via Mrs. Mahbuba Parvin House in ward no - 05, Savar Pourashava, Savar, Dhaka. (Ch-0.00-82.00 m).
Organization: Savar Paurashava
Procuring Entity: Office of the Savar Pourashava, Dhaka
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-01-31 14:00:00
Document last selling: 2024-02-28 16:00:00
Closing / Opening: 2024-02-29 14:00:00
Brief Description of Package: (1) Construction of RCC Drain with slab at starting from Bank Colony Bazar Road Walton Plaza Mr. Toru Bepary House Via Mrs. Mahbuba Parvin House in ward no - 05, Savar Pourashava, Savar, Dhaka. (Ch-0.00-82.00 m). (2) Upgrading of R.C.C Road at Starting from Bank Colony Bazar Road Walton Plaza Mr. Toru Bepary House Via Mrs. Mahbuba Parvin House in ward no - 05, Savar Pourashava, Savar, Dhaka. (Ch-0.00-82.00 m). (3) Upgrading of R.C.C Road & R.C.C Slab With Drain Repair at starting from Bank Colony Usha Garden to Mr. Abdur Rosid House in ward no - 05, Savar Pourashava, Savar, Dhaka. (Ch. 0.00-135.00m). (4) Upgrading of R.C.C Road at Starting from Jamsing Alal Mollah House to Mr. Nantu House Via Mr. Kamal House in ward no - 01, Savar Pourashava, Savar, Dhaka. (Ch. 0.00-300.00m). (5) Upgrading of RCC Road from starting from H/O Akum Ali to H/O Badsha Mia via H/O Dr. Asma Akter Jahan at Vatpara in ward no - 01, under Savar Pourashava, Savar, Dhaka. (Ch. 0.00-162.00m).
Tender Document Price: Tk. 2000; Tender Security: 350000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 11666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 35000000 BDT.
Thus, Official Cost Estimate should be BDT. 11666666 ~ 20000000.

Eligibility criteria:
As per TDS.
Project: Local Government COVID-19 Response and Recovery Project, (Savar Pourashava)
Location of work / delivery: Savar Pourashava Area
Budget Type: Development
Development Partner: World Bank
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Savar Pourashava, Dhaka, City: Savar, Thana: Savar, District: Dhaka - 1340, Country: Bangladesh,


See more tenders from Office of the Savar Pourashava, Dhaka; Savar Paurashava:
935553 : LGCRRP/SAV/23-24/W-16 (1) Construction of RCC Drain with slab at starting from Anondopur Biman Building mor to Anondopur Madrasa near - - House in ward no - 09, Savar Pourashava, Savar, Dhaka. (Ch-0.00-390.00 m). [LIPW] (2) Construction of RCC Drain with slab at starting from Savar Pourashava Main Gate to Dhaka-Aricha Highway Near Mr. Hoque House(Ch-0.00-65.00 m); Link:Savar Pourashava Compound (Link:-Ch-0.00-45.00 m) in ward no - 09, Savar Pourashava, Savar, Dhaka. (Total=Ch-0.00-110.00 m). [LIPW] (3) Upgrading of R.C.C Road at Starting from from Savar Pourashava Main Gate to Dhaka-Aricha Highway Near Mr. Hoque House(Ch-0.00-65.00 m); Link:Savar Pourashava Compound (Link:-Ch-0.00-45.00 m) in ward no - 09, Savar Pourashava, Savar, Dhaka. (Total=Ch-0.00-110.00 m). [LIPW]
935552 : LGCRRP/SAV/23-24/W-15 (1) Construction of RCC Drain (With Slab) starting from Uttor Rajation Kali Factory to H/O Mr.Sohrab Police in ward no - 08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-200.00m). [LIPW] (2) Upgrading of RCC Road starting from Uttor Rajation Kali Factory to H/O Mr.Sohrab Police in ward no - 08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-200.00m). [LIPW] (3) Construction of RCC Drain (With Slab) starting from Rajation -Birulia Main road near Garage to H/O Mr. Shohag via Poly Factory in ward no - 08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-200.00m). [LIPW] (4) Upgrading of RCC Road starting from Rajation -Birulia Main road near Garage to H/O Mr. Shohag via Poly Factory in ward no - 08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-200.00m). [LIPW] (5) Upgrading of RCC Road starting from Rajation - Birulia Main road to Dhorendha Primary School via Senzosef School & College in ward no -08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-270.00m). [LIPW] (6) Construction of RCC Drain (With Slab) starting from Rajation -Birulia Main road to Dhorendha Primary School via Senzosef School & College in ward no -08, under Savar Pourashava, Savar, Dhaka. (Ch0.00-270.00m). [LIPW]
935550 : LGCRRP/SAV/23-24/W-14 (1) Construction of RCC Drain with slab at starting from Mojidpur Mr. Poros Store to Mojidpur Dighir Par.(Ch. 0.00-275.00m) (2) Upgrading of R.C.C Road at Starting from Mojidpur Mr. Poros Store to Mojidpur Dighir Par.(Ch. 0.00-275.00m) (3) Upgrading of RCC Road from starting from Moddi Rajation Romjan Mosque road Near H/O Mizanur Rahman to H/O Abul Kalam in ward no - 08, under Savar Pourashava, Savar, Dhaka. (Ch. 0.00-146.00m). (4) Construction of RCC Drain with slab at starting from Dogormora Soronika Road Mr. Sahin Store to Mr. Somon Aly House to Mr. Majahar Saheb House to Mr. Hasan Master House in ward no - 07, Savar Pourashava, Savar, Dhaka. (Ch-0.00-185.00 m). (5) Upgrading of R.C.C Road at Starting from Dogormora Soronika Road Mr. Sahin Store to Mr. Somon Aly House to Mr. Majahar Saheb House to Mr. Hasan Master House in ward no - 07, Savar Pourashava, Savar, Dhaka. (Ch-0.00-185.00 m).
935549 : LGCRRP/SAV/23-24/W-13 (1) Upgrading of R.C.C Road & R.C.C Slab With Drain Repair at starting from Dhaka-Aricha Road Near NRB Bank to Kornopara Mr. Borhan House Via Mr. Nozrul House in ward no - 06, Savar Pourashava, Savar, Dhaka. (Ch. 0.00-150.00m). (2) Construction of RCC Drain with slab at starting from Kornopara Blutex mor to M/S. Sojib Jenaral Store in ward no - 06, Savar Pourashava, Savar, Dhaka. (Ch-0.00-110.00 m). (3) Upgrading of R.C.C Road at Starting from Kornopara Blutex mor to M/S. Sojib Jenaral Store in ward no - 06, Savar Pourashava, Savar, Dhaka. (Ch-0.00-110.00 m). (4) Construction of RCC Road starting from J K road Near H/O Mizanur Rahman to H/O Awkat Hossain at Vagolpur( Dokhin Doriarpur) in ward no - 06, under Savar Pourashava, Savar, Dhaka. (Ch0.00-116.00m).` (5) Construction of RCC Drain (With Slab) starting from H/O Engr. Shamsuddin to H/O Abdul Hamid via H/O Mr.Sarjent Baniwul at Rajabari in ward no - 06, under Savar Pourashava, Savar, Dhaka. (Ch0.00-124.00m). (6) Upgrading of RCC Road starting from H/O Engr. Shamsuddin to H/O Abdul Hamid via H/O Mr.Sarjent Baniwul at Rajabari in ward no - 06, under Savar Pourashava, Savar, Dhaka. (Ch0.00-124.00m). (7) Construction of RCC Drain with slab at starting from West Talbug Sorkar Jenarel Store to Mr. Khalek House in ward no - 06, Savar Pourashava, Savar, Dhaka. (Ch. 0.00-135.00m) (8) Upgrading of R.C.C Road at Starting from West Talbug Sorkar Jenarel Store to Mr. Khalek House in ward no - 06, Savar Pourashava, Savar, Dhaka. (Ch. 0.00-135.00m)
935548 : LGCRRP/SAV/23-24/W-12 (1) Construction of RCC Drain (With Slab) starting from Dhaka- Aricha High way Near Boron Garage to Chapra Mosque at Bank Colony in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch0.00-275.00m). [LIPW] (2) Construction of RCC Drain (With Slab) starting from Happy Ail School to Near Bazar road H/O Mr Mohashin via Shohid Acadamic Shool & Anzelika School at Bank Colony in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch75.00-135.00m=60.0m). [LIPW] (3) Upgrading of RCC Road starting from Happy Ail School to Near Bazar road H/O Mr Mohashin via Shohid Acadamic Shool & Anzelika School at Bank Colony in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch00.0-135.00m)). [LIPW] (4) Upgrading of RCC Road starting from H/O Mr. Fozlu to H/O Mrs Darfin Akter at Bank Colony in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch00.0-33.00m). [LIPW] (5) Re Construction for vertical Extention of Brick drain with top Slab RCC Road starting from H/O Mr. Fozlu to H/O Mrs Darfin Akter at Bank Colony in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch00.0-33.00m). [LIPW] (6) Construction of RCC Drain (With Slab) starting from Bazar road Near Old Bata Building to H/O Mr.Engr. Nasir at Bank Colony in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch0.00-138.00m). [LIPW] (7) Upgrading of RCC Road starting from Bazar road Near Old Bata Building to H/O Engr.Mr Nasir at Bank Colony in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch0.00-138.00m). [LIPW] (8) Construction of RCC Drain (With Slab) starting from H/O Mr. Polash to H/O Mrs.Easmin Khanom Via H/O Mr. Abdul Halim in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch0.00-260.00m). [LIPW] (9) Upgrading of RCC Road starting from H/O Mr. Polash to H/O Mr.Sakander Ali Via H/O Mrs.Easmin Khanom in ward no - 05, under Savar Pourashava, Savar, Dhaka. (Ch0.00-255.00m). [LIPW]
Share on Twitter