Login |Register

LTM tenders of Noakhali district. | OSTETM tenders of Noakhali zilla. | OTM tenders of Noakhali. | View All the active tenders of Noakhali district.

eGP Tender ID: 932350; Works (NCT)
APP ID: 196922; District: Noakhali
Reference No.: EE/NOA/O&M/1T- 5/2183, DATED: 03/01/2024
Package Title: Re-excavation of Mollahgram khal from km. 0.00 to km. 2.500 = 2.500 km. at Boyer Char Polder of Hatiya Upazilla, District: Noakhali in connection with "Char Development and Settlement Project- Bridging (Additional Financing) (BWDB Part)(1st revised)" under Noakhali O&M Division, BWDB, Noakhali during the year 2023-2024.(Package No. CDSP-B/W 47)
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Noakhali O&M Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-01-04 10:00:00
Document last selling: 2024-01-18 11:00:00
Closing / Opening: 2024-01-18 12:00:00
Brief Description of Package: Re-excavation of Mollahgram khal from km. 0.00 to km. 2.500 = 2.500 km. at Boyer Char Polder of Hatiya Upazilla, District: Noakhali in connection with "Char Development and Settlement Project- Bridging (Additional Financing) (BWDB Part)(1st revised)" under Noakhali O&M Division, BWDB, Noakhali during the year 2023-2024.(Package No. CDSP-B/W 47)
Tender Document Price: Tk. 1000; Tender Security: 75000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 2500000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 7500000 BDT.
Thus, Official Cost Estimate should be BDT. 2500000 ~ 5000000.

Eligibility criteria:
Special Notes"
1) The cost of these packages is comprised of GoB grant and IFAD Loan. IFAD Loan will not be reimbursed for works, which could not be completed by May, 2024.
2) As part of financial management, both GoB part and IFAD part shall be paid against Running Arrear Bills, if the achievement at field level progress is equal to or more than pro-rata progress on the date of entry of RA Bill.
3) In case of failure to complete the works of these package with in May, 2024, payment from IFAD Loan part shall not be made and will not be reimbursed. Only after Revision of RDPP of CDSP-B(AF) (BWDB part), payments payable from IFAD Loan part for completed works shall be decided upon approval from competent authority of Government of Bangladesh. For total completion of works of these packages within May 2024, both GoB Grant and IFAD Loan part shall be paid, in full.
Eligibilities:
1. All tenderers/firms must be registered with CPTU through the e-GP portal.
2. All administrative orders regarding payment issued from time to time will be followed strictly.
3. Payment will be paid on the availability of fund.
4. Scope of work/ contract price may be reduced depending on the actual field conditions.
5. The contractor must visit the site and get acquainted with the condition of the site, the scope of work, and the available workspace before tendering.
6. No fees will be provided for the preparation and submission of the offer.
7. The contractor has to keep video and image records of the work in different stages (before starting, during, and after completion) at his own cost and submit the same to the office of the Executive Engineer. (Circular attached in Section 7).
8. Volume of work may be increased or decreased depending upon the actual field condition.
Project: Char Development and Settlement Project- Bridging (Additional Financing) (BWDB Part)
Location of work / delivery: Boyer Char Polder of Hatiya Upazilla
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Noakhali, City: Noakhali, Thana: Noakhali Sadar, District: Noakhali - 3800, Country: Bangladesh,


See more tenders from Noakhali O&M Division; Bangladesh Water Development Board (BWDB):
972830 : NOA/NDR/2023-2024/W-13 Construction of Retired Embankment from km 22.700 to km 23.500 = 800.00 m at Polder 73/1(A+B) of Hatiya Upazila in C/W "Non Development Revenue Budget" under Noakhali O&M Division, BWDB, Noakhali during the year 2023-2024 (Package No. NOA/NDR/2023-2024/W-13)
972828 : NOA/NDR/2023-2024/W-11 Re-sectioning of embankment from km. 0.000 to km. 1.243 = 1243 m at right bank of Azmardona Khal at Polder 73/1(A+B) of Hatiya Upazila in C/W "Non-Development Revenue Budget" Under Noakhali O&M Division, BWDB, Noakhali during the year 2023-2024 (Package No. NOA/NDR/2023-2024/W-11)
972827 : NOA/NDR/2023-2024/W-10 Repair & Maintenance of Road and Drain to improve the Drainage System of Polder No. 59/1B under Noakhali O&M Division, BWDB, Noakhali in connection with ''Non Development Revenue Budget'' during The Year 2023-24. (Package No. NOA/NDR/2023-2024/W-10)
968297 : NOA/NDR/2023-2024/W-7 Construction of Main Gate of Noakhali O&M Division Office In C/W "Revenue Budget" at Sadar Upazila of Noakhali District under Noakhali O&M Division, BWDB, Noakhali During the year 2023-2024 (Package No. NOA/NDR/2023-2024/W-7)
960238 : Noa-NCP-RBP/W-20/2023-24 Protective work on the left bank of Meghna river from Km 16.669 to Km 17.046 = 377.00 m at Noler Char area, Upazila: Hatiya in c/w "Implementation of Protective work to Protect the Infrastructures Constructed at Noler Char of Hatiya Upazila in Noakhali District from the Erosion of Meghna River" under Noakhali O&M Division, BWDB, Noakhali during the year 2023-2024.
960237 : Noa-NCP-RBP/W-19/2023-24 Protective work on the left bank of Meghna river from Km 16.292 to Km 16.669 = 377.00 m at Noler Char area, Upazila: Hatiya in c/w "Implementation of Protective work to Protect the Infrastructures Constructed at Noler Char of Hatiya Upazila in Noakhali District from the Erosion of Meghna River" under Noakhali O&M Division, BWDB, Noakhali during the year 2023-2024.
Share on Twitter