LTM tenders of Kushtia district. |
OSTETM tenders of Kushtia zilla. |
OTM tenders of Kushtia. |
View All the active tenders of Kushtia district.
eGP Tender ID: 855692; Works (NCT)
APP ID: 195221;
District: Kushtia
Reference No.: 46.03.5000.061.07.165.23.83; Dated: 20-July-2023
Package Title: Construction of Eight (08) Nos. of Single Storied Pre-fabricated WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at Daulatpur, Kushtia under Need Based Infrastructure Development of Government Primary Schools (NBIDGPS-1) in 2023-2024 fiscal year
Organization: Department of Public Health Engineering (DPHE)
Procuring Entity: Office of the Executive Engineer,DPHE,Kushtia
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2023-07-20 15:30:00
Document last selling: 2023-08-13 16:00:00
Closing / Opening: 2023-08-14 12:00:00
Brief Description of Package: Construction of Eight (08) Nos. of Single Storied Pre-fabricated WASH Block for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at Daulatpur, Kushtia under Need Based Infrastructure Development of Government Primary Schools (NBIDGPS-1) in 2023-2024 fiscal year
Tender Document Price: Tk. 2000;
Tender Security: 230000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 7666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 23000000 BDT.
Thus, Official Cost Estimate should be BDT. 7666666 ~ 20000000.
Eligibility criteria:
As per TDS and PCC
Moreover, The recent amendment of PPA,2006 which is made vide Act no.37 of 2016 and published vide Bangladesh Gazettee registered no. D A-1 on 01.08.2016 ( 17 Srabon 1423) , of which according to the cluase no. 07 & sub-cluase no.03 "For Open Tender Method (OTM) for procurement of works Tenderer will be considered as non-responsive if the quated rate is 10% more or less than the official cost estimates". On the other hand according to sub-cluase no.04 of cluase no.07, "If the quated rate of all Tenderers are found equal, then reponsive Tendrer will be selected as per rule, but not through Lottery".
The Tenderer must submit upto date valid IT and VAT certificate of 2022-2023 fiscal year and trade license of 2023-2024 fiscal year.
Tenderer must fill up all the forms carefully (e.g. e-PW1-3(A) and e-PW2-3(B)). Tenderer must declaire his running works in detail. Otherwise According to Public Procurement Rules, 2008 Rule no. 127 this will be considered as fraudulent practice.
Project: Need Based Infrastructure Development of Government Primary Schools Project (1 st phase) (NBIDGPS-1)
Location of work / delivery: Daulatpur, Kushtia
Budget Type: Development
Category: Building completion work; Construction work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work
PE Address: Office of the Executive Engineer,DPHE,Kushtia, City: Kushtia, Thana: Kushtia Sadar, District: Kushtia - 7000, Country: Bangladesh,