eGP Tender ID: 839168; Works (NCT)
APP ID: 193841;
District: Faridpur
Reference No.: 27.22.2947.803.50.091.23.681; 25-05-2023
Package Title: Construction work of 11KV line for feeder division in Vanga Bissho road 33/11KV Sub-station under Vanga ESU.
Organization: West Zone Power Distribution Company Ltd (WZPDCL)
Procuring Entity: Office of the Executive Engineer, Distribution Division -3 ,EAUPDSP, Faridpur
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2023-06-06 09:00:00
Document last selling: 2023-07-04 17:00:00
Closing / Opening: 2023-07-05 14:00:00
Brief Description of Package: Construction works of 11KV line for feeder division in Bhanga Bissho road 33/11KV Sub-station under Bhanga ESU.
Tender Document Price: Tk. 1000;
Tender Security: 17000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 566666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 1700000 BDT.
Thus, Official Cost Estimate should be BDT. 566666 ~ 1700000.
Eligibility criteria:
a) Tenderers must be 1st class enlisted electrical contractor having valid ABC license from electricity licensing board of Govt. of Bangladesh.
b) The tenderer must be a contractor/construction firm who have minimum 5 (five) years in general experience in construction and renovation of 33kv, 11kV, 11/0.4kV & 0.4kV distribution line & Installation of Distribution Transformer. No falsified certification is allowed.
c) Tenderer must have satisfactory genuine work completion certificate of similar work volume of which will be minimum Tk 500000(Five Lakh) under minimum 01(one) of contract(s) over a period of 5 (Five) years shall be required issued from BPDB, WZPDCL, DESCO, DPDC,NESCO not below the rank of Executive Engineer under whom the work was done.
d) Tenderer must have upto date income tax clearance, VAT registration and trade license.
e) Annual audit report from a recognized Chartered Accounted firm for the last 3 (three) years.
f) Average annual volume of construction turn over shall be minimum Tk 600000(Six Lakh over the last 3 (Three) years .
g) Liquid assets/availability of funds and/or credit facilities from bidder's banker(s) at least Tk 600000(Six Lakh).
h) Tenderer shall under no circumstances assign the works or any part of it to the sub-contractor(s).
i) Total amount of quoted value must be between +10% to -10% of estimated cost. Otherwise the tender document will consider as rejected
j)Tenderer must have eligibility and conformity of Materials, Equipment’s, Manpower and Services, National ID (NID), Authorization letter.
k) For more than one contract signing liquid money must be the sum of liquidity of those individual tenders.
l) The tenderer must submit the detailed certified information about the manpower which will be engaged for this work
Project: Distribution Division, EAUPDSP, WZPDCL, Faridpur
Location of work / delivery: Bhanga Upazila
Budget Type: Development
Category: Electricity distribution and related services; Public utilities; Electricity distribution; Operation of electrical installations
PE Address: Goalchamot Faridpur, City: Faridpur, Thana: Faridpur Sadar, District: Faridpur - 7600, Country: Bangladesh,