eGP Tender ID: 774820; Works (NCT)
APP ID: 190110;
District: Noakhali
Package Title: Construction of Retired Embankment From km 4.000 (12.960) to km 5.500 (14.460) = 1.500 km. at Noler char in Hatiya Upazilla in c/w CDSP- Bridging (Additional Financing) Project under Noakhali O&M Division, BWDB, Noakhali during the year 2022-2023.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Noakhali O&M Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2023-01-10 05:00:00
Document last selling: 2023-02-01 11:00:00
Closing / Opening: 2023-02-01 12:40:00
Brief Description of Package: Construction of Retired Embankment From km 4.000 (12.960) to km 5.500 (14.460) = 1.500 km. at Noler char in Hatiya Upazilla in c/w CDSP- Bridging (Additional Financing) Project under Noakhali O&M Division, BWDB, Noakhali during the year 2022-2023.
Tender Document Price: Tk. 4000;
Tender Security: 700000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 23333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 70000000 BDT.
Thus, Official Cost Estimate should be BDT. 23333333 ~ 70000000.
Eligibility criteria:
Eligibilities:
1. All tenderers/firms must be registered with CPTU through the e-GP portal.
2. All administrative orders regarding payment issued from time to time will be followed strictly.
3. Payment will be paid on the availability of fund.
4. Scope of work/ contract price may be reduced depending on the actual field conditions.
5. The contractor must visit the site and get acquainted with the condition of the site, the scope of work, and the available workspace before tendering.
6. No fees will be provided for the preparation and submission of the offer.
7. The contractor has to keep video and image records of the work in different stages (before starting, during, and after completion) at his own cost and submit the same to the office of the Executive Engineer. (Circular attached in Section 7).
8. Volume of work may be increased or decreased depending upon the actual field condition.
Special Condition:
Condition:1) Finalization & acceptance of evaluation, and issuance of NOA shall be subjected to availability of budget comprising of (a) savings from approved evaluated/contract prices of packages W41, W42. W43& W44 and (b) rest amount of budget/DPP cost available for retired embankment. The summation of savings and rest of DPP cost shall be equal to or greater than final evaluated price of this package W45 for issuance of NOA.
Condition:2) In case, the final evaluated price is greater than comprised amounts in condition (1) the acceptance of evaluation and issuance of NOA shall be subjected to approval of RDPP.
Project: Char Development and Settlement Project- Bridging (Additional Financing) (BWDB Part)
Location of work / delivery: Hatiya,Noakhali
Budget Type: Development
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work; Construction work for water projects; Hire of earthmoving equipment with operator; Hire of construction and civil engineering machinery and equipment with operator;
PE Address: Noakhali, City: Noakhali, Thana: Noakhali Sadar, District: Noakhali - 3800, Country: Bangladesh,