LTM tenders of Lakshmipur district. |
OSTETM tenders of Lakshmipur zilla. |
OTM tenders of Lakshmipur. |
View All the active tenders of Lakshmipur district.
eGP Tender ID: 740383; Works (NCT)
APP ID: 188102;
District: Lakshmipur
Package Title: Repair of Existing Bituminous Pavement By SBST work & Earth work at 90 th(p) km to 92 nd Km of Comilla -Lalamai- Road (R-140) under Lakshmipur Road Division during the year 2022-2023.
Organization: Roads & Highways Department (RHD)
Procuring Entity: Lakshmipur Road Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-10-11 18:00:00
Document last selling: 2022-10-26 15:00:00
Closing / Opening: 2022-10-27 13:00:00
Brief Description of Package: Repair of Existing Bituminous Pavement By SBST work & Earth work at 90 th(p) km to 92 nd Km of Comilla -Lalamai- Road-Chandpur-lakshmipur-Begumganj Road (R-140) under Lakshmipur Road Division during the year 2022-2023.
Tender Document Price: Tk. 1000;
Tender Security: 120000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 4000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 12000000 BDT.
Thus, Official Cost Estimate should be BDT. 4000000 ~ 5000000.
Eligibility criteria:
All Bangladeshi National tenderers regardless of whether enlisted or not enlisted with the employer may submit Tenders provided that they are qualified as per Qualification Criteria Specified in the clause no.4 of Instructions to Tenderer (ITT) in the Tender Document and must be registered in the e-GP system under appropriate user category of procurement process.
Location of work / delivery: Lakshmipur
Budget Type: Revenue
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work;
PE Address: Lakshmipur Road Division, Sarak Bhaban, Lakshmipur, City: Lakshmipur, Thana: sadar, District: Laksmipur - 0000, Country: Bangladesh,
See more tenders from
Lakshmipur Road Division; Roads & Highways Department (RHD):
1230864 : eGP-23/OTM/LRD/PMP-Minor/Emergency/2025-2026
Emergency Repair & Seal Coat work with Partial Strengthening of existing Bituminous Pavement By Aggregate Base Type-II Protective Work & Earth Work at Ch-1+100 m to Ch-1+700 m of Sardarbari-Khairhat-Mollarhat-Raipur Road (Z-1472) under Lakshmipur Road Division during the year 2025-2026.
1221125 : eGP-36/OTM/LRD/PMP-Sign-Signal/2025-2026
Installation of Sign-signal and Road Marking work from Ch. 0+000 m to Ch. 2+250 m. of Lakshmipur Town Bridge to Terobaki Road (R-147) under Lakshmipur Road Division during the year 2025-2026.
1217714 : eGP-34/OTM/LRD/Survey/2025-2026
Topographical Survey, Sub-Soil Investigation, Cadastral Survey (CS), Revisional Survey (RS), Land Acquisition Plot Schedule, Cross Section & Earth work Calculation for Meghna Road (Lakshmipur Bagbari to Khoyasagor Digirpar Connecting), Cumilla-Lalmai-Chandpur-Lakshmipur Road (R-140), Chandpur-Nanupur-Chandra-Kamtabazar-Ramgonj Road (Z-1412) & Muddafargonj-Chitosi-Ramganj Road (Z-1407) under Lakshmipur Road Division during the year 2025-2026.
1187071 : eGP-25/OTM/LRD/Shed/2025-2026
Construction of Mechanical work shed at Division Office Compound under Lakshmipur Road Division during the Year 2025-2026.
1187068 : eGP-24/OTM/LRD/PMP-Minor/2025-2026
Necessary repairing Work on the Existing Damaged Road Pavement, Carpeting & Seal Coat Work at 18th (p) km of Sahid Mazharul Munir Sarak (Maijdee-Islamia-Uderhat-Dasherhat-Newteyariganj-Bhavaniganj Road (Z-1429) Under Road Division Lakshmipur during the year 2025-2026.
1187065 : eGP-23/OTM/LRD/PMP-Minor/Emergency/2025-2026
Emergency Repair & Seal Coat work with Partial Strengthening of existing Bituminous Pavement By Aggregate Base Type-II Protective Work & Earth Work at Ch-1+100 m to Ch-1+700 m of Sardarbari-Khairhat-Mollarhat-Raipur Road (Z-1472) under Lakshmipur Road Division during the year 2025-2026.