eGP Tender ID: 736913; Works (NCT)
APP ID: 187716; District: Sylhet
Package Title: Periodic Maintenance Providing DBSWC Including Strengthening and Widening Work at Ch. 45+600 (Barolekha Court) to 48+300 (Shahbazpur Rail Gate), 4 (four) nos Culvert extension, Road Divider, Sign-Signal, KM posts etc of Rajnagar - Kulaura - Juri - Barlekha - Beanibazar - Sheola - Charkhai Road (R-281) under Road Division, Moulvibazar during the year 2022-2023.
Organization: Roads & Highways Department (RHD)
Procuring Entity: Sylhet Zone
Procurement Method: One stage Two Envelopes Tendering Method
IFT Published on: 2022-10-23 21:00:00
Document last selling: 2022-11-27 15:00:00
Closing / Opening: 2022-11-28 12:00:00
Brief Description of Package: Periodic Maintenance Providing DBSWC Including Strengthening and Widening Work at Ch. 45+600 (Barolekha Court) to 48+300 (Shahbazpur Rail Gate), 4 (four) nos Culvert extension, Road Divider, Sign-Signal, KM posts etc of Rajnagar - Kulaura - Juri - Barlekha - Beanibazar - Sheola - Charkhai Road (R-281) under Road Division, Moulvibazar during the year 2022-2023
Tender Document Price: Tk. 4000; Tender Security: 8750000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 291666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 875000000 BDT.
Thus, Official Cost Estimate should be BDT. 291666666 ~ 875000000.

Eligibility criteria:
1.All tenderers whether enlisted or not with the employer may submit Tenders provided that they are qualified as per Qualification Criteria Specified in the Tender Data Sheet (TDS) of the Tender Document.
2. If the quoted rate of any item deviates more than  (5%) Five Percent compared to the  RHD schedule of rates 2019, then the tenderer must enclose rate analysis following RHD standard format in support of the quoted rate of that item with the tender.
3.The tenderer should mentioned the full name of his/her individual organization or Joint Venture, Consortium or Association ( No abbreviation is allowed).
Special Instructions for Tenderer:
1. Qualification information and evidences (such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc) of the Tenderers as mapped in the e-GP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time.
2. If there is any conflicting information in TDMS and e-GP, the information provided in the e-GP system shall prevail.
3. If any same Certificate found in twice or more in the scrutiny of the Tender Evaluation Processes the tenderer will be considered as non-responsive.
4. A Tenderer not having sufficient information in the TDMS system may be evaluated as ineligible.
5.For submission of any false information shall consider the Tenderer Non-Responsive and be debarred. The Tenderer has to submit all Litigation History related to construction works with relevant documents. 
6. On-going work must be submitted all PE organization & other Organization
7. The Tenderer have to ensure by certification that the listed Manpower & Equipment will be used only for this particular package.
Note;All others information are available in TDS
Location of work / delivery: Moulvibazar
Budget Type: Revenue
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work;
PE Address: Additional Chief Engineer, RHD, Roynagar Rajbari, Sylhet., City: Sylhet, Thana: Sadar, District: Sylhet - 3100, Country: Bangladesh,


See more tenders from Sylhet Zone; Roads & Highways Department (RHD):
811872 : e-GP/26/PMP-Bridge Major/ACE/SZ/MOUL/2022-2023 Reconstruction of 94.29 m long Prestressed Concrete Girder Chaitraghat Bridge at 10th km of Moulvibazar - Shamshernagar - Chatla Check Post Road (Z-2002) under PMP (Major-Bridge) Programme under Road Division, Moulvibazar of Road Zone, Sylhet during the year 2022-2023.
744888 : e-GP/23/DEV/ACE/SZ/Sun/2022-2023 Re-construction of existing Pavement at Ch.37+200 Km to Ch.45+200 Km and Construction of 25.740 meter (1x24.40m) long PC Girder Bridge (Darain Bridge) at 38th Km (h.37+312m), 25.740 meter (1x24.40m) long PC Girder Bridge (Bholanagor Bridge) at 38th Km (Ch.37+989m) 28.78 meter (1x27.44m) long PC Girder Bridge (Anandapur Bridge) at 40th Km (Ch.39.368m) 31.828 meter (1x30.488m) long PC Girder Bridge (Angaura Bridge) at 42nd Km (Ch.41+472m) , 31.828 meter (1x30.488m) long PC Girder Bridge (Sukline Bridge) at 45th Km (Ch.43+599m) including approach Road, Toe Wall, Protective Work, Construction of 1 No. RCC Pile Culvert, Construction of 7 Nos. RCC submergible Culvert, Construction of Bus-Bay etc. on Madanpur-Dirai-Shullah-Jalshuka-Ajmirigonj Road (Z-2807) under Sunamganj Road Division of Road Zone Sylhet during the year 2022-2023. (Package No. WP-04)
744887 : e-GP/24/DEV/ACE/SZ/Sun/2022-2023 Construction of 143.809 meter (2x24.40m +2 x 45.732m) long PC Girder Bridge (Khatoir Bridge) at 1st Km (Ch.0+430.00m) 44.020 meter (1 x 42.680m) Long PC Girder Bridge (Boglakhara Bridge) at 6th Km (Ch.5+411.00m) & 40.974 meter ( 1 x 39.634m) Long PC Girder Bridge (Dogapur Bridge) at 12th Km (Ch.11+939.00m) including Approach Road, Diversion Road, Toe Wall, Protective Work and Construction of Rigid Pavement, Bus-Bay RCC U Drain etc. at Different locations on Madanpur-Dirai-Shullah-Jalshuka-Ajmirigonj Road (Z-2807) under Sunamganj Road Division of Road Zone Sylhet during the year 2022-2023. (Package No. WP-01)
743873 : e-GP/23/PMP-Bridge/ACE/SZ/SYL/2022-2023 Construction of 76.01m (24.40m x 3) Long PC Girder Fatur Khara Bridge at 21st Km (Ch.20+762.66m) of Sylhet -Telikhal-Sultanpur-Balaganj Road (Z-2013) under Road Division, Sylhet of Road Zone Sylhet During the year 2022-2023.
742918 : e-GP/22/DEV/ACE/SZ/Sun/2022-2023 Reconstruction of existing Pavement at Ch.25+700 Km to Ch.31+950 km and Construction of 28.78 Meter (1 x 27.44m) Long PC Girder Bridge (Nayagaon Bridge) at 31st Km (Ch.30+220m), 25.74 Meter (1 x 24.40) long PC Girder Bridge (Noagaon Bridge) at 32nd Km (Ch.31+568m) including Approach Road, Toe Wall, Protective Work, Construction of 2 Nos RCC submergible Culvert, Construction of Bus-Bay etc. on Madanpur-Dirai-Shullah-Jalshuka-Ajmirigonj Road (Z-2807) under Sunamganj Road Division of Road Zone Sylhet during the year 2022-2023. (Package No. WP-02)
736660 : e-GP/09/PMP-Road Major/ACE/SZ/MOU/2021-2022 Periodic Maintenance Programme Providing DBSWC with Partially Strengthening From Ch.0+000Km (Brahman Bazar) to Ch. 8+450Km (Bangla Tila), From Ch.8+750Km (Bangla Tila) to Ch. 9+900Km (Tilagaon), From Ch.10+400Km (Tilagaon) to Ch. 11+900Km (Kotarkona), From Ch.12+000Km (Kotarkona) to Ch. 15+450Km (Rail Gate) & From Ch.15+950Km (Rail Gate) to Ch. 17+060km (Shamshernagar Airport), Sign Signal, Guide Post, RCC Palasiding & RCC U-Drain etc. of Kulaura - Shamshernagar - Sreemongal Road (Z-2003) under Road Division, Moulvibazar during the year 2021-2022.
734976 : e-GP/20/PMP-Road Major/ACE/SZ/SYL/2022-2023 Emergency Rehabilitation of Flood Damaged Pavement at Ch.57+501(Baroigram) to 58+909(Thanabazar)); Ch.58+924(Thanabazar South) to 58+996 (Thanabazar), Ch.59+011(Thanabazar North) to 60+761(kaulibazar ), Ch.60+761(kaulibazar) to 60+829 (Mollapur), Ch.60+844(Joldup) to 60+892(Joldup), Ch.60+907(Joldup) to 61+910(Womens college), Ch.61+925(Womens college) to 61+949(Womens college South), ; Ch.61+964 (Womens college North ) to 63+289(Nidonpur South), Ch.63+304(Nidanpur) to 63+376(Nidanpur), Ch.63+391(Nidonpur masque) to 63+435 (Nidonpur), Ch.63+450(Nidanpur) to 63+546(Nidanpur North), Ch.63+561(Nidanpur North) to 63+685(Moragonj), Ch.63+700(Moragonj) to 63+796(Moraganj mosque ), Ch.64+080(Supatola) to 64+181(Supatola), Ch.65+490 (Beanibazar South) to 65+538 (Beanibazar), Ch.66+400(khasha) to 66+450(khasha)), Ch.67+171(Digirpar) to 67+508(Digirpar), Ch.67+523(Digirpar) to 67+595(Digirpar North), Ch.67+610(Boiragi South) to 68+306(Abdullahpur South), Ch.68+779(Boiragibazar) to 69+239(Boiragibazar North), Ch.70+165(Kushiara Brick North) to 70+750(Teradol), Ch.70+929(Teradol High School) to 71+370 (kakordi), Ch.71+950 (Addur Rouf Gate) to Ch.72+240 (North Miazvag) ; Ch.72+259 (Maizvag Mosque) to Ch.72+976 (Kakordi North); Ch.73+006(bridge) to Ch.73+070 (Bridge North),Ch.73+330(Dakshinvag) to 73+707 (Dakshinvag north ), Ch.73+730 (Dakshinvag) to 74+600 (Filling Station);Ch.79+000 (Coria) to 80+000(Sheola point), on Rajnagar kulaura juri borolekha Baroigram biyanibazar-sheola-charkhai(R-281) Road under Road Division, Sylhet of Road Zone Sylhet During the year 2022-2023.
734975 : e-GP/19/PMP-Road Major/ACE/SZ/SYL/2022-2023 Emergency Rehabilitation of Flood Damaged Pavement at Ch.1+300( dorbosto UP) to 1+500(dorbosto UP); Ch.2+100(khoragram north) to 2+400(khoragram South), Ch.2+500(khoragram East) to 2+700(khoragram West), Ch.3+200(Saron line) to 3+450(saronline Bazar), Ch.3+500(sarline gram) to 3+650(sarline gram), Ch.3+700(sarline gram purbo) to 3+900(sarline katabazar), Ch.4+700(cashta) to 4+900(Eidgabazar), ; Ch.4+985carthai School) to 5+200(Chakra), Ch.5+300(Chakra) to 5+500(Chakra Bazar), Ch.6+700(cotul) to 6+900(cotul Bazar), Ch.7+200(Durgapur) to 7+425(Durgapur), Ch.7+800(Nurpur east) to 7+900(Nurpur west), Ch.8+200(cotul eidgha) to 8+400(cotul eidgha north), Ch.8+700(cotul eidgha East) to 8+850(cotul eidgha west), Ch.9+873(cotul eidgha Bazar) to 10+273 (cotul eidgha Bazar East), Ch.11+200(Boro cotul eidgha Bazar East) to 11+400(Boro cotul eidgha Bazar West), Ch.11+500(Boro cotul school) to 11+600(Boro cotul Mosque), Ch.11+700(Boro cotul gram) to 11+850(Shatgram), Ch.12+100(Maligram) to 12+600(Maligram setu), Ch.13+500(Maligram point) to13+680(krishnapur), Ch.13+700(Krishnapur) to 13+850(Krishnapur east), Ch.13+900(Krishnapur North) to 14+300 (Ikrai), Ch.14+600 (Bishnupur) to Ch.14+800 (Bishnopur bridge) ; Ch.15+000 (korchuti) to Ch.18+950 (Allama moshaid bridge); Ch.20+037 (bridge) to Ch.20+620 (Biumpur North),Ch.21+440(biyampur) to 21+470 (biyampur south ), Ch.21+520(Community clinic) to 21+570 (biyampur south );Ch.21+710(Rampur) to 21+900(Rampur), Ch.22+330(Rampur Mosque) to 22+390(Rampur Mosque); Ch.22+450(Rampur korborsthan) to 22+480 (Rampur koborsthan); Ch.22+650(Nurnagor) to 22+695(Nurnagor), Ch.23+133(Ghater Bazar) to 23+700(Ghater Bazar), Ch.24+200(muhitpur) to 24+260(muhitpur), Ch.24+590(Shahabug) to 24+700(Shahabug) Point)Km on Dorbost-Kanaighat-Shahbag Road under Road Division, Sylhet of Road Zone Sylhet During the year 2022-2023.
734974 : e-GP/18/PMP-Road Major/ACE/SZ/MOU/2022-2023 Periodic Maintenance Providing DBSWC including Strengthening work at Ch.1+410 Km(Rhd Inspection Banglu) to Ch.1+530 Km & Ch.1+720 Km( Juri old Thana ) to 4+500 Km(Lathitila) of Juri- Lathitila Road (R-282), DBSWC work at Ch.0+000 Km(Borolekha) to Ch.17+000Km( Latu) of Barlekha-Shahbazapur Latu Road (Z-2815) & DBSWC work at Ch.0+000 Km(Shahbazpur) to Ch.8+000Km(Daulatpur) Sign-Signal, KM post, RCC Palisiding etc of Shahbazpur-Daulatpur Road (Z-2816) under Road Division, Moulvibazar of Road Zone Sylhet During the year 2022-2023
Share on Twitter