Login |Register

LTM tenders of Kushtia district. | OSTETM tenders of Kushtia zilla. | OTM tenders of Kushtia. | View All the active tenders of Kushtia district.

eGP Tender ID: 729720; Works (NCT)
APP ID: 187097; District: Kushtia
Package Title: Installation of 07 nos. of Shallow Tara Tube Well (Non-Extractable) (61 m) with # 6 Hand Pump at Bheramara Upazilla, 63 nos. of Shallow Tara Tube Well (Non-Extractable) (76 m) with # 6 Hand Pump at Daulatpur, Khoksha, Kumerkhali and Mirpur Upazilla and 10 nos. of Deep Tara Tube Well (Non-Extractable) (110 m) with # 6 Hand Pump at Sadar Upazilla Kushtia under Asroyon Project (4th phase) of Department of Public Health Engineering during 2021-2022 Fiscal Year.
Organization: Department of Public Health Engineering (DPHE)
Procuring Entity: Office of the Executive Engineer,DPHE,Kushtia
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-08-31 15:30:00
Document last selling: 2022-09-15 16:00:00
Closing / Opening: 2022-09-18 12:00:00
Brief Description of Package: MBTW-1704

Installation of 07 nos. of Shallow Tara Tube Well (Non-Extractable) (61 m) with # 6 Hand Pump at Bheramara Upazilla, 63 nos. of Shallow Tara Tube Well (Non-Extractable) (76 m) with # 6 Hand Pump at Daulatpur, Khoksha, Kumerkhali and Mirpur Upazilla and 10 nos. of Deep Tara Tube Well (Non-Extractable) (110 m) with # 6 Hand Pump at Sadar Upazilla Kushtia under Asroyon Project (4th phase) of Department of Public Health Engineering during 2022-2023 Fiscal Year.
Tender Document Price: Tk. 1000; Tender Security: 100000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 3333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 10000000 BDT.
Thus, Official Cost Estimate should be BDT. 3333333 ~ 5000000.

Eligibility criteria:
As per TDS and PCC
Moreover, The recent amendment of PPA,2006 which is made vide Act no.37 of 2016 and published vide Bangladesh Gazettee registered no. D A-1 on 01.08.2016 ( 17 Srabon 1423) , of which according to the cluase no. 07 & sub-cluase no.03 "For Open Tender Method (OTM) for procurement of works Tenderer will be considered as non-responsive if the quated rate is 10% more or less than the official cost estimates". On the other hand according to sub-cluase no.04 of cluase no.07, "If the quated rate of all Tenderers are found equal, then reponsive Tendrer will be selected as per rule, but not through Lottery".
The Tenderer must submit upto date valid IT and VAT certificate of 2021-2022 fiscal year and trade license of 2022-2023 fiscal year.
Tenderer must fill up all the forms carefully (e.g. e-PW1-3(A) and e-PW2-3(B)). Tenderer must declaire his running works in detail. Otherwise According to Public Procurement Rules, 2008 Rule no. 127 this will be considered as fraudulent practice.
Location of work / delivery: Kushtia Division
Budget Type: Revenue
Category: Drinking water; Natural water;
PE Address: Office of the Executive Engineer,DPHE,Kushtia, City: Kushtia, Thana: Kushtia, District: Kushtia - 7000, Country: Bangladesh,
Share on Twitter