eGP Tender ID: 705910; Works (NCT)
APP ID: 180210; District: Satkhira
Package Title: Re-excavation of Perkatakati khal from km. 0.000 to km. 4.400= 4.40 km, Putimari khal from km. 0.000 to km. 4.025= 4.025 km, Sahapur khal from km. 0.000 to km. 3.400= 3.400 km Total length = 11.825 Km. in Polder No. 6-8 in Assasuni, Satkhira Sadar & Tala Upazilla in c/w "Drainage Improvement of Polder 1, 2, 6-8, 6-8 (extn) in Satkhira District" under Satkhira O&M Division-2, BWDB, Satkhira.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Satkhira O&M Division-2
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-06-05 17:00:00
Document last selling: 2022-07-04 16:00:00
Closing / Opening: 2022-07-05 12:15:00
Brief Description of Package: Re-excavation of Perkatakati khal from km. 0.000 to km. 4.400= 4.40 km, Putimari khal from km. 0.000 to km. 4.025= 4.025 km, Sahapur khal from km. 0.000 to km. 3.400= 3.400 km Total length = 11.825 Km. in Polder No. 6-8 in Assasuni, Satkhira Sadar & Tala Upazilla in c/w "Drainage Improvement of Polder 1, 2, 6-8, 6-8 (extn) in Satkhira District" under Satkhira O&M Division-2, BWDB, Satkhira.
Tender Document Price: Tk. 4000; Tender Security: 700000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 23333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 70000000 BDT.
Thus, Official Cost Estimate should be BDT. 23333333 ~ 70000000.

Eligibility criteria:
1 . Payment of work will be made on the availability of budget & fund release. For this, no Claim/interest of Delaying of Payment will be entertained.
2. If any type of Structures/Obstacles is needed to dismantle to execute the work as per Design & Specification, the selected Contractor will do this at his own cost & arrangement. No Extra claim will be entertained in this regard.
3. Representative still picture & video of prework & postwork of the same location will be taken by contractor and submit to Procuring entity at contractor's own cost.
4. Quantity of work may extremely increase or decrease.
5. Design may also be changed or modified (if required).
6. Prework & Postwork may be also taken by taskforce or other agency or jointly as per instruction of Higher Authority or PE
7. Cost of Interim and post-work survey will be borne by the contractor. No extra claim will be entertained.
8. After completion of the Whole work final Measurement will be Taken. The final bill will be paid based on the final measurement
9. Contract will be terminated if contractor's personnel is involved in any kind of unauthorized/illegal financial transaction from the locals during eviction work.
Project: Drainage Improvement of Polder 1, 2, 6-8 & 6-8 (Extention) in Satkhira District.
Location of work / delivery: Assasuni, Satkhira Sadar, Tala Upazilla, Satkhira
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Itagachha, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 9400, Country: Bangladesh,


See more tenders from Satkhira O&M Division-2; Bangladesh Water Development Board (BWDB):
976772 : W-Sat-2/53 Re-Excavation of Morichap River from km. 29.365 to km. 30.500 = 1135 meter in Polder No-2 at Assasuni Upazilla in c/w "Drainage Improvement of Polder No. 1, 2, 6-8 & 6-8 (Ext.) in Satkhira District" Under Satkhira O&M Division-2, BWDB, Satkhira during the FY 2023-2024.
932338 : NDR Sat-2/P-15/2023-24 Re-sectioningof embankment at Purbo Patakhali, Shyamnagar Upazilla in Satkhira district from ch. km. 22.500 to km. 22.750 = 0.250 km. of Polder no-7/1 under Satkhira O&M Division-2 during the FY 2023-24.
929261 : Sat-2/17 River bank protection work from km. 16.150 to km 16.650=500.00 meter in polder no: 14/1 under Rehabilitation of Polder No 14/1 in Khulna District under Satkhira O&M Division-2, BWDB, Satkhira.
922328 : NDR Sat-2/P-24/2023-24 Repair & Maintenance work of Office room, Rest House/Bunglow & Colony quarters of Satkhira O&M Division-2 during the FY 2023-2024.
922327 : NDR Sat-2/P-23/2023-24 Supply of synthetic bags at polder no-2 for early flood fighting preparation under Satkhira O&M Division-2 during the FY 2023-2024.
922326 : NDR Sat-2/P-22/2023-24 Supply of 175 kg Polyster Geobags and Geo Roll for early flood fighting preparation under Satkhira O&M Division-2 during the FY 2023-2024.
Share on Twitter