Login |Register

LTM tenders of Satkhira district. | OSTETM tenders of Satkhira zilla. | OTM tenders of Satkhira. | View All the active tenders of Satkhira district.

eGP Tender ID: 687376; Works (NCT)
APP ID: 180210; District: Satkhira
Package Title: Re-excavation /Dredging of Betna River from km. 23.500 to km. 28.000 = 4500 m in c/w "Drainage Improvement of Polder No. 1, 2, 6-8, 6-8 (Ext.) in Satkhira District" under Satkhira O&M Division-2, BWDB, Satkhira.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Satkhira O&M Division-2
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-04-27 12:00:00
Document last selling: 2022-05-25 16:00:00
Closing / Opening: 2022-05-26 12:00:00
Brief Description of Package: Re-excavation /Dredging of Betna River from km. 23.500 to km. 28.000 = 4500 m in c/w "Drainage Improvement of Polder No. 1, 2, 6-8, 6-8 (Ext.) in Satkhira District" under Satkhira O&M Division-2, BWDB, Satkhira.
Tender Document Price: Tk. 4000; Tender Security: 5500000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 183333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 550000000 BDT.
Thus, Official Cost Estimate should be BDT. 183333333 ~ 550000000.

Eligibility criteria:
1. Payment may require two or more years. No claim of interest for delaying of payment will be entertained.
2. Spoil earth management will followed as per instruction of Engineer in Charge
3. Quantity of tender item may increase or decrease
4. Pre work or Post work will be taken by taskforce and BWDB's concern engineer in charge. Final payment will be made on the
measurement taken by taskforce.
5. The selected contractor will hand over total site at a time. No scope to handover site partly.
6. Silt will be removed by contractor until the final measurement is taken. Otherwise final post work will be taken above the silt.
7.The contractor will bear the expense to remove of illegal occupancy/structures if remain besides the river
8 Cost of interim and post work survey and more video beyond schedule (if applicable) will be borne by contractor.
9. The design may be changed/ altered.
10. All the liability of contractor personnel will be borne by contractor.
11 . Earthen Dyke Will be constructed by excavated earth along the River/Canal sides considering the existing surrounding & land
propietorship.as per direction of engineer in Charge. No financial claim for construction of earthen Dyke will be allowed.
Project: Drainage Improvement of Polder 1, 2, 6-8 & 6-8 (Extention) in Satkhira District.
Location of work / delivery: Satkhira Sadar Upazila, Satkhira
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Itagachha, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 9400, Country: Bangladesh,
See live tender notices for dredging.
Share on Twitter