eGP Tender ID: 1343379; Works (NCT)
APP ID: 229692; District: Satkhira
Package Title: Construction of Gainbari RCC Slab Bridge (2 X 9.00m) 18.75m long at Ch: 8+504.50m and Soling - HBB, Earth work in embankment & Protective Work from Ch. 8+400m (Bethkashi Khaya Ghat) to Ch. 18+400m (Sonakhali) (Length = 10000.00m) of Koyra-Noabaki-Shyamnagar Road (Z-7610) under Satkhira Road Division during the Financial Year 2026-2027.
Organization: Roads & Highways Department (RHD)
Procuring Entity: Satkhira Road Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-09-30 15:00:00
Document last selling: 2026-10-28 17:00:00
Closing / Opening: 2026-10-29 12:00:00
Brief Description of Package: e-GP/02/OTM/PMP-Major/Bridge/Sat/RHD/2026-2027
Construction of Gainbari RCC Slab Bridge (2 X 9.00m) 18.75m long at Ch: 8+504.50m and Soling, HBB, Earthwork in Embankment & Protective Work from Ch. 8+400m (Bethkashi Khaya Ghat) to Ch. 18+400m (Sonakhali) (Length = 10000.00m) of Koyra-Noabaki-Shyamnagar Road (Z-7610) under Satkhira Road Division during the Financial Year 2026-2027.
Tender Document Price: Tk. 5000; Tender Security: 5170000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 172333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 517000000 BDT.
Thus, Official Cost Estimate should be BDT. 172333333 ~ 517000000.

Eligibility criteria:
1) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years.
 
2) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in Road construction Work including Bridge work under the public sector successfully completed within the last 20 (twenty) years with a value of at least Tk. 12 (Twelve) Crore in Maxium 02 (Two) contracts. 
N:B: The Construction of  RCC/PC Girder bridge experience may be in a separate contract.  
 
3) The required average annual construction turnover shall be greater than Tk 24.00 (Twenty Four) crore over the best Five [5] financial years in the last Ten [10] financial years.
 
4) The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 06.00 (Six) crore.
 
5) The minimum capacity shall be: TK. 16,30,00,000 (Sixteen Crore Thirty Lakh).
 
And other Criteria As Per Tender Document in accordance with PPR 2025.
Location of work / delivery: Koyra Noabaki Shyamnagar Road Z 7610
Budget Type: Revenue
Category: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Works for complete or part construction and civil engineering work;
PE Address: Satkhira Road Division, Sarak Bhaban, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 0000, Country: Bangladesh,


See more tenders from Satkhira Road Division; Roads & Highways Department (RHD):
1316391 : e-GP/01/OTM/PMP-Major/Sat/RHD/2026-2027 Recycling of Ashphalt Pavement and DBS Wearing Course Work from Ch:34+900m to 36+378m [Recycling Part 998.0m], Ch:37+178m to 39+500m, Ch:41+878m to 42+678m, Ch:44+828m to 45+378m and Ch:49+278m to 51+378m (total=6770m); Strengthening with Base Type-I, DBS Base Course & DBS Wearing Course Work from Ch:34+900m to 36+378m [Partial Strengthening Part 480.0m], Ch: 47+248m to 47+748m and Ch: 52+478m to Ch: 52+978m (total=1480m) and Partial Strengthening with Base Type-I, DBS Base Course (Partial Strengthening portion) & DBS Wearing Course work from Ch: 51+378 to 52+478m (total=1100m) of Khulna-Chuknagar-Satkhira (N-760) National Highway under PMP (Major-Road) of Road Division, Satkhira during the year 2026-2027.
1281821 : e-GP/26/OTM/Culvert/Sat/RHD/2025-2026 Construction of 1 No Single Vent 2.00m (Clear) Length, 2.00m (Clear) Height & 10.25m Width RCC Box-Culvert with U-Type Wing Wall at Ch: 12+680m of Keshabpur - Sharankhati - Kalaroa (Z-7552) Highway Road under Satkhira Road Division [FY:2025-2026]
1273438 : e-GP/02/RFQ/EE/Sat/RHD/2025-2026 Supplying of stationary items for improvement of Satkhira- Shakipur- Kaliganj (Z-7602) and Kaliganj-Shyamnagar- Vetkhali (Z-7617) Highway to appropriate level of standard project related works under Satkhira Road Division during the year 2025-2026.
1267513 : e-GP/04/RFQ/EE/Sat/RHD/2025-2026 Sub-soil investigation at 13th km (ch: 12+093m, Kulia bridge) of Satkhira- Shakipur- Kaliganj (Z-7602) road under Road Division, Satkhira during the year 2025-2026.
1267512 : e-GP/03/RFQ/EE/Sat/RHD/2025-2026 Sub-soil investigation at 5th km (ch: 4+051m, Bakal bridge) & 18th km (ch: 17+617m, Parulia Bridge) of Satkhira- Shakipur- Kaliganj (Z-7602) road under Road Division, Satkhira during the year 2025-2026.
See live tender notices for bridge,embankment,
Share on Twitter