eGP Tender ID: 1339921; Works (NCT)
APP ID: 230646; District: Bogura
Package Title: Re-Excavation of Karatoa River from km 45.000 to km 48.000= 3.000 Km in connection with "Karotoa River System Improvement Project" at Upazilla Shibganj, District Bogura.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Bogura WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-09-24 23:00:00
Document last selling: 2026-10-18 16:00:00
Closing / Opening: 2026-10-19 14:00:00
Brief Description of Package: RKR-BOG/W-12
Re-Excavation of Karatoa River from km 45.000 to km 48.000= 3.000 Km in connection with "Karotoa River System Improvement Project" at Upazilla Shibganj, District Bogura.
Tender Document Price: Tk. 4000; Tender Security: 1500000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 50000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 150000000 BDT.
Thus, Official Cost Estimate should be BDT. 50000000 ~ 150000000.

Eligibility criteria:
1. Eligible e-GP Tenderers fulfilling the requirements of STD, TDS and PPR-2025, with valid Trade License, TIN and required documents, may participate.
2. Only Work/Payment Certificates issued or authenticated by the concerned Procuring Entity (PE) shall be considered for turnover calculation.
3. Payment, including R/A Bills, shall be subject to availability of budget allocation and release of funds. No additional claim or interest for payment delay shall be entertained as per Contract provisions.
4. The Contractor shall maintain required work progress as per the approved work programme and Contract.
5. The latest applicable BWDB Technical Specifications, Particular Specifications and relevant guidelines shall govern the Works.
6. Design/drawings may be revised, if required, and BOQ quantities may increase or decrease as per Contract provisions.
7. Pre-work and post-work measurements shall be taken by the BWDB Taskforce and authorized Engineer-in-Charge. Final payment shall be based on accepted final measurements.
8. The Contractor shall take over the work site as made available by the Procuring Entity in accordance with the Contract.
9. Applicable non-life insurance for public property and related risks/liabilities shall be arranged through Sadharan Bima Corporation, as required by applicable law.
10 All applicable provisions of PPR-2025, STD, TDS, Specifications and BWDB Taskforce Guidelines, including amendments, shall be complied with.
***The Tenderer is advised to visit and inspect the work site prior to submission of the Tender and verify all relevant site conditions, constraints and other necessary information. The Tenderer shall be deemed to have considered such conditions in preparing and submitting the Tender.
Project: Karatoa River System Improvement Project
Location of work / delivery: Shibganj, Bogura
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Bogura, City: Bogura, Thana: Bogura Sadar, District: Bogura - 5800, Country: Bangladesh,


See more tenders from Bogura WD Division; Bangladesh Water Development Board (BWDB):
1339926 : RKR-BOG/W-26 Re-Excavation of Karatoa River from km 110.500 to km 114.000 = 3.500 Km in connection with "Karatoa River System Improvement Project" at Upazilla Sherpur, District Bogura.
1339925 : RKR-BOG/W-25 Re-Excavation of Karatoa River from km 107.000 to km 110.500 = 3.500 Km in connection with "Karatoa River System Improvement Project" at Upazilla Sherpur, District Bogura.
1339924 : RKR-BOG/W-24 Re-Excavation of Karatoa River from km 104.500 to km 107.000 = 2.500 Km in connection with "Karatoa River System Improvement Project" at Upazilla Sherpur, District Bogura.
1339922 : RKR-BOG/W-13 Re-Excavation of Karatoa River from km 48.000 to km 53.000= 5.000 Km in connection with "Karotoa River System Improvement Project" at Upazilla Shibganj, District Bogura.
1323947 : RKR-BOG/W-27 Re-Excavation of Karatoa River km 114.00 to km 119.000 =5.00 Km in connection with Karatoa River System Improvement Project" at Upazilla Sherpur, District Bogura.