Login |Register

LTM tenders of Gazipur district. | OSTETM tenders of Gazipur zilla. | OTM tenders of Gazipur. | View All the active tenders of Gazipur district.

eGP Tender ID: 1336505; Works (NCT)
APP ID: 220052; District: Gazipur
Package Title: Remaining Work of 1. R-5201 Improvement of Mudafa master bari road by R.C.C.& D-5202 Construction of RCC drain beside Mudafa master bari road from Mudafa madrasa to Nojor Ali house.2. R-5206 Improvement of the Vadam Dewan Ali bari road by R.C.C.3. D-5207 Construction of RCC drain beside Vadam Dewan Ali bari road.4. R-5208 Improvement of the Bakral main road by R.C.C.
Organization: Gazipur City Corporation
Procuring Entity: Construction of Internal road, drain & footpath in zone 1 to 5 of Gazipur city corporation (3rd Revision)
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-09-23 16:00:00
Document last selling: 2026-10-04 12:00:00
Closing / Opening: 2026-10-04 15:00:00
Brief Description of Package: Zone-1/PW-10R
Remaining Work of 1. R-5201 Improvement of Mudafa master bari road by R.C.C.& D-5202 Construction of RCC drain beside Mudafa master bari road from Mudafa madrasa to Nojor Ali house.2. R-5206 Improvement of the Vadam Dewan Ali bari road by R.C.C.3. D-5207 Construction of RCC drain beside Vadam Dewan Ali bari road.4. R-5208 Improvement of the Bakral main road by R.C.C.
Tender Document Price: Tk. 4000; Tender Security: 1900000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 63333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 190000000 BDT.
Thus, Official Cost Estimate should be BDT. 63333333 ~ 190000000.

Eligibility criteria:
As per Tender Data Sheet & ITT.
Project: Construction of Internal Road , Drain & Footpath From Zone 01 to 05 of Gazipur City Corporation.
Location of work / delivery: Gazipur City Corporation
Budget Type: Development
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Nagar Bhaban, Gazipur city corporation , Gazipur, City: Gazipur city, Thana: Gazipur Sadar, District: Gazipur - 1700, Country: Bangladesh,


See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Construction of Internal road, drain & footpath in zone 1 to 5 of Gazipur city corporation (3rd Revision); Gazipur City Corporation
:
1278380 : Zone-03/PW-10 R 1. Construction Of (Rcc Drain+Bc Road) Start From Dhirasroom railline to west direction mollahpara bridge 2. Rehabitation of Rcc Boundary wall at west& south direction of cental Graveyard 3. Rehabitation of road by bc Start from Zoorpuur-mohila collage road To north side of kazi azimuddin collage 4. Construction of Rcc Drain Start from Zoorpuur-mohila collage road To north side of kazi azimuddin collage 5. Construction Of Rcc Drain Start From Moslimabad Road To East Direction Harinal Shanghata Connecting Roard. (pilkhana road) via sariotllah house 6. Construction Of Rcc +bc)Road Start From Moslimabad Road To East Direction Harinal Shanghata Connecting Road. (pilikhana road) via sariotllah house 7. Improvement Of Road By Bc Start from east vhurulia shashan pajula road to east direction engineer ibrahim khalil shaheb house road 8. Rehabitation work of roc bridge ovey joydebpur chili khal at kalashikder ghat 9. Rehabitation of road By Rcc start from chokkor-zourpukur road toward east direction burudha dhal via h/o mr.shopon.(abul hossain) 10. Construction of Rcc Drain start from chokkor-zourpukur road toward east direction burudha dhal via h/o mr.shopon. (abul hossain) 11. Rehabitation of road by bc start from a).chapolia rail line to east direction shashan road b). Widening of road by bic start from shashan-pajolila road(nazrul shop) to pajolia eidgao field 12. Construction Of Rcc Drain start from Duet 2nd campach abasik Gate to South direction Tin Rasta mour connecting road. 13. Construction Of (Rcc Drain+bc road) Moddho Chyabithy Of Nuru Sir (Vhawal nur) 14. Construction Of Rcc Road At Laxmipura start from h/o qazi sornakar to south direction h/o jomsher ali and west direction nurul alom.
1182743 : Zone-05/PW-14 (1) Improvement of the Road from Bugbari Mr.Ismail house to Soildubi Member market by BC. (2) Improvement of the Road from Andarmanik bottola to Jarniatul Oliza Islamia Madrasha by BC.
1182742 : Zone-05/PW-13 Part-01:Construction of RCC Road From Ambag mitali clube mor to tazul islam of west direction & North direction of Mr. mamun plots. Part-02:Construction of RCC Road From Deulia bari dighir par to south direction Baganbari four way intersection road. Part-03:Construction of BC Road From Konabari ambag road MM gurments to west direction Dhaka-Tangail high way ispahani gate. Part-04::Construction of RCC drain From Konabari ambag road MM gurments to west direction Dhaka -Tangail high way ispahani gate.
1182741 : Zone-04/PW-19 Part-01: Construction of RCC Drain from Dhaka-Malmanshing road infront of Vawal Collage to South direction of Vogra Bazar road Star light factory via Jalnoddin House. Part-02: Construction Bc Road From Pler para bridge to Mirbohor bridge via kathura. Part-03: Construction of BC Road From Brack gate to likshu Gabeshawana Teen sarak via monindro gossami house. Part-04: Construction of RCC drain From Chondona chawrasta to Unishe tower.
1180780 : Zone-04/PW-18 Part-01: Construction of RCC drain from mastarbari mirzapur road to bahdurpur baitul hossain jame mosque. Part-02: Constraction of RCC drain dhons mollah supper market to jangalia eidgha field mosque at Bangla Bazar. Part-03: Constraction of BC road from west side of jholar par bazar to narayan fakir road via bilal house.
Share on Twitter