Login |Register

LTM tenders of Dhaka district. | OSTETM tenders of Dhaka zilla. | OTM tenders of Dhaka. | View All the active tenders of Dhaka district.

eGP Tender ID: 1311090; Works (NCT)
APP ID: 228359; District: Dhaka
Package Title: TP-KEX- 01
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Sub-Project Management Office (Specialized Division), CRISP-WRM, BWDB
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-07-23 15:37:00
Document last selling: 2026-08-19 11:50:00
Closing / Opening: 2026-08-19 12:37:00
Brief Description of Package: TP-KEX- 01 Re-excavation of 7 (Seven) Nos khal (1).Gunapara khal 1.750km,(2).Kadar khal from km.2.555 km, (3) Pachuria khal 4.615 km, (4) DChar Pathalia khal 2.525 km (5) Sunakur khal .930km , (6),Gabvita khal 4.053 km, (7) Gobra /Sutar khal 5.272 km, Total 22.700 Km in c/w Tarail-Pachuria Sub-Project under CRISP-WRM (IDWRM-KT) under Specialized Division, BWDB, Gopalganj during the year 2026-27.
Tender Document Price: Tk. 5000; Tender Security: 2500000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 83333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 250000000 BDT.
Thus, Official Cost Estimate should be BDT. 83333333 ~ 250000000.

Eligibility criteria:
1) Tenderer registered with e-GP, 
2)  All other qualifications, terms, and conditions of the tenderer are shown in the tender data sheet (TDS) of the tender documents.
 3) The tenderer shall quote the rate by considering an additional VAT.
4) The tenderer shall follow the instructions attached in section 11.  
Project: Implementation of Integrated Water Resources Management for Improvement of Drainage Congestion in Tungipara & Kotalipara upazila under Gopalgonj district
Location of work / delivery: Gopalganj
Budget Type: Development
Development Partner: Asian Development Bank (ADB)
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: WAPDA Building (6th Floor), Motijheel C/A, City: Dhaka, Thana: Dhaka South City Corporation, District: Dhaka - 1000, Country: Bangladesh,


See more tenders from Sub-Project Management Office (Specialized Division), CRISP-WRM, BWDB; Bangladesh Water Development Board (BWDB):
1312919 : TP- KEX -10 Re-excavation of 25 nos Khals - Hiron branch khal 0.678 km, Hiron middle para khal 0.714 km, Dafadar bari haloter khal 1.000 km, Boroi hati khal 0.600 km, Rakhila bari khal 1.768 km, Gazir khal 2.325 km, Silna-shir khal 1.570 km, Gabir beel khal 2.170 km, Khanar par khal 2.355 km, Ebadat khar bari - Bachu sheikh bari khal 0.700 km, Dola beel khal 2.260 km, Mohisar khal 1.680 km, Rupa hati branch khal 2.500 km Dhulorujir khal 0.950 km, Doapura khal-1: 1.404 km, Kochu khal 2.310 km, Aria khal 0.605 km, Barsha para khal 2.020 km, Nawdanga khal 1.002 km, Bhangar khal 2.682 km, Bhangar branch khal 1.842 km, Chaprail khal 0.760 km, Kata khal 0.760 km, Basa bari khal 1.660 km, Guadna west para khal 0.942 km, Total 37.257 km in polder-2 in c/w Tarail-Pachuria Sub-Project under CRISP-WRM under Specialized Division, BWDB, Gopalganj during the year 2026-2027.
1311066 : TP-KEX - 10 TP-KEX- 10 Re-excavation of 25 nos khals - Hiron branch khal 0.678 km, Hiron middle para khal 0.714 km, Dafadar bari haloter khal 1.000 km, Boroi hati khal 0.600 km, Rakhila bari khal 1.768 km, Gazir khal 2.325 km, Silna-shir khal 1.570 km, Gabir beel khal 2.170 km, Khanar par khal 2.355 km, Ebadat khar bari - Bachu sheikh bari khal 0.700 km, Dola beel khal 2.260 km, Mohisar khal 1.680 km, Rupa hati branch khal 2.500 km Dhulorujir khal 0.950 km, Doapura khal-1: 1.404 km, Kochu khal 2.310 km, Aria khal 0.605 km, Barsha para khal 2.020 km, Nawdanga khal 1.002 km, Bhangar khal 2.682 km, Bhangar branch khal 1.842 km, Chaprail khal 0.760 km, Kata khal 0.760 km, Basa bari khal 1.660 km, Guadna west para khal 0.942 km Total 37.257km in polder-2 in c/w Tarail-Pachuria Sub-Project under CRISP-WRM under Specialized Division, BWDB, Gopalganj during the year 2026-2027.
1162178 : SMO/Survey-01 Survey/study, Investigation and data collection work (Including Pre work & post survey of Earth work with Bathymetric & topografic Survey) for Rexcavation & River Dredging of 78 nos khals 1no Baor & 1no River in connection with Tarail-Pachuria, Satla-Bagda, Ramshil-Kafulabari & Rajoir-Kotalipara Sub-Project under IDWRM-KT, CRISP-WRM Project under Specialized Division, BWDB, Gopalganj during the year 2024-25.
Share on Twitter