eGP Tender ID: 1281263; Works (NCT)
APP ID: 223882; District: Feni
Package Title: 3.582 km River Bank Protection work on the Bank of Little Feni River and Matubhuiyan Khal of Daganbhuiyan, Sonagazi Upazila in Feni District under the project of "Bangladesh Sustainable Recovery, Emergency Preparedness & Response Project (B-STRONG) (BWDB Part)" under Feni WD Division, BWDB, Feni.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Feni WD Division, BWDB
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-05-24 15:30:00
Document last selling: 2026-06-21 16:00:00
Closing / Opening: 2026-06-22 15:00:00
Brief Description of Package: 3.582 km River Bank Protection work on the Bank of Little Feni River and Matubhuiyan Khal of Daganbhuiyan, Sonagazi Upazila in Feni District under the project of "Bangladesh Sustainable Recovery, Emergency Preparedness & Response Project (B-STRONG) (BWDB Part)" under Feni WD Division, BWDB, Feni.
Tender Document Price: Tk. 6000; Tender Security: 9350000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 311666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 935000000 BDT.
Thus, Official Cost Estimate should be BDT. 311666666 ~ 935000000.

Eligibility criteria:
1) Tenderers must provide a methodology for sand sourcing and transportation for geo-bag filling, as required under TDS Clause 30.1.
2) In case of an Abnormally Low Bid (ALB), the Tender Evaluation Committee (TEC) can seek Unit Rate Breakdown (Rate Analysis) under the provision of ITT Clause 48.1.
3) Valid Trade Licence, TIN number, VAT Registration, Nationality, & Business address, Declaration about legal capacity to enter in to the contract.
4) Work plan, Statement of work method, Equipment & Personnel.
Special Instruction: (Please Read)
1) The work of the package may be totally dropped, decreased or increased as per field condition/design for which no claim will be entertained for cancellation of the tender/insurance of work order.
2) Work order will be issued after obtaining budget allocation & prior approval from the competent authority of BWDB.
3) Payment will be made subject to the availability of fund. No claim in this regard will be entertained.
4) Continuation of work could not be hampered for the reason of insufficient Budget Provision & Fund Allocation. The work must be completed within the stipulated time failure of which action will be taken as per Tender Clause & PPR-2025.
5) The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever.
6) Latest circular of CPTU and BWDB shall be implied.
7) After completion of the tender opening process, only downloaded documents of the tenderer from egp portal shall be treated as submitted documents.
8) The Contractor shall keep records of still pictures and videos of Pre-work. Ongoing work and post work/Completion of work at his own cost.
9) In case of JVCA, sample agreement form attached in section 7 shall be submitted.
Project: Bangladesh Sustainable Recovery, Emergency Preparedness and Response Project (B-STRONG) (BWDB Part)
Location of work / delivery: Sonagazi and Dagonbhuiyan Upazilla of Feni District
Budget Type: Development
Development Partner: World Bank
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Mohipal, Feni, City: Feni, Thana: Feni Sadar, District: Feni - 3900, Country: Bangladesh,


See more tenders from Feni WD Division, BWDB; Bangladesh Water Development Board (BWDB):
1357410 : MK/W-14 Rehabilitation of embankment on the Right bank of the Muhuri River (Length=2550m) including re-excavation/dredging of the river (Length=3900m) and bank protection works with toe protection of embankment (Length=1006m) in adjacent areas from river chainage 27.700 km to 31.600 km= 3.900 km in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
1357409 : MK/W-15 Rehabilitation of embankment on the Right bank of the Muhuri River (Length=2125m) including re-excavation/dredging of the river (Length=2400m) and bank protection works with toe protection of embankment (Length=300m) in adjacent areas from river chainage 31.600 km to 34.000 km=2.400 km in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
1357348 : MK/W-16 Rehabilitation of embankment on the Right bank of the Muhuri River (Length=2830m) including re-excavation/dredging of the river (Length=2800m) and bank protection works with toe protection of embankment (Length=950m) in adjacent areas from river chainage 34.000 km to 36.800km=2.800 km in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
1357347 : MK/W-12 Rehabilitation of embankment on both banks of the Muhuri River (Length=2220m) including re-excavation/dredging of the river (Length=2210m), bank protection works with toe protection of embankment (Length=1100m), and construction of inlets (3 Nos) in adjacent areas from river chainage 23.625 km to 25.835 km=2.210 km in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
1355126 : MK/W-03 Rehabilitation of embankment on both banks of the Muhuri River (Length=4070m) including re-excavation/dredging of the river (Length=2080m), bank protection works with toe protection of embankment (Length=915m), and construction of inlets (5 Nos) in adjacent areas from river chainage 6.000 KM to 8.080 KM=2.080 KM in connection with "Rehabilitation of Muhuri-Kahua Flood Control, Drainage and Irrigation Project in Feni District (1st Phase)" under Feni WD Division, BWDB, Feni.
1354039 : Feni/OM/OTM-08/26-27 Repair and Maintenance works of all the demaged Infrastructure of Irrigation Schemes (Such as Header Tank, Burried Pipe Line, Outlet & Airvent etc.) located in Mirasarai Upazila of Chattogram District and Sonagazi Upazila of Feni District in connection with IMIP Project under Feni WD Division, BWDB, Feni during the year 2026-27.