See more tenders from
Ministry of Water Resources,Bangladesh Water Development Board (BWDB),Narayanganj WD Divison, BWDB:
1268953 : NWDD/NDR/W-36/25-26
Supplying, Filling and Dumping of 9500 Nos. 175 kg geo-textile bags for emergency flood fighting under Narayanganj WD Division, BWDB, Narayanganj (Package No: NWDD/NDR/W-36/25-26).
1250785 : NWDD/NDR/W-35/25-26
Removal of silt from bed, garbage, hyacinth, jungles, and other obstacles; repair and maintenance for Main Drainage Canal (UP) at in between km. 5.000 to km 7.700 =2.700 km, in connection with NNIP Block-A/1 under repair & maintenance Budget of Narayanganj Water Development Division, BWDB, Narayanganj during the FY- 2025-26. (Package No: NWDD/NDR/W-35/25-26).
1250784 : NWDD/NDR/W-34/25-26
Eviction of Unauthorized Occupants from Flood Control Embankment in Km 13.520 Total = 13.520 km in connection with NNIP Block-A/1 under Repair & Maintenance Budget of Narayanganj WD Division, BWDB, Narayanganj during FY 2025-26.(Package No: NWDD/NDR/W-34/25-26).
1250783 : NWDD/NDR/W-33/2025-26
Removal of silt from bed, remove garbage, hyacinth and other obstacles and Dyke Repair and maintenance for Tertiary Drainage Canal (TDC-1/2,2/2,3/2,4/2,5/2,6/2,7/2,7/3,8/3,8(A)/1,8(A)/3,9/1,10/1) at total length km. 6.150 in connection with NNIP Block-A/1 under repair & maintenance Budget of Narayanganj Water Development Division, BWDB, Narayanganj during the FY-2025-26. (Package No: NWDD/NDR/W-33/25-26).
1250782 : NWDD/NDR/W-32/2025-26
Removal of silt from bed, remove garbage, hyacinth, Slushy and other obstacles and Repair and maintenance of Khal for Secondary Drainage Canal-6 (SDC-6) in between km. 0.000 to km 2.500 = 1.728 km, in connection with NND (Agrani) Irrigation project under Repair & Maintenance Budget of Narayanganj WD Division, BWDB, Narayanganj during FY 2025-26.(Package No: NWDD/NDR/W-32/25-26).
1250781 : NWDD/NDR/W-31/2025-26
Removal of silt from bed, garbage, hyacinth, jungles, and other obstacles; repair and maintenance for Secondary Drainage Canal-3 (SDC-3) at in between km. 0.000 to km 2.500 =1.209 km, in connection with NND (Agrani) Irrigation project under Repair & Maintenance Budget of Narayanganj WD Division, BWDB, Narayanganj during FY 2025-26.(Package No: NWDD/NDR/W-31/25-26).