Login |Register


eGP Tender ID: 1272993; Works (NCT)

Reference No.: T-1/3619; Date: 10-05-2026
Package Title: BNDR/LTM/W-23/2025-26Ditch filling work at near Kanchan Park on the Kazirhat-Satbaria Bundh on the left bank of the Padma River under Sujanagar Upazila of Pabna district During the financial year 2025-2026.
PE & Organization: Ministry of Water Resources,Bangladesh Water Development Board (BWDB),Bera WD Division
Procurement Method: LTM
IFT Published on: 2026-05-10 22:00:00
Closing / Opening: 2026-05-24 12:10:00

Notice: Undefined index: PEID in /home/dorpatra/public_html/functions.php on line 119


See more tenders from Ministry of Water Resources,Bangladesh Water Development Board (BWDB),Bera WD Division:
1305063 : BNDR/OTM/W-14/2025-26 Supply, Filling and Dumping of Geo Textile Bag (250 Kg & 175 Kg) at Different Vulnerable Points of Sujanagar & Bera Upazila in Pabna District for Emergency Flood Mitigation in C/W NDR Budget under Bera Water Development Division, BWDB, Bera, Pabna.
1200975 : BNDR/OTM/W-13/2025-26 Repair/Strengthening of slope Protection work of Flood Control Embankment from km 100.200 to km 100.250 = 0.050 km at Choira in Upazila Shahjadpur District Sirajganj under Bera WD Division, BWDB, Bera, Pabna during the FY-2025-2026.
1200974 : BNDR/OTM/W-12/2025-26 Silt removing works of Bera Pumping Station Intake Channel from km. 0.200 to km. 0.250 = 50.00 m including NDR budget under Bera WD Division, BWDB, Bera, Pabna during the FY: 2025-2026.
1200973 : BNDR/OTM/W-11/2025-26 Precautionary Work On The Left Bank Of The Padma River 76.00 Meter In between K.M. 4.700 to K.M. 4.930 at Naruhati under Sujanagar Upazila of Pabna District During The FY 2025-2026.
1186296 : BNDR/OTM/W-09/2025-2026 Re-excavation works of khal in length of 1500.00m with construction a inlet for removing deposited water on irrigation land of paina, tehri and Jagannathpur village adjacent to I3S1T1 irrigation canal in connection with PIRDP under Bera WD Division, BWDB, Bera, Pabna during the FY: 2025-2026.
1186295 : BNDR/OTM/W-08/2025-2026 Dyke resectioning work, height increasing work of the dyke, brick work along the toe of dyke and HBB work of top surface of the dyke of I-3 S-1 T-1 irrigation canal from km. 0.690 to km. 1.580 = 890.00m in connection with PIRDP under Bera WD Division, BWDB, Bera, Pabna during the FY: 2025-2026.
Share on Twitter