LTM tenders of Khulna district. |
OSTETM tenders of Khulna zilla. |
OTM tenders of Khulna. |
View All the active tenders of Khulna district.
eGP Tender ID: 1254753; Works (NCT)
APP ID: 221170;
District: Khulna
Package Title: Survey work at Tiabunia Khal 1.700 Km, Shostitola Khal 1.500 km, Bakultola Khal 6.500km, Midil Bhadra River length 9.100 km, Joykhali Bhadra River length 11.000 km Total Lenght = 29.800 Km in C/W Revitalization, Pollution-free and Eviction of Encroachment of Salta River in Khulna District under Khulna Water Development Division-1, BWDB, Khulna.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Khulna WD Division-1
Procurement Method: Request For Quotation Unit Rate (RFQU)
IFT Published on: 2026-04-09 12:00:00
Document last selling: 2026-04-13 15:00:00
Closing / Opening: 2026-04-13 16:10:00
Brief Description of Package: Survey work at Tiabunia Khal 1.700 Km, Shostitola Khal 1.500 km, Bakultola Khal 6.500km, Midil Bhadra River length 9.100 km, Joykhali Bhadra River length 11.000 km Total Lenght = 29.800 Km in C/W Revitalization, Pollution-free and Eviction of Encroachment of Salta River in Khulna District under Khulna Water Development Division-1, BWDB, Khulna.
Eligibility criteria:
1) All the tenderers/firms must be registered with BPPA through e-GP portal.
2) Payment will be made after the availability of funds.
3) The tenderer must submit his/her documents following the latest instructions and formats of BPPA.
4) Quotationer shall have legal capacity to enter into Contract. Quotationer, in support of its qualification shall be required to submit certified photocopies of latest documents related to valid Trade License, TIN Certificate, VAT Registration Number and Financial Solvency Certificate showing liquid asset of at least BDT 1,20,000/- (One Lakh Twenty Thousand) only from any scheduled Bank; without which the Quotation may be considered non-responsive without which the Quotation may be considered non-responsive.
Project: Revitalization, Pollution-free and Eviction of Encroachment of Salta River in Khulna District.
Location of work / delivery: Dumuria, Khulna
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Noor Nagar, Khulna, City: Khulna, Thana: Khulna City Corporation, District: Khulna - 9000, Country: Bangladesh,
See more tenders from
Khulna WD Division-1; Bangladesh Water Development Board (BWDB):
1242094 : Khulna-1/Sol/2025-26/W-03
Re-excavation of Lower Shoilmari River from km. 5.000 to km. 7.000=2.000 km. in Batiaghata Upazila, Dist:- Khulna in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna during the year 2025-26.
1242093 : Khulna-1/Sol/2025-26/W-02
Re-excavation of Lower Shoilmari River from km. 3.000 to km. 5.000 = 2.000 km. in Batiaghata Upazila, Dist:- Khulna in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna.
1242092 : Khulna-1/Sol/2025-26/W-05
Re-excavation of Ramdia khal from km. 0.000 to Km. 4.500=4.500km in Batiaghata Upazila, Dist:- Khulna in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna during the year 2025-26.
1242091 : Khulna-1/Sol/2025-26/G-05
Supply, Installation & Commissioning of 5 Nos (3nos for Ramdia & 2nos for Shoilmari ) (35Cusec capacity each) submersible axial flow propeller water pump at upstream of Ramdia (9-vent) & Shoilmari (10-vent) of Khulna district along with construction of necessary civil & electrical works in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna during the year 2025-26.
1205724 : Khulna-1/Salta/2025-2/W-09
Repair work of Bakultola Regulator in connection with the project Re-excavation of Salta River for mitigation of pollution, eviction of illegal Structures & Rejuvenation of Salta River under Khulna District under Khulna Water Development Division-1, BWDB, Khulna.
1205387 : Khulna-1/Salta/2025-2/W-03
Re-excavation of Tiabunia Khal from Km.0.000 to Km. 1.700 = 1.700 Km. in connection with the project Re-excavation of Salta River for mitigation of pollution, eviction of illegal Structures & Rejuvenation of Salta River under Khulna District under Khulna Water Development Division-1, BWDB, Khulna.