LTM tenders of Gazipur district. |
OSTETM tenders of Gazipur zilla. |
OTM tenders of Gazipur. |
View All the active tenders of Gazipur district.
eGP Tender ID: 1244632; Works (NCT)
APP ID: 214715;
District: Gazipur
Reference No.: EE_GAZI/e-GP/T-1/2025-2026/1187; Date: 11/03/2026
Package Title: Bank Protective Work along the Right bank of Shitalakshya River from km 64.183 to km 64.250 = 67.00 meter & along the Right bank of Shaoraid Khal from km 0.00 to km 0.0100= 10.00 meter Total 77.00m to protect the area of Shaoraid Village at Moktarpur union of Kaliganj upazila of Gazipur District under Gazipur WD Division, BWDB, Gazipur.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Gazipur WD Division, BWDB
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-03-11 15:00:00
Document last selling: 2026-03-29 17:00:00
Closing / Opening: 2026-03-29 18:00:00
Brief Description of Package: Bank Protective Work along the Right bank of Shitalakshya River from km 64.183 to km 64.250 = 67.00 meter & along the Right bank of Shaoraid Khal from km 0.00 to km 0.0100= 10.00 meter Total 77.00m to protect the area of Shaoraid Village at Moktarpur union of Kaliganj upazila of Gazipur District under Gazipur WD Division, BWDB, Gazipur.
Tender Document Price: Tk. 2500;
Tender Security: 290000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 9666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 29000000 BDT.
Thus, Official Cost Estimate should be BDT. 9666666 ~ 29000000.
Eligibility criteria:
1. All the tenderers/firms must be registered with CPTU through e-GP portal.
2. Detail Turnover Calculation sheet mentioning the Name of Work, PE name etc (Year wise over the last Three years) duly signed by the Tenderer must be submitted with the tender.
3. The tenderer Must submit the Line of Credit from any scheduled bank of Bangladesh in the specified supplied format.(Copy supplied, See sec-7)
4. It is the duty of the tenderer to submit all clear documents (readable/openable). If any documents get corrupted and TEC could not be able to open the file, no claim from the tenderer regarding the file will be entertained.
5. VAT & IT from bill will be as per prevailing Government Rate. No extra claim will be entertained in this regard.
6. Evaluation will be done following the latest Gazette/Circular from CPTU & PPR-2025 shall be followed.
7. Detailed list of work in hand/Ongoing works duly signed by the tenderer must be submitted.
8. The contractor has to keep video and image records of the work in different stages (before starting, during and after completion) at his own cost and submit the same to the office of the Executive Engineer. (Circular attached in Section-8).
9. The Tenderer will visit and examine the Site with his own responsibility and expenses and obtain all information that maybe necessary for preparing the Tender document and entering into a Contract for the execution of the works.
10. Irrevalent doccuments should not be submitted.
Location of work / delivery: Shaoraid Village at Moktarpur union of Kaliganj upazila of Gazipur District
Budget Type: Revenue
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: BWDB,GAZIPUR, City: GAZIPUR, Thana: Gazipur Sadar, District: Gazipur - 1700, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Gazipur WD Division, BWDB; Bangladesh Water Development Board (BWDB):
1256656 : NDR-GAZI-OTM-08/2025-2026
River Bank Protective work (Permanent) at the Right Bank of Turag River (nearby Dhaka Tangail Highway) from km 118.915 to km 118.985 Total 70.00 m at Baimail area (adjacent to kodda bazar) of Gazipur City Corporation (ward no. 12) of Gazipur Sadar Upazila of Gazipur District under Gazipur WD Division, BWDB, Gazipur.
1244631 : NDR-GAZI-OTM-06/2025-2026
River Bank Protective work (Precautionary) of Bongshai Khal from km 0.051 to km 0.125 = 74.00m adjacent to the Estuary of Turag River & Bongshai Khal to protect the area of Uttor Hijoltali Village of Sutrapur Union of Kaliakair Upazilla of Gazipur District under Gazipur WD Division, BWDB, Gazipur.
1206308 : NDR-GAZI-OTM-05/2025-2026
River Bank Protection work (Precautionary) to prevent erosion of the Left Bank of Banar River from km 0.690 to km 0.770 total 80m at South Khirati village of Ghagotia Union of Kapasia Upazila of Gazipur district under Gazipur WD Division, BWDB, Gazipur.
1206095 : NDR-GAZI-OTM-02/2025-2026
River Bank Protective work (Precautionary) at the Left Bank of Turag River from Chainage km 96.922 to km 97.242 Total 320.00m & km 97.782 to km 97.902 Total 120.00m Grand Total 440.00m at Modonkhali (02nos ward) Village of Boalia Union of Kaliakair Upazila of Gazipur District under Gazipur WD Division, BWDB, Gazipur.
1204758 : NDR-GAZI-OTM-04/2025-2026
River Bank Protection work (Precautionary) to prevent erosion of the Right Bank of Shitalakshya River from km 103.200 to 103.330 total 130m at Nainda Sangun village of Kawraid Union of Sreepur Upazila of Gazipur district under Gazipur WD Division, BWDB, Gazipur.