LTM tenders of Bandarban district. |
OSTETM tenders of Bandarban zilla. |
OTM tenders of Bandarban. |
View All the active tenders of Bandarban district.
eGP Tender ID: 1212922; Works (NCT)
APP ID: 215773;
District: Bandarban
Package Title: Precautionary Bank Protection Work On The Right Bank Of Jhanka Khal From Km 2.080 To Km. 2.160 = 80 m At Rajbila Police Phari In Upazilla Bandarban Sadar District Bandarban Under Cox'sBazar WD Division-2, BWDB, Bandarban.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Cox's Bazar WD Division 2
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-01-19 13:30:00
Document last selling: 2026-01-29 11:00:00
Closing / Opening: 2026-01-29 13:30:00
Brief Description of Package: Ban-45/2025-26
Precautionary Bank Protection Work On The Right Bank Of Jhanka Khal From Km 2.080 To Km. 2.160 = 80 m At Rajbila Police Phari In Upazilla Bandarban Sadar District Bandarban Under Cox'sBazar WD Division-2, BWDB, Bandarban.
Tender Document Price: Tk. 1500;
Tender Security: 80000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 2666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 8000000 BDT.
Thus, Official Cost Estimate should be BDT. 2666666 ~ 8000000.
Eligibility criteria:
All the egp enlisted contractor satisfying the criteria mentioned in e-PW2(a) (For GOB Fund only), document attached herewith as per PPA-2006 and latest PPR-2025.
Special Instruction:
1. The work may be totally dropped, decreased or increased depending on the project period and available funds as well. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work.
2. The Tenderers with their own responsibility and expense will visit and examine the Site and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works.
3. Tenderers must submit all required documents mentioned in the tender datasheet. Failing to comply with the requirements, the tender will be rejected.
4. Tenderers must submit work completion certificates in supporting their annual construction turnover.
5. Liquid asset (credit commitment) certificate must be submitted in the prescribed format from BWDB/CPTU as attached in section 7 (General Specification).
6. Payment will be made after getting funds.
7. Rating matrix table must be filled-up with authentic information by the tenderer.
The contractor will take still pictures as well as videos of the project at his own cost and submit the invoice(expenditures) with the work bill.
Location of work / delivery: Bandarban Sadar, Bandarban
Budget Type: Revenue
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Bandarban Sadar, City: Bandarban, Thana: Bandarban Sadar, District: Bandarban - 4600, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Cox's Bazar WD Division 2; Bangladesh Water Development Board (BWDB):
1259317 : Ban-47/2025-26
Bank Protection Work at Gobindapur, Paharchada From Km 5.800 To Km 5.960=160.00m Along the Right Bank of Matamuhuri River at Upazila: Chakaria, Dist- Cox's Bazar Under Cox'sbazar WD Division-2, BWDB, Bandarban.
1216425 : Ban-46/2025-26
Repair works of Monitoring room under the Harbang Irrigration Project at Upazilla:- Chakaria, District- Cox'sBazar Under Cox'sBazar Water Development Division-2,BWDB, Bandarban during the FY2025-26.
1211430 : Ban-39/RFQ/2025-26
Survey, Measurement and Demarcation of Land including Removal of Illegal Occupation and Construction of Boundary Pillars.in Bandarban District under Cox's Bazar WD Division -2,BWDB, Bandarban during the year 2025-26.
1211429 : Ban-41/RFQ/2025-26
Supply and Fitting fixing of the water supply system materials of the Bandarban WD sub-division under Cox's Bazar WD Division-2, BWDB, Bandarban during the year 2025-26
1211428 : Ban-33/RFQ/2025-26
Repair & maintenance of embankment (filling rat holes, rain-cuts, gogs levelling, dressing, etc.) of R/B embankment between km.3.000 to km. 4.000= 1.000km of Harbangchara Irrigation Project at Harbang in Upazila- Chakaria,District-Cox's Bazar, Under Cox's Bazar WD Division-2. BWDB, Bandarban, during the year 2025-2026.