LTM tenders of Pabna district. |
OSTETM tenders of Pabna zilla. |
OTM tenders of Pabna. |
View All the active tenders of Pabna district.
eGP Tender ID: 1206086; Works (NCT)
APP ID: 213832;
District: Pabna
Package Title: Re-excavation of Sonkarpur Khal From km.1.650 to km. 11.650 = 10.000 Km at Pabna Sadar & Atghoria Upazilla, Pabna District in c/w PIRDP Under Pabna WD Division, BWDB, Pabna During the FY 2025-26.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Pabna WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2026-01-06 17:00:00
Document last selling: 2026-01-27 16:00:00
Closing / Opening: 2026-01-28 11:30:00
Brief Description of Package: Re-excavation of Sonkarpur Khal From km.1.650 to km. 11.650 = 10.000 Km at Pabna Sadar & Atghoria Upazilla, Pabna District in c/w PIRDP Under Pabna WD Division, BWDB, Pabna During the FY 2025-26.
Tender Document Price: Tk. 4000;
Tender Security: 1900000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 63333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 190000000 BDT.
Thus, Official Cost Estimate should be BDT. 63333333 ~ 190000000.
Eligibility criteria:
A) Tenderers Registerd with e-gp having valid Trade Licence, TIN number, VAT Registration, Nationality (NID), Declaration aboutlegal capacity to enter in to the contract.are eligible
Eligibilities:
B)
1. All tenderers/firms must be registered with BPPA through the e-GP portal.
2. All administrative orders regarding payment issued from time to time will be followed strictly.
3. Payment will be made on the availability of funds.
4. The scope of work/ contract price may be reduced depending on actual field conditions and fund Allocation.
5. The contractor must visit the site and get acquainted with the condition of the site, the scope of work, and the availableworkspace before tendering.
6. No fees will be provided for preparing and submitting the offer.
7. The contractor must keep video and image records of the work in different stages (before starting, during, and after completion)at his own cost and submit them to the office of the Executive Engineer, BWDB, Rajshahi (Circular attached in Section 7).
8. Letter of Commitment for Banks Undertaking for Line of Credit must be submitted in the specific form ePW2A-8 without anyalteration. Otherwise Tender will be non-responsive. (Letter of Commitment form ePW2A-8 enclosed in General Specification inSection 7).
9. Volume of work may be increased or decreased or totally dropped depending upon the actual field condition.
10. The tenderer must provide authentic and complete information about previous performance and current commitment/ongoingworks.
11. The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever.
Location of work / delivery: Pabna Sadar, Atghoria, Pabna
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Pabna, City: Pabna, Thana: Pabna Sadar, District: Pabna - 6600, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Pabna WD Division; Bangladesh Water Development Board (BWDB):
1206088 : PABNA-OTM-04/2025-2026
Precautionary Bank Protection Work along the left bank of Padma River at Ariyagohailbari, Union: Chartarapur Upazilla: Pabna Sadar , District Pabna From Km 13.140 to Km. 13.450 = 310.00 m in C/W PIRDP Under the Pabna WD Division , BWDB, Pabna During the FY: 2025-2026.
1206087 : PABNA-OTM-03/2025-2026
Precautionary Bank Protection Work along the left bank of Padma River at Kathuliya, Union: Varara Upazilla: Pabna Sadar , District Pabna From Km 12.310 to Km. 12.750 = 440.00 m in C/W PIRDP Under the Pabna WD Division , BWDB, Pabna During the FY: 2025-2026.
1206085 : PABNA-OTM-01/2025-2026
Re-excavation of Poddokol Khal From km.0.000 to km. 4.000 = 4.000 Km at Pabna Sadar Upazilla, Pabna District in c/w PIRDP Under Pabna WD Division, BWDB, Pabna During the FY 2025-26.