Login |Register

LTM tenders of Thakurgaon district. | OSTETM tenders of Thakurgaon zilla. | OTM tenders of Thakurgaon. | View All the active tenders of Thakurgaon district.

eGP Tender ID: 1194577; Works (NCT)
APP ID: 216901; District: Thakurgaon
Reference No.: 42.01.9400.181.07.004.25-3701, Date:14/12/2025
Package Title: Precautionary Bank Protection work of Right Bank of Tangon River at Chainage km. 57.800 to km. 58.000 = 200.00 m at Uttor Vamdha Union: Kusharanigonj Upazila: Pirgonj, Dist. Thakurgaon under Thakurgaon WD Division, BWDB, Thakurgaon.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Thakurgaon WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-12-15 19:35:00
Document last selling: 2025-12-29 17:00:00
Closing / Opening: 2025-12-30 12:00:00
Brief Description of Package: Precautionary Bank Protection work of Right Bank of Tangon River at Chainage km. 57.800 to km. 58.000 = 200.00 m at Uttor Vamdha Union: Kusharanigonj Upazila: Pirgonj, Dist. Thakurgaon under Thakurgaon WD Division, BWDB, Thakurgaon.
Tender Document Price: Tk. 2500; Tender Security: 130000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 4333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 13000000 BDT.
Thus, Official Cost Estimate should be BDT. 4333333 ~ 13000000.

Eligibility criteria:
Any individual(s) firms who fulfill the qualification(s) criteria of each package as stipulated in the Tender Data Sheet (TDS) & other condition of the tender documents. The Tenderer are requested to read carefully the instructions in setion-2 (TDS) ; section-4 (PCC) & section-8 ( Particular Specification) & strictly follow the instructions.
Specical Instructions:
(a) Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved.
(b) Work certificate which is issued by the PE ( Procuring Entity) and executed by the public fund will only be considered as a qualification criteria.
(c) The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work.
(d) The Tenderer will visit and examine the Site with his own responsibility and expenses and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works.
(e) Latest Govt. circular on procurement of works will be applicable
(f) The Tenderer has to arrange land or other establishment by his own for execution of work. Test fee for the required test (as per direction of Engineer in Charge) conducted during/after the work to be paid by the contractor.
(g) Before and after the execution of work videos and pictures have to be taken by the contractor on his own and submitted to the PE which representing the actual situation of work.
(h) Taskforce measurement report, uploaded BWDB specification must be followed by the contractor.
(i) Block/ Geobag rejected by the BWDB, Taskforce committee shall be dumped or placed without any additional payment.
Location of work / delivery: Pirganj, Thakurgaon
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Thakurgaon, City: Thakurgaon, Thana: Thakurgaon Sadar, District: Thakurgaon - 5100, Country: Bangladesh,


See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Thakurgaon WD Division; Bangladesh Water Development Board (BWDB)
:
1342491 : Thakurgaon/Vulli/PW-01 Bank Protection work of Left Bank of Vulli River at Vulli Bazar area from km. 8.300 to km. 8.510 = 210.00 m in c/w "Sustainable River Management at Panchagarh and Thakurgaon Districts" Project under Thakurgaon WD Division, BWDB, Thakurgaon.
1342490 : Thakurgaon/Tirnoi/PW-03 Bank Protection work on Left Bank of Tirnoi River at Baliadangi Upazila Porishad area from km. 26.820 to km. 26.970 = 150.00 m in Upazila-Baliadangi, District-Thakurgaon in C/W ''Sustainable River Management in Panchagarh and Thakurgaon District Project(1st part)" under Thakurgaon WD Division, BWDB, Thakurgaon.
1342489 : Thakurgaon/Tirnoi/PW-02 Bank Protection on Right Bank of Tirnoi River at Boro Polash Bari Madrasha from km. 42.90 to Km43.04 = 140 m & km. 43.54 to Km.43.84 = 300 m, Total =440 .00 m in Upazila-Baliadangi , Dist-Thakurgaon in c/w "Sustainable River Management Project in Panchagarh and Thakurgaon Districts (1st Part)" under Thakurgaon WD Division.Thakurgaon.
1342488 : Thakurgaon/Tangon/PW-15 Bank Protection work on Right Bank of Tangon River at Bazar Dekha area from km. 63.200 to km. 63.600 = 400.00 m in Upazila-Pirganj, District-Thakurgaon. in C/W ''Sustainable River Management in Panchagarh and Thakurgaon District Project (1st part)" under Thakurgaon WD Division, BWDB, Thakurgaon.
1342487 : Thakurgaon/Tirnoi/PW-01 Bank Protection work on Right Bank of Tirnoi River at Kashua Puraton Bosti area from km. 46.200 to km. 46.525 = 325.00 m in Upazila-Baliadangi, District-Thakurgaon. in C/W ''Sustainable River Management in Panchagarh and Thakurgaon District Project''(1st part) under Thakurgaon WD Division, BWDB, Thakurgaon.
1342486 : Thakurgaon/Tangon/PW-14 Bank Protection work on Left Bank of Tangon River at Shahpara area from km. 30.245 to km. 30.560 = 315.00 m in Upazila-Thakurgaon Sadar, District-Thakurgaon. in C/W ''Sustainable River Management in Panchagarh and Thakurgaon District Project(1st part)" under Thakurgaon WD Division, BWDB, Thakurgaon.
Share on Twitter