Login |Register

LTM tenders of Sirajganj district. | OSTETM tenders of Sirajganj zilla. | OTM tenders of Sirajganj. | View All the active tenders of Sirajganj district.

eGP Tender ID: 1180422; Works (NCT)
APP ID: 214681; District: Sirajganj
Reference No.: T-7/2514; Dated:02/12/2025
Package Title: Precautionary bank protective work on the Right bank of Karotoa river km. 5.300 to km. 5.420 = 120.00m at Noornagar in Upazila-Kamarkhanda, District-Sirajganj under Sirajganj WD Division, BWDB, Sirajganj during the year 2025-2026.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Sirajganj WD Division, BWDB
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-12-03 10:00:00
Document last selling: 2025-12-18 12:00:00
Closing / Opening: 2025-12-18 14:00:00
Brief Description of Package: NDR-OTM-14/2025-26
Precautionary bank protective work on the Right bank of Karotoa river km. 5.300 to km. 5.420 = 120.00m at Noornagar in Upazila-Kamarkhanda, District-Sirajganj under Sirajganj WD Division, BWDB, Sirajganj during the year 2025-2026.
Tender Document Price: Tk. 2500; Tender Security: 200000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 6666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 20000000 BDT.
Thus, Official Cost Estimate should be BDT. 6666666 ~ 20000000.

Eligibility criteria:
1. Payment will be made subject to budget allocation & availability of funds but the work must be continued and proportionate progress must be achieved.
2. Any individual Tender (s)/firm (s) who fulfill the qualification (s) criteria stipulated in the Standard Tender Document including Tender datasheet and PPR-2025 has to be considered.
3. The work may be totally dropped, decreased, or increased.
4. There is no provision for land acquisition. The tenderer has to arrange land for the execution of other works on his own.
5. The tenderer has to capture pictures and videos of the work at his own cost as per the direction of the engineer in charge. He should submit pictures and videos during the time of bill submission.
6. "All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019."
7. Tenderer should provide all ongoing works and existing commitments properly, otherwise Tenderer will be Non-reponsive.
Location of work / delivery: Kamarkhanda, Sirajganj
Budget Type: Revenue
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Sirajganj, City: Sirajganj, Thana: Sirajganj Sadar, District: Sirajganj - 6700, Country: Bangladesh,


See more tenders from Sirajganj WD Division, BWDB; Bangladesh Water Development Board (BWDB):
1181815 : NDR-OTM-09/colony/2025-2026 Repair of Office Building under Sirajganj WD Division, BWDB, Sirajganj during the FY 2025-2026.
1181812 : NDR-OTM-08/2025-2026 Repair of Godown under the Brahmaputra Right Bank Flood Control Embankment Project Sirajganj WD Division, BWDB, Sirajganj during the FY 2025-2026.
1181803 : NDR-OTM-07/2025-2026 Rehabilitation of Barrack under the Brahmaputra Right Bank Flood Control Embankment Project Sirajganj WD Division, BWDB, Sirajganj during the FY 2025-2026.
1181785 : NDR-OTM-06/2025-2026 Rehabilitation and Strengthening of existing protective work at Bhatpiari area on the right bank of Jamuna river from BRE km. 160.480 to km 160.717 = 237.00 m in Sadar Upazila, District- Sirajganj under Sirajganj WD Division, BWDB, Sirajganj. during the FY 2025-2026.
1181773 : NDR-OTM-05/2025-2026 Rehabilitation and Strengthening of existing protective work at Bhatpiari area on the right bank of Jamuna river from BRE km. 160.200 to km 160.437 = 237.00 m in Sadar Upazila, District- Sirajganj under Sirajganj WD Division, BWDB, Sirajganj. during the FY 2025-2026.
1181713 : NDR-OTM-03/2025-2026 Strengthening works on the right bank of Jamuna River in Meghai spur-1 area from BRE km. 140.850 to BRE km. 141.070 = 220.0 m in kazipur Upazila of Sirajganj District under Sirajganj Water Development Division, BWDB, Sirajganj during the FY 2025-2026.
Share on Twitter