Login |Register

LTM tenders of Faridpur district. | OSTETM tenders of Faridpur zilla. | OTM tenders of Faridpur. | View All the active tenders of Faridpur district.

eGP Tender ID: 1177940; Works (NCT)
APP ID: 215115; District: Faridpur
Reference No.: 03/e-GP/FRD/2025-2026 PMP Major Road
Package Title: Periodic Maintenance Programme (PMP-Major Road) providing partial Strengthening and Dense Bituminous Surfacing Wearing course Work at Ch: 48+800 (Das Hazar Gorostan Madrasha) to Ch: 52+800 (Char Dubali) and Ch: 55+200 (Baliahatti) to Ch: 61+700 (Kazi Bari Kaborstan) of Goalando- Faridpur- Tarail Road (Z-7108) under Road Division, Faridpur during the FY 2025-2026.
Organization: Roads & Highways Department (RHD)
Procuring Entity: Faridpur Road Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-11-20 16:00:00
Document last selling: 2025-12-14 17:00:00
Closing / Opening: 2025-12-15 12:00:00
Brief Description of Package: Periodic Maintenance Programme(PMP-Major Road) providing partial Strengthening and Dense Bituminous Surfacing Wearing course Work at Ch: 48+800 (Das Hazar Gorostan Madrasha) to Ch: 52+800 (Char Dubali) and Ch: 55+200 (Baliahatti) to Ch: 61+700 (Kazi Bari Kaborstan) of Goalando- Faridpur- Tarail Road (Z-7108) under Road Division, Faridpur during the FY 2025-2026.
Tender Document Price: Tk. 5000; Tender Security: 3000000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 100000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 300000000 BDT.
Thus, Official Cost Estimate should be BDT. 100000000 ~ 300000000.

Eligibility criteria:
All tenderers in Bangladesh registered in National e-GP System, who fulfill the qualification criteria as specified in the Tender Data Sheet (TDS) of the Tender Document.
Location of work / delivery: Faridpur Road Division
Budget Type: Revenue
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Faridpur Road Division, Sarak Bhaban, Faridpur, City: Faridpur, Thana: Faridpur Sadar, District: Faridpur - 0001, Country: Bangladesh,


See more tenders from Faridpur Road Division; Roads & Highways Department (RHD):
1181843 : 07/e-GP/FRD/2025-2026 PMP Bridge/Culvert PMP (Major-Bridge/Culvert) work for Construction of 01 Nos P.C Girder (Bailagotti) Bridge Span 44.02m (1x42.68m) Long at 13th km ( Ch: 12+397m) of Faridpur(Badarpur)-Saltha-Sonapur-Muksudpur Zilla Highway (Z-7004) under Road Division Faridpur during the year 2025-2026.
1181842 : 06/e-GP/FRD/2025-2026 PMP Bridge/Culvet Re- Construction of 01 Nos P.C Girder (Kalikhola) Bridge Span 44.02m(1x42.68m) Long at 31st km( Ch: 30+978m) of Goalondo - Faridpur-Tarail Zilla Highway (Z-7108) under Road Division Faridpur during the year 2025-2026.
1181841 : 05/e-GP/FRD/2025-2026 PMP Bridge/Culvert PMP (Major-Bridge) work for Re-Construction of 1 Nos P.C Girder (Malopara) Bridge Span 44.02m (1x42.68m) Long at 51st km (Ch: 50+586m) of Goalondo-Faridpur-Tarail Zilla Highway (Z-7108) under Road Division Faridpur During the FY 2025-2026.
1177941 : 04/e-GP/FRD/2025-2026 PMP Major Road Periodic Maintenance Programme (PMP-Major Roads) Repairing and Maintening with DBS Base; Wearing Course and Rigid Pavement at Ch. 00+000 (Bhanga Rastar More) to Ch. 5+539 ( S.S. Ghat) of Faridpur Town Old Section (Alipur-Faridpur-SS Ghat) Road (N-803) under Road Division, Faridpur During the year 2025-2026.
1177939 : 02/e-GP/FRD/2025-2026 PMP Major Road PMP (Major-Roads) Repair and Maintenance Works by DBS Wearing Course & Rigid Pavement at Ch. 27+500 (In Front of River Research Institute) to Ch. 32+050 (Rajbari Raster Mor) of Faridpur Bhanga-Faridpur(Goalchamot) Road (N-804) under Road Division, Faridpur during the year 2025-2026.
Share on Twitter