LTM tenders of Satkhira district. |
OSTETM tenders of Satkhira zilla. |
OTM tenders of Satkhira. |
View All the active tenders of Satkhira district.
eGP Tender ID: 1139467; Works (NCT)
APP ID: 204337;
District: Satkhira
Package Title: Precautionary River Bank Protection from km 18.700 to 19.500, km 19.700 to 20.180, km 22.050 to 22.350, km 25.390 to 25.690 and km 25.900 to 26.105; in Total 2.085 Km of Polder No. 15 under the project "Rehabilitation of Polder No. 15 in Satkhira District"
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Satkhira WD Division-1
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-08-13 23:00:00
Document last selling: 2025-08-31 17:00:00
Closing / Opening: 2025-09-01 16:00:00
Brief Description of Package: Package No: W Sat-1/50/2024-25
Precautionary River Bank Protection from km 18.700 to 19.500, km 19.700 to 20.180, km 22.050 to 22.350, km 25.390 to 25.690 and km 25.900 to 26.105; in Total 2.085 Km of Polder No. 15 under the project "Rehabilitation of Polder No. 15 in Satkhira District"
Tender Document Price: Tk. 4000;
Tender Security: 4000000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 133333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 400000000 BDT.
Thus, Official Cost Estimate should be BDT. 133333333 ~ 400000000.
Eligibility criteria:
All the egp enlisted contractor satisfying the criteria mentioned in e-PW3 document attached herewith as per PPA-2006 and latest PPR-2008. The following conditions are applicable:
Payment of work will be made on availability of budget & fund release. No extra claim/ interest for delaying in payment will be entertained. R/A bill will be entertained on the availability of budget and fund. But work progress will not be hampered for lack of fund release/ want of R/A Bill.
Latest Technical specification for civil work of BWDB will govern provided in particular specifications.
The design may be changed/altered/revised (if required) and quantity of tender item may be increased or decreased.
Prework & Postwork will be taken by Taskforce and BWDB’s concern engineer in charge. Final Payment will be made on the measurement taken by Taskforce.
The selected contractor will handover total work site at a time. No scope to handover the site partly.The all the conditions are specified in separate sheet attached in General specifications Taskforce guideline of BWDB will govern enclosed in General specifications.
Project: Rehabilitation of Polder No. 15 in Satkhira District
Location of work / delivery: Shyamnagar, Satkhira
Budget Type: Development
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: BWDB, Satkhira, City: Satkhira, Thana: Satkhira Sadar, District: Satkhira - 9400, Country: Bangladesh,
See more tenders from
Satkhira WD Division-1; Bangladesh Water Development Board (BWDB):
1280469 : W Sat-1/20/Remaining Work
Permanent Protective work with rehabilitation of Embankment of Length 0.415 from km 26.105 to km 26.520 of Polder No. 15 at Gabura under "Rehabilitation of polder-15 at Satkhira District (1st Revised)" Project
1280468 : W Sat-1/19/Remaining Work
Permanent Protective work with rehabilitation of Embankment of Length 0.210 from km 25.690 to km 25.900 of Polder No. 15 at Gabura under "Rehabilitation of polder-15 at Satkhira District (1st Revised)" Project.
1276443 : NDR Sat1/P-45/2025-26
Supply, Filling & Placing/Dumping of 11000 nos. 175 kg Polyster Geotextile bag for Emergency Flood Fighting at various places of Satkhira District as per instruction of Engineer in charge under Satkhira WD Division-1.
1276441 : NDR Sat1/P-43/2025-26
Supply and Installation of regulator gates (shutters), along with the related mechanical components, as part of the repair and maintenance of various regulators Under Operation Budget during the FY 25-26.
1276436 : NDR Sat1/P-38/2025-26
Temporary bank Protection Work from ch. Km 104.330 to 104.380 = 0.050 Km of Polder No-5 at Nildumur BGB camp Under Operation Budget of Shyamnagar Upazila in Satkhira District during the FY 25-26.
1195467 : NDR Sat1/P-24/2025-26
Repair of Embankment along with Temporary Slope Protection Work (1) from ch. Km 34.604 to 34.634=0.030 Km at Noikathi (2) from ch. Km 35.180 to 35.210=0.030 Km at Astakhali (3) from ch. Km 43.225 to 43.265=0.040 Km at Sholkhali Total 0.100 Km of Polder No-5 Under Operation Budget of Shyamnagar Upazila in Satkhira District during the FY 25-26.