LTM tenders of Kushtia district. |
OSTETM tenders of Kushtia zilla. |
OTM tenders of Kushtia. |
View All the active tenders of Kushtia district.
eGP Tender ID: 1130217; Works (NCT)
APP ID: 214433;
District: Kushtia
Reference No.: 46.02.0000.564.07.029.23-137 Date:22/06/2025
Package Title: (1) Improvement of BC Road, Drain, Footpath & Street Light at Khondaker Aminul Haque Badsha Road (Ch. 0+000 to 0+954m) and Link-1, (Ch. 0+000 to 0+700m) & Link-2 (Ch. 0+000 to 0+650m) (2) Improvement of BC Road, Drain, Footpath & Street Light at Kabi Azizur Rahman Road. (Ch. 0+000 to 0+672m) (3) Improvement of BC Road, Drain, Footpath and streetlight at Adv. Mahtab Uddin Road. (Ch. 0+000 to 0+900m) (4) Improvement of BC Road, Drain, Footpath and streetlight at Mir Mosharof Hossain Road. (Ch. 0+000 to 1+887m) Under Kushtia Pourashava Dist.Kushtia
Organization: Local Government Engineering Department (LGED)
Procuring Entity: PIU Office of Kushtia Pourashava, Kushtia
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-08-03 09:00:00
Document last selling: 2025-09-03 15:00:00
Closing / Opening: 2025-09-04 15:00:00
Brief Description of Package: (1) Improvement of BC Road, Drain, Footpath & Street Light at Khondaker Aminul Haque Badsha Road (Ch. 0+000 to 0+954m) and Link-1, (Ch. 0+000 to 0+700m) & Link-2 (Ch. 0+000 to 0+650m) (2) Improvement of BC Road, Drain, Footpath & Street Light at Kabi Azizur Rahman Road. (Ch. 0+000 to 0+672m) (3) Improvement of BC Road, Drain, Footpath and streetlight at Adv. Mahtab Uddin Road. (Ch. 0+000 to 0+900m) (4) Improvement of BC Road, Drain, Footpath and streetlight at Mir Mosharof Hossain Road. (Ch. 0+000 to 1+887m) Under Kushtia Pourashava Dist.Kushtia
Tender Document Price: Tk. 4000;
Tender Security: 6500000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 216666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 650000000 BDT.
Thus, Official Cost Estimate should be BDT. 216666666 ~ 650000000.
Eligibility criteria:
As per TDS & ITT
Project: Resilient Urban and Territorial Development Project (RUTDP)
Location of work / delivery: Kushtia Pourashava
Budget Type: Development
Development Partner: World Bank
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Kushtia Pourashava, Kushtia, City: Kushtia Pourashava, Thana: Kushtia Sadar, District: Kushtia - 7000, Country: Bangladesh,