Login |Register

LTM tenders of Chapai Nawabganj district. | OSTETM tenders of Chapai Nawabganj zilla. | OTM tenders of Chapai Nawabganj. | View All the active tenders of Chapai Nawabganj district.

eGP Tender ID: 1117300; Works (NCT)
APP ID: 209486; District: Chapai Nawabganj
Reference No.: APP ID-209486
Package Title: Construction of 2nd, Mohananda Bridge Approch Connecting road from 2nd, Mohananda Bridge Binpara mor to Adherer mor (Kopra Khal) Ch. 600-1300.00m Part A: Gener-al & Site Facilites Works, Part B: Earth filling Works of Embankment, Part C: Pavement & Surfacing Works, Part -D Protection of Protective & Part -E: Electrical Works Chapainawabganj. Pourashava, Dist. Chapainawabganj.
Organization: Local Government Engineering Department (LGED)
Procuring Entity: PIU Office of Chapai Nawabganj Pourashava, Chapai Nawabganj
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-06-02 11:00:00
Document last selling: 2025-06-29 17:00:00
Closing / Opening: 2025-06-30 12:50:00
Brief Description of Package: Construction of 2nd, Mohananda Bridge Approch Connecting road from 2nd, Mohananda Bridge Binpara mor to Adherer mor (Kopra Khal) Ch. 600-1300.00m Part A: Gener-al & Site Facilites Works, Part B: Earth filling Works of Embankment, Part C: Pavement & Surfacing Works, Part -D Protection of Protective & Part -E: Electrical Works Chapainawabganj. Pourashava, Dist. Chapainawabganj.
Tender Document Price: Tk. 4000; Tender Security: 1400000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 46666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 140000000 BDT.
Thus, Official Cost Estimate should be BDT. 46666666 ~ 140000000.

Eligibility criteria:
As per TDS
Project: Construction of Connecting Road with Sheikh Hasina Bridge over Mohananda River under Chapai Nawabganj District
Location of work / delivery: Under Chapainawabganj Pourashava
Budget Type: Development
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: Chapai Nawabganj Pourashava, Chapai Nawabganj, City: Chapai Nawabganj, Thana: Chapainawabganj Sadar, District: Chapai Nawabganj - 6300, Country: Bangladesh,


See more tenders from PIU Office of Chapai Nawabganj Pourashava, Chapai Nawabganj; Local Government Engineering Department (LGED):
1148646 : RUTDP/CHN/2024-25/W-01 Improvement of BC Road, Improvement RCC Drain, Footpath and Street light of start from Hospital More Puraton Bazar to Adhirer Mour via Santır mour and Bottola hat mour (Ch. 0+000 to 3+780m)
1139101 : CHAP/GOBPW-16/2024-25 Construction of 81.00m Long PSC Girder Bridge on Rajarampur Odhir Mor via Copra to 2nd, Mohananda Bridge, Part A: Main Bridge Works, Part B: Occupation Health and Safety(OHS) Main Bridge Works, Part C: Abutment Slope Protection of Protective Works, Part D: Genarel & Site facilities in/c Environmental Mitigation and Enhancement Works, Part E: Electrical Works & Part F: Provisonal sum Works under Chapainawabganj Pourashava, Dist. Chapainawabganj.
1131329 : CHAP/GOBPW-17/2024-25 Improvement of Uni-Block Road from Horipur Miyapara RHD to Kalu Mia House (Ch. 00-670m) with link Dewan para (Ch. 00-570m) Construction of RCC drain by the side of Horipur Miapara from RHD to Kalu Mia House Ch. 00-730.00m with link H/O Okil Azom. Ch.00-102.00m (X-drain-5.00m). Total Length=832.00m Construction of Namosankarbati -Uzzalpara road road side RCC drain from Uzzalpara mor to H/O-Abdur Rahman. Ch.00-240.00m with link Ghospara mor to Adhir Langrar Mor.Ch. 260.00m Total Length=500.00m (Cross drain-10.00 & 5.00m) Construction of PTI Master para road by RCC & Uni-Block from RHD road A.K. khan filling station to PTI Masterpara main road with link Shibtola Pondit para Ch.00-300+L/s. link30m&Mehedi house 36.00m-366(RCC) Pondit para link-300m(Uni-Block) Total length-666.00m. R-2 Rehabilitation of Alinagor Vhutpukur Road by Uni-Block from Hajir mor to Iqbal Arotdar via pull para up to Gonka road and Govt primary school to vui pukur 200m ch.00- 515.00m+700+200=1415.00m Total=2041.00m Works under Chapainawabganj Pourashava, Dist: Chapainawabganj
1131328 : CHAP/GOBPW-13/2024-25 (i) Improvement of Sarkarpara road Uni-Block from Circuit House Mor to CCDB Culvert (Ch. 00-1545m.) (ii) Construction of RCC pipe Drain by the side of Sarkarpara road CCDB Mor to Circuit House(Ch. 00-1590m.)
1131327 : CHAP/GOBPW-11/2024-25 Upgrading of Namosankarbati Chandlai -Chomohoni road by Uni-Block from Chandlai club mor to Chowmohoni mor and existing drain cover slab. ch.00-1000m slab-750m Construction of RCC drain by the side Namosankarbati- Dhapapara Road Natunhat Road H/O-Latif with Dhapapara Madrasa Road Ch.566.00m, Link Mouripara Road from Natunhat Road Azaipur X-drain to Dhapapara existing drain. Ch.00-270.00m. Total-836.00m. Rehabilitation & Upgrading of Rehaichor Ticrampur road by DBC and Uni-Block from Rehaichor Mohananda Setu to Ticrampur Adorsomor.ch.00-2465.00m Improvement of Chandlai club mor Jamemosque Rehaichor Bankpara road by DBC & Uni-Block from Chandlai Jame Mosque to Bankpara Jamal Uddin Muntu house. Ch. 0+00-1+500 km
1131326 : CHAP/GOBPW-10/2024-25 Rehabilitation of Namorajarampur road by DBC& Uni-Block from Jorgachi mor to Horipur Shibpur Fulltola mor via Malopara mor with link Kumarpara mor and Battalahat Greed road. Ch.00-3685+200-3885m Kumarpara. Ch.00-420+110m, Battalahat Greed road. Ch.0-410m. Total Length 4825.00m.
See live tender notices for bridge,embankment,
Share on Twitter