LTM tenders of Naogaon district. |
OSTETM tenders of Naogaon zilla. |
OTM tenders of Naogaon. |
View All the active tenders of Naogaon district.
eGP Tender ID: 1107294; Works (NCT)
APP ID: 207299;
District: Naogaon
Reference No.: 42.01.6400.405.14.005.25-881; Dated:05-05-2025
Package Title: Precautionary Temporary Protective Work at Boldiaghat along the Right Bank of the Punarbhaba River from km. 11.050 to km 11.150 (Total 100m) in Upazila: Shapahar, District Naogaon under Naogaon Water Development Division, BWDB, Naogaon during the Year 2024-2025.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Naogaon WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-05-07 11:00:00
Document last selling: 2025-05-18 14:00:00
Closing / Opening: 2025-05-18 16:00:00
Brief Description of Package: Precautionary Temporary Protective Work at Boldiaghat along the Right Bank of the Punarbhaba River from km. 11.050 to km 11.150 (Total 100m) in Upazila: Shapahar, District Naogaon under Naogaon Water Development Division, BWDB, Naogaon during the Year 2024-2025.
Tender Document Price: Tk. 1000;
Tender Security: 100000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 3333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 10000000 BDT.
Thus, Official Cost Estimate should be BDT. 3333333 ~ 5000000.
Eligibility criteria:
As per STD.
“ A misrepresentation or omission regarding the value of existing commitments and ongoing works by a tenderer in the E-GP system constitutes a fraudulent practice under ITT Clause Corrupt, Fraudulent, Collusive, Coercive or Obstructive Practices. In that case, the tenderer will be non responsive, and further action may be taken in accordance with PPR 127 and ITT Clause Corrupt, Fraudulent, Collusive, Coercive or Obstructive Practices.”
Location of work / delivery: Sapahar, Naogaon
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Naogaon, City: Naogaon, Thana: Naogaon Sadar, District: Naogaon - 6500, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Naogaon WD Division; Bangladesh Water Development Board (BWDB):
1254311 : Package No. Naogaon/OM/EMBK/25-26/W-13
Repair work of embankment from km 14.000 to km 14.600 = 600 m in c/w 'Chalan Beel Project Polder-C' in Upazila: Atrai, District: Naogaon under Naogaon Water Development Division, BWDB, Naogaon during FY 2025-2026.
1204769 : Package No. Naogaon/OM/EMBK/25-26/W-11
Repair of Embankment From km 142.990 to km 143.664=674.00 m in c/w "Chalan Beel Polder-C Project" in Upazila: Manda, District: Naogaon under Naogaon Water Development Division BWDB, Naogaon during the FY 2025-26.
1195942 : Package No. Naogaon/OM/colony/25-26/W-7
Repair, maintenance and ancillary works of Office building, Inspection Bungalow and Executive Engineer's Residence at BWDB, Naogaon office compound Under Naogaon WD Division, BWDB, Naogaon during the FY 2025-2026.
1195918 : Package No. Naogaon/OM/EMBK/25-26/W-4
Precautionary slope protection work along the left bank of Atrai River from km. 0.700 to km. 0.910 = 210.00 m in c/w Nagor Valley Sub Project in Upzilla: Atrai, District: Naogaon under Naogaon WD Division, BWDB, Naogaon during the FY 2025-2026.
1107295 : OTM-12/2024-2025
Precautionary Temporary Protective work on the Left Bank of the Little Jamuna River from Km. 15.935 to Km. 16.080 (Total 145m) at Krishnapur in Upazila: Raninagar, District: Naogaon in c/w Raktadaha-Lohachura Beel Drainage Scheem Project under Naogaon WD Division, BWDB, Naogaon during the year 2024-2025.
1102708 : OTM-10/2024-2025
Supply, Filling and Placing/Dumping of 125 kg and 175 kg Geo-bags at different locations of embankment in Naogaon district under Naogaon Water Development Division, BWDB, Naogaon during the FY 2024-2025.