eGP Tender ID: 1106783; Works (NCT)
APP ID: 203935;
District: Narail
Reference No.: 42.01.6500.626.07.007.25.1064, Dated: 04/05/2025
Package Title: Precautionary Protective Work along the Right bank of Modhumoti river from Km.127.752 to Km.127.900 = 148.00 m. from erosion of the Modhumoti river at Chachoi in Modhumoti-Nabaganga Sub-Project under Operation & Maintenance Budget under Narail WD.Division, BWDB,Narail during the year 2024-25.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Narail WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-05-04 19:00:00
Document last selling: 2025-05-14 15:00:00
Closing / Opening: 2025-05-15 10:00:00
Brief Description of Package: Precautionary Protective Work along the Right bank of Modhumoti river from Km.127.752 to Km.127.900 = 148.00 m. from erosion of the Modhumoti river at Chachoi in Modhumoti-Nabaganga Sub-Project under Operation & Maintenance Budget under Narail WD.Division, BWDB,Narail during the year 2024-25.
Tender Document Price: Tk. 2000;
Tender Security: 225000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 7500000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 22500000 BDT.
Thus, Official Cost Estimate should be BDT. 7500000 ~ 20000000.
Eligibility criteria:
a) The Tenderer must be registered in the e-GP portal through CPTU along with a valid and updated Trade License, VAT registration and TIN certificate.
b) Quoted amount of tenderer beyond 10% above/less than official estimated cost will be non-responsive.
c) It is the duty of the contractor to submit all the documents freshly (without corruption). If any documents get corrupted and the evaluation committee is not able to open the file, no claim from the tenderer will be entertained regarding the file.
d) VAT & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard.
e) Tender evaluation will be done following the latest gazette /circular from CPTU.
f) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted.
g) If any kind of obstacles/structures are needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard.
h) If BWDB-owned/acquired land is insufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost.
i) BWDB's Task Force must check the quantity and quality of work.
j) Photo and video must have to be taken by the contractor at a different angle during pre-work and post-work measurement and submitted to the PE. No extra claim will be entertained in this regard. and
k) All other criteria stated in the tender document.
l) NoA will be issued subject to the approval of proper authority of BWDB and also Budget Provision.
Location of work / delivery: Lohagara, Narail
Budget Type: Revenue
Category: Construction work; Shipping operations; Water transport services; Hire of water transport equipment with crew; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator; Hire of vessels with crew; Hire of boats with crew
PE Address: Rupganj, Narail, City: Narail, Thana: Narail Sadar, District: Narail - 7500, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Narail WD Division; Bangladesh Water Development Board (BWDB):
1245283 : W-4/ADB/Narail/2025-26
Strengthening and repairing the damaged portion of the river bank protective works along the right bank of the Modhumoti River from km. 129.705 to km 129.775 (Old Km. 0.080 to km. 0.150), Total Length = 70.00 M at Shiarbor due to erosion of Modhumoti River in Upazila: Lohagara Upazilla, Narail District under Narail WD. division, BWDB, Narail during the year 2025-26.
1202370 : NDR/Narail/2025-26/W-04
Precautionary protective work along the left bank of Nabaganga river from Km 4.485 to Km. 4.553 = 68.00m due to erosion of Nabaganga river at Bishnupur & adjacent area in Upazila: Kalia, Dist: Narail under Narail WD. Division, BWDB, Narail during the year 2025-26.
1202367 : NDR/Narail/2025-26/W-02
Precautionary protective work along the right bank of Modhumoti River from Km. 133.603 to Km. 133.660= 57m from erosion of the Modhumoti river at Makrail and adjacent area in Modhumoti - Nabaganga Sub-Project in Upazila: Lohagara, District: Narail under Narail WD. division, BWDB, Narail during the year 2025-26.
1139628 : NDR/Narail/2025-26/W-01
Precautionary protective work along the right bank of Modhumoti river from Km. 127.650 to Km. 127.900 = 250.00 m. from erosion of the Modhumoti river at Chachoi in Modhumoti - Nabaganga Sub-Project under Operation & Maintenance Budget under Narail WD. Division, BWDB, Narail during the year 2025-26.
1106287 : W-03/Lot-01/24-25
construction of retard embankment from Km. 68.045 to Km. 71.145 =3.100 Km at Ghaga, Km. 75.655 to Km. 76.455 = 0.800 Km at Degreer char, Total = 3.900 Km. in right bank of Madhumoti River. Upazilla-Lohagora, District-Narail in Rehabilitation of Madhumoti - Nabaganga Sub-Project and Re-excavation/ Dredging of Nabaganga River to Revival and Conservation of Environmental Balance in Lohagora Upazila of Narail District under Narail WD. Division, BWDB, Narail.