LTM tenders of Gaibandha district. |
OSTETM tenders of Gaibandha zilla. |
OTM tenders of Gaibandha. |
View All the active tenders of Gaibandha district.
eGP Tender ID: 1088457; Works (NCT)
APP ID: 206519;
District: Gaibandha
Reference No.: T-41/2024-25, APP-206519
Package Title: A) Road Part:
Organization: Local Government Engineering Department (LGED)
Procuring Entity: Office of the Executive Engineer, LGED, Gaibandha
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-04-10 16:00:00
Document last selling: 2025-05-05 17:00:00
Closing / Opening: 2025-05-06 13:00:00
Brief Description of Package: PRO/GAI/FUL/VR/24-25/W-617
A) Road Part: Improvement of Horipur R-non Govt. Primary School - H/O (Shaha Member) Horipur at Ch: 00-900m. Road ID: 132215055. B) Structure Part: i) Construction of 1Nos 4.00 x 4.00m RCC.Box Culvert at Ch: 552m [Road ID: Road ID: 132215055] ii) Construction of 1 nos 1.00 x1.00m RCC. Cross Drain at Ch: 470m [Road ID: Road ID: 132215055] under Upazila: Fulchari, District: Gaibandha. [ Salvage Materials Cost: BDT 17,77,857.000]
Tender Document Price: Tk. 2000;
Tender Security: 350000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 11666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 35000000 BDT.
Thus, Official Cost Estimate should be BDT. 11666666 ~ 20000000.
Eligibility criteria:
As per tender document.
Project: Promoting Resilience of Vulnerable through Access to Infrastructure, Improved Skills and Information (PROVATi)
Location of work / delivery: Fulchari, Gaibandha
Budget Type: Development
Development Partner: International Fund for Agriculture Development (IFAD)
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: XEN Office, LGED, Gaibandha, City: Gaibandha, Thana: Gaibandha Sadar, District: Gaibandha - 5700, Country: Bangladesh,
See more tenders from
Office of the Executive Engineer, LGED, Gaibandha; Local Government Engineering Department (LGED):
1269378 : Pd/pori.Abashan/Gaibandha. W 1.55
Construction of 2 Nos 7 Storied (48-unit apartment) Gaibandha Paurashava Cleaners Residential Building including internal electrical works, lift & external electrical connection, electro-mechanical work, sanitary and water supply, boundary wall, internal road, drainage, earth work etc. under Upazila: Sadar, Dist. Gaibandha.
1263475 : GRRIIP/GAI/GOB/VRA/W-24
Improvement of Bashudebpur - Bera Maloncha (at Damodarpur Eidgha UZR) Road from Ch. 00m - 1500m by BC (Road ID No. 132304022) under Gobindaganj Upazila, District: Gaibandha.
1263474 : GRRIIP/GAI/GOB/VRA/W-23
A) Improvement of Bailgao - Chalita Kashirchara Road from Ch. 00m - 1150m by BC (Road ID No. 132304061) under Gobindaganj Upazila, District: Gaibandha. [Salvage Materials Cost: Tk. = 21,34,654/-]
B) Improvement of Shibpur UP - Dharma Road via Horipur School & Madrasha Road from Ch. 1300m - 2517m by BC (Road ID : 132304054) under Gobindaganj Upazila, District: Gaibandha.
1263473 : GRRIIP/GAI/SADU/VRB/W-10
A) Improvement of Gorerpara - Manduar via Salaipur Road from Ch.: 1000m - 2150m by BC (Road ID No.: 132825003) under Sadullapur Upazila, District: Gaibandha.
B) Improvement of Sadullahpur Dhaperhat Road from Ch. 00m - 2000m by BC (Road ID No.: 132825031) under Sadullapur Upazila. District: Gaibandha.
1263472 : GRRIIP/GAI/SADU/VRA/W-22
A) Improvement of Sadullapur Naldanga GC Road at Bottola Chander Bazar Road from Ch.: 4500m - 5000m by BC (Road ID No.: 132824059) under Sadullapur Upazila, District: Gaibandha.
B) Improvement of Khamar Dasholia School - Area of Bekadari Road from Ch. 00m - 1300m by BC (Road ID No. 132824032) under Sadullapur Upazila, District: Gaibandha. [Salvage Materials Cost: Tk. 35,412/-]
1245004 : GRRIIP/GAI/GOB/VRA/W-21
A) Improvement of Pargoyera - Zarippur Bazar via Kudam Road from Ch.: 00m -1625m by BC (Road ID No: 132304002) under Gobindaganj Upazila, District: Gaibandha. [Salvage Materials Cost: Tk. = 15,43,274/-]
B) Improvement of Shakahar UP - Kamdia GC via Aligram Road from Ch: 00m - 2982m by BC (Road ID No: 132304117) under Gobindaganj Upazila, District: Gaibandha. [Salvage Materials Cost: Tk. 1,16,964/-]
C) Improvement of Mirkuchi Madantair - Babanpur Rd via Baluepara Road from Ch.00m - 920m by BC (Road ID No: 132304158) under Gobindaganj Upazila, District: Gaibandha. [Salvage Materials Cost: Tk. 3,01,844/-]