Login |Register

LTM tenders of Pirojpur district. | OSTETM tenders of Pirojpur zilla. | OTM tenders of Pirojpur. | View All the active tenders of Pirojpur district.

eGP Tender ID: 1084514; Works (NCT)
APP ID: 211524; District: Pirojpur
Reference No.: T-1/3207, Date: 09/03/2025
Package Title: Re-excavation of Dogona Hat Khal from km 1.500 to km 2.730= 1.230 km, Diversion Khal of Dogona Hat Regulator from km 0.000 to km 0.200= 0.200 km, Shimultoli Khal From km 0.000 to km 2.200= 2.200 km and Kalibari Khal From km 0.000 to km 3.100= 3.100 km (in total 6.730 km) at Kathalia Upazilla in C/W Project Titled "To maintain normal water flow, retain water during dry season and improvement of Bhuboneshwar canal system under Bhandaria Upazila of Perojpur district" under Perojpur WD Division, BWDB, Perojpur during the Year 2024-25 & 2025-26.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Perojpur WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-03-09 11:10:00
Document last selling: 2025-03-23 17:00:00
Closing / Opening: 2025-03-24 12:10:00
Brief Description of Package: Re-excavation of Dogona Hat Khal from km 1.500 to km 2.730= 1.230 km, Diversion Khal of Dogona Hat Regulator from km 0.000 to km 0.200= 0.200 km, Shimultoli Khal From km 0.000 to km 2.200= 2.200 km and Kalibari Khal From km 0.000 to km 3.100= 3.100 km (in total 6.730 km) at Kathalia Upazilla in C/W Project Titled "To maintain normal water flow, retain water during dry season and improvement of Bhuboneshwar canal system under Bhandaria Upazila of Perojpur district" under Perojpur WD Division, BWDB, Perojpur during the Year 2024-25 & 2025-26.
Tender Document Price: Tk. 2000; Tender Security: 500000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 16666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 50000000 BDT.
Thus, Official Cost Estimate should be BDT. 16666666 ~ 20000000.

Eligibility criteria:
General Information:
i). Contractors who are registered on the e-GP web portal and fulfill the qualification criteria stated in the Tender Document.
ii). Contractors who are qualified as per PPR-2008 and its amendments and any other government rules applicable.
iii). The work may be dropped, quantity may be increased/ decreased. No claim for cancellation or extra rate for increased/ decreased quantity will be entertained.
iv). Payments of executed work will be made upon availability of funds. Any claim for the late payments will not be entertained. Quality & quantity of works shall be checked by BWDB Task Force Committee.
v). Quoted amount of tender beyond 10% above/less than official estimated cost will be non- responsive.
vi). After completion the tender opening process, if disable to downloading important documents of the tender, which consider to tender evaluation. In order to the tender may be treated as non-responsive.
Other Qualifications:
i). The minimum number of years of general experience of the Tenderer in the construction works shall be 05 years.
ii). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 contract(s) of similar nature, complexity and methods/construction technology (i.e. Excavation/Re-Excavation work .) successfully completed within the last 5 years.
iii). The required average annual construction turnover shall have the last 05 years.
iv). The minimum amount of liquid assets or working capital or credit facilities issuing date must be 14 days before of tender submission date. In case of Credit Certificate issuing from the bank, specific Tender ID Number, package Number & Name of the work must be shown in the certificate along with document of credit facilities.
 
Project: To maintain normal water flow, retain water during dry season and improvement of Bhuboneshwar canal system under Bhandaria Upazila of Perojpur district.
Location of work / delivery: Kathalia Upazilla
Budget Type: Development
Category: Engineering works and construction works; Works for complete or part construction and civil engineering work; Construction work for water projects; Engineering services; Architectural, engineering, construction and related technical consultancy services; Integrated engineering services;
PE Address: Rajarhat, Perojpur Pourosava, City: Perojpur, Thana: Pirojpur Sadar, District: Perojpur - 8500, Country: Bangladesh,


See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Perojpur WD Division; Bangladesh Water Development Board (BWDB)
:
1270671 : Peroj/NDR/2025-26/W-44 Construction of 1 No. New Pipe outlet in Polder No. 39/1B at Ghornoli Khal of Mathbaria Upazilla, Perojpur District under Perojpur WD Division, BWDB, Perojpur.
1260564 : Peroj/NDR/2025-26/W-43 Eviction Work of Illegal structure and Securing boundaries with barbed wire fencing at Bokshir Ghotichora Mouza of Mathbaria Pouroshova in Mathbaria Upazilla, Perojpur District under Perojpur WD Division, BWDB, Perojpur During the Year 2025-26.
1211613 : Peroj/NDR/2025-26/W-09 Resectioning work of existing FCDI embankment (North Side) from ch. km. 72.200 to ch. km. 72.500 = 300.00 m in Shariktala union, Perojpur sadar upazilla, Perojpur district under Perojpur WD division, BWDB, Perojpur during the FY2025-26.
1205060 : Peroj/RE/2024-25/W-06 Dismentaling work of Existing Bhuboneshwar Regulator (2V-1.50m.X1.80m.) at Bhandaria Upazilla in C/W Project Titled To maintain normal water flow, retain water during dry season and improvement of Bhuboneshwar canal system under Bhandaria Upazila of Perojpur district under Perojpur WD Division, BWDB, Perojpur during the Year 2024-25 & 2025-26.
1187543 : Peroj/NDR/Colony/2025-26/W-35 Construction of 50.00 meter boundary wall at Perojpur Sadar BWDB collony under Perojpur WD Division, BWDB, Perojpur during the FY2025-26.
1187524 : Peroj/NDR/2025-26/W-15 Resectioning work of existing FCDI Embankment (South Side) from ch. km. 12.400 to ch. km. 12.600 = 200.00 m in Chandipur union, Indurkani upazilla, Perojpur district under Perojpur WD division, BWDB, Perojpur during the FY2025-26.
Share on Twitter