eGP Tender ID: 1078301; Works (NCT)
APP ID: 208782;
District: Lalmonirhat
Reference No.: 42.01.5200.166.07.004.25-292; Date:19-2-2025
Package Title: Precautionary bank protection work along the left bank of teesta river from km. 54.700 to km. 55.000 = 300.00m to protect river bank erosion at goribullahpara area in up. Mohishkhocha, uz: aditmari, dist. Lalmonirhat under lalmonirhat wd division, bwdb, lalmonirhat during the year of 2024-2025.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Lalmonirhat WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-02-20 15:15:00
Document last selling: 2025-03-06 12:00:00
Closing / Opening: 2025-03-06 15:50:00
Brief Description of Package: Precautionary bank protection work along the left bank of teesta river from km. 54.700 to km. 55.000 = 300.00m to protect river bank erosion at goribullahpara area in up. Mohishkhocha, uz: aditmari, dist. Lalmonirhat under lalmonirhat wd division, bwdb, lalmonirhat during the year of 2024-2025.
Tender Document Price: Tk. 2000;
Tender Security: 470000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 15666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 47000000 BDT.
Thus, Official Cost Estimate should be BDT. 15666666 ~ 20000000.
Eligibility criteria:
Eligibility of Tenderer :
1. Any individual(s) firms who fulfill the qualification(s) criteria of each package as stipulated in the Tender Data Sheet (TDS) & other condition of the tender documents. 2. The Tenderers are requested to read carefully the instructions in section-2 (TDS) ; section-4 (PCC) & Section-8(Particular Specifications) & strictly follow the instructions.
Special Instruction:
1. Payment shall be made subject to budget allocation & availability of fund but the work must be continued and proportionate progress must be achieved.
2. Work certificate which is issued by the PE ( Procuring Entity) and executed by public fund will only be considered as an qualification criteria.
3. The tenderer has to arrange land or other establishment by his own for execution of work .
4. Test fee for the required test (as per direction of engineer in charge) conducted during / after the work to be paid by the contractor.
5. Before and after the execution of work videos and pictures have to be taken by the contractor on his own and submitted to the PE which representing the actual situation of work.
6. Taskforce measurement report, uploaded BWDB specification must be followed by the contractor.
7. Geobag rejected by the BWDB, Taskforce committee shall be dumped or placed without any additional payment
8. Tenderer(s) are informed to read carefully the instructions stated in ITT clauses no. 43 and its sub-clauses.
9. If any documents get corrupted and the evaluation team could not be able to open the file, no claim from the tenderer regarding the file will be entertained.
10. The work of the package may be totally dropped, decreased or increased as per field condition/design/administrative approval/budget allocation for which no claim will be entertained for cancellation of the tender/Issuance of work order
Location of work / delivery: Aditmari, Lalmonirhat
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Lalmonirhat, City: Lalmonirhat, Thana: Lalmonirhat Sadar, District: Lalmonirhat - 5500, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Lalmonirhat WD Division; Bangladesh Water Development Board (BWDB):
1202279 : LAL/Colony-06/2025-26
Repair works of Rest House & Employee Barracks in the Lalmonirhat BWDB Office Colony under Lalmonirhat WD Division, BWDB, Lalmonirhat during the FY 2025-2026.
1202278 : LAL/MISC-05/2025-26
Survey work on Teesta River for the implementation of pre-cautionary river bank protection work and Dalainama Lake & Saniajan River for the preparation of DPP under Lalmonirhat WD Division, BWDB, Lalmonirhat during the FY 2025-2026.
1202277 : LAL/MISC-04/2025-26
Eviction of illegal occupants, determine boundaries and install boundary pillars of the acquired land of BWDB under Lalmonirhat WD Division, BWDB, Lalmonirhat during the FY 2025-2026.
1202275 : LALMISC-03/2025-26
Demarcation of boundary and installation of boundary pillar works along the flood protective embankment at the right bank of Dharla river (18.00 km) under Lalmonirhat WD Division, BWDB, Lalmonirhat during the FY of 2025-2026.
1202273 : LAL/W-22/2025-26
Precautionary bank protection works along the right bank of Soti River from km 51.850 to km 52.000 = 150.00 m at Purbo Seknapara in up: Khuniagach; uz: Lalmonirhat Sadar; dist: Lalmonirhat under Lalmonirhat WD Division, BWDB, Lalmonirhat during the FY 2025-2026.
1202270 : LAL/W-20/2025-26
Strengthening works on the right bank of Dharla River from km 18.750 to km 19.135 = 385.00 m at Basuria in up: Borobari; uz: Lalmonirhat Sadar; dist: Lalmonirhat under Lalmonirhat WD Division, BWDB, Lalmonirhat during the FY 2025-2026.