Login |Register

LTM tenders of Natore district. | OSTETM tenders of Natore zilla. | OTM tenders of Natore. | View All the active tenders of Natore district.

eGP Tender ID: 1078160; Works (NCT)
APP ID: 203999; District: Natore
Package Title: Greasing of 5 nos hoisting devices of Beel halti-9 vents (2.38m x 3.27m) regulator of Challan Beel Project Polder-C including different mechanical repair work and wire rope change of 9 nos hoisting systems, Painting work of 9 Nos lift gate; Supply and installation of 3 nos new hoist including painting work of lift gate and replacement of rubber seal of Chaulkathi-3 Vent (2.40m x 1.70m) regulator of Challan Beel Project Polder-A under Natore Water Development Division during the FY: 2024-25.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Natore WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-02-26 10:00:00
Document last selling: 2025-03-12 15:00:00
Closing / Opening: 2025-03-13 11:05:00
Brief Description of Package: Greasing of 5 nos hoisting devices of Beel halti-9 vents (2.38m x 3.27m) regulator of Challan Beel Project Polder-C including different mechanical repair work and wire rope change of 9 nos hoisting systems, Painting work of 9 Nos lift gate; Supply and installation of 3 nos new hoist including painting work of lift gate and replacement of rubber seal of Chaulkathi-3 Vent (2.40m x 1.70m) regulator of Challan Beel Project Polder-A under Natore Water Development Division during the FY: 2024-25.
Tender Document Price: Tk. 1000; Tender Security: 30000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 1000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 3000000 BDT.
Thus, Official Cost Estimate should be BDT. 1000000 ~ 3000000.

Eligibility criteria:
Special Instructions:
01. Only e-GP registered Tenderer/Firms can participate to the Tender.
02. Tenderer should fulfill all criterias which are stated in TDS.
03. Tenderer should submit their credit line facility/Liquid assets certificate according to attached format (From PW2a-3, in section-7). Without credit line facility/Liquid assets certificate according to attached format tender declare a nonresponsive.
04. Payment will be made upon availability of fund and after Pre & Post work Measurement by BWDBs office & monitoring team .For this no claim will entertain.
05. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive.
06. After completion the tender opening process. If disable to download the important documents of the tender. Which consider to tender evaluation. In order to the tender may be treated as non-responsive.
07. The Tenderers will visit and examine the site with his own responsibility & expenses and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works.
08. Latest GoB circular on procurement of works will be applicable.
09. Evaluation will be done on the basis of the past performance Evaluation matrix. So, authenticated information along with documents will have to be incorporated with the tender. Planned & Actual start/commencement & completion date will have to clearly mentioned in the work certificate.
10. Arrangement of land for working area or site office (if any) need to be made by the tenderer and no claim in this regard will be entertained. Also the work will be completed by tenderer of his own management of site.
11. The authority reserves the right to accept or reject any/all tender(s) without showing any reason.
Location of work / delivery: Natore
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: Natore, City: Natore, Thana: Natore Sadar, District: Natore - 6400, Country: Bangladesh,


See more tenders from Natore WD Division; Bangladesh Water Development Board (BWDB):
1327119 : NAT/EW-10 Re-excavation of Barnai River from km 40.500 to km 42.00= 1.500 km in C/W " Re-Excavation, Pollution Mitigation and Eviction of Barnai River in Rajshahi & Natore District" in Natore District under Natore WD Division, BWDB, Natore.
1327118 : NAT/EW-09 Re-excavation of Barnai River from km 38.500 to km 40.500 = 2.000 km in C/W " Re-Excavation, Pollution Mitigation and Eviction of Barnai River in Rajshahi & Natore District" in Natore District under Natore WD Division, BWDB, Natore.
1327117 : NAT/EW-08 Re-excavation of Barnai River from km 36.700 to km 38.500 = 1.800 km in C/W " Re-Excavation, Pollution Mitigation and Eviction of Barnai River in Rajshahi & Natore District" in Natore District under Natore WD Division, BWDB, Natore.
1327116 : NAT/EW-07 Re-excavation of Barnai River from km 34.400 to km 36.700 = 2.300 km in C/W " Re-Excavation, Pollution Mitigation and Eviction of Barnai River in Rajshahi & Natore District" in Natore District under Natore WD Division, BWDB, Natore.
1327115 : NAT/EW-06 Re-excavation of Barnai River from km 32.400 to km 34.400 = 2.000 km in C/W " Re-Excavation, Pollution Mitigation and Eviction of Barnai River in Rajshahi & Natore District" in Natore District under Natore WD Division, BWDB, Natore.
1281356 : Barnai/25-26/Survey/NAT-02 Design Data Collection Survey from chainage km 32.00 to km 42.00 in C/W "Re-Excavation, Pollution Mitigation and Eviction of Barnai River in Rajshahi & Natore District" in Natore District under Natore WD Division, BWDB, Natore during the FY 2025-26
See live tender notices for lift.
Share on Twitter