eGP Tender ID: 1061400; Works (NCT)
APP ID: 209168;
District: Pabna
Reference No.: T-1/1150; Date: 27-01-2025
Package Title: Construction & Repair of 4 & 5 No turn out of I3S4 irrigation canal in between km 0.00 to km 1.820 under Bera WD Division during the FY 2024-2025.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Bera WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-01-27 22:00:00
Document last selling: 2025-02-11 18:00:00
Closing / Opening: 2025-02-12 12:20:00
Brief Description of Package: BNDR/OTM/W-10/2024-25
Construction & Repair of 4 & 5 No turn out of I3S4 irrigation canal in between km 0.00 to km 1.820 under Bera WD Division during the FY 2024-2025.
Tender Document Price: Tk. 1000;
Tender Security: 5000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 1000, estimated cost should be less than or equal 50 lacs BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 166666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 500000 BDT.
Thus, Official Cost Estimate should be BDT. 166666 ~ 500000.
Eligibility criteria:
a) Contractors who are registered on e-GP web-portal and fulfill the qualification criteria stated in the tender document.
b) Any individual (s) firm who fulfill the qualifications of the criteria stipulated in the tender data sheet (TDS) and other conditions of the Tender Document for Open Tendering Method (OTM).
c) If the quoted amount by tenderer more than the 10% above or less than the 10% below than the official estimated cost, the submitted tender will be treated as non-responsive.
d) The Provisions laid down in the "Public Procurement Regulation 2008 "(Ammended-2009) for procurement of works will be binding upon the contractors.
e) The work may be totally dropped, Quantity may be increased or decreased; No claim or extra rate will be entertained against cancellation of the tender or issuance of work order with decreased quantity of work.
f) Payment will be made subject to the availability of fund. No claim for extra payment will be entertained for delay of payment.
g) For line of Credit from any scheduled Bank of Bangladesh all the bidders must submit an unconditional assurance certificate following the standard format (Form PW2a-3) without alteration. Otherwise Tender will not be considered as responsive. Form PW2a-3 has been attached in Section 7 (General Specification) or may downloaded from CPTU website.
Special Instruction:
A misrepresentation or omission regarding the value of existing commitments and ongoing works by a tenderer in the E-GP system constitutes a fraudulent practice under ITT Clause Corrupt, Fraudulent, Collusive, Coercive or Obstructive Practices. In that case, the tenderer will be nonresponsive, and further action may be taken in accordance with PPR 127 and ITT Clause Corrupt, Fraudulent, Collusive, Coercive or Obstructive Practices.”
Location of work / delivery: Bera, Pabna
Budget Type: Revenue
Category: Construction work for water projects; Works for complete or part construction and civil engineering work;
PE Address: BWDB, Bera, Pabna., City: Bera, Thana: Bera, District: Pabna - 6680, Country: Bangladesh,
See more tenders from
Notice: Undefined index: PEID in /home/dorpatra/public_html/getEGPNotice.php on line 197
Bera WD Division; Bangladesh Water Development Board (BWDB):
1200975 : BNDR/OTM/W-13/2025-26
Repair/Strengthening of slope Protection work of Flood Control Embankment from km 100.200 to km 100.250 = 0.050 km at Choira in Upazila Shahjadpur District Sirajganj under Bera WD Division, BWDB, Bera, Pabna during the FY-2025-2026.
1200974 : BNDR/OTM/W-12/2025-26
Silt removing works of Bera Pumping Station Intake Channel from km. 0.200 to km. 0.250 = 50.00 m including NDR budget under Bera WD Division, BWDB, Bera, Pabna during the FY: 2025-2026.
1200973 : BNDR/OTM/W-11/2025-26
Precautionary Work On The Left Bank Of The Padma River 76.00 Meter In between K.M. 4.700 to K.M. 4.930 at Naruhati under Sujanagar Upazila of Pabna District During The FY 2025-2026.
1186296 : BNDR/OTM/W-09/2025-2026
Re-excavation works of khal in length of 1500.00m with construction a inlet for removing deposited water on irrigation land of paina, tehri and Jagannathpur village adjacent to I3S1T1 irrigation canal in connection with PIRDP under Bera WD Division, BWDB, Bera, Pabna during the FY: 2025-2026.
1186295 : BNDR/OTM/W-08/2025-2026
Dyke resectioning work, height increasing work of the dyke, brick work along the toe of dyke and HBB work of top surface of the dyke of I-3 S-1 T-1 irrigation canal from km. 0.690 to km. 1.580 = 890.00m in connection with PIRDP under Bera WD Division, BWDB, Bera, Pabna during the FY: 2025-2026.
1107283 : BNDR/OTM/W-20
Precautionary protective work along the left bank of Jamuna river (Nagarbari Channel) from km. 0.130 to km. 0.238 = 108.00 m at Kollanpur of Puran Varenga union at Bera upazila in Pabna district under Bera WD Division, BWDB, Bera, Pabna during the FY: 2024-2025.