eGP Tender ID: 1053338; Works (NCT)
APP ID: 206642; District: Dhaka
Reference No.: T-1 979 Dated-18-12-2024
Package Title: Precautionary bank Protective work at Ashrayan project to Gaodia along the left bank of the Padma river from km. 18.365 to km. 18.945 Total 580.00 m in Louhojong Upazila of Munshiganj District under Munshiganj WD Division, BWDB, Munshiganj during the Year 2024-25.
Organization: Bangladesh Water Development Board (BWDB)
Procuring Entity: Munshiganj WD Division
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-12-22 08:10:00
Document last selling: 2025-01-19 17:00:00
Closing / Opening: 2025-01-20 14:00:00
Brief Description of Package: PW_23/2024-25
Precautionary bank Protective work at Ashrayan project to Gaodia along the left bank of the Padma river from km. 18.365 to km. 18.945 Total 580.00 m in Louhojong Upazila of Munshiganj District under Munshiganj WD Division, BWDB, Munshiganj during the Year 2024-25.
Tender Document Price: Tk. 4000; Tender Security: 1500000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 50000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 150000000 BDT.
Thus, Official Cost Estimate should be BDT. 50000000 ~ 150000000.

Eligibility criteria:
"1. Tenderer must be registered on e-GP Portal with a valid trade license, TIN
 certificate.
 2. Tenderer must submit similar nature work certificate, annual construction
 turnover
 certificate and liquid assets certificate.
3. Payment wil be made based on the budged and availability of fund.
 4. Any individual Tender/Bangladeshi Tenderer(s)/firm (s) who fulfil the
 qualification(s)
 criteria stipulated in the Tender Document PPA-2006 and PPR-2008.
 5.Tenderer must submit line of credit certificate in PW3-7 prescribed format
 which is to be
 uploaded in section 7.
 6. If the amount quoted by tenderer is more than 10% above or less than 10%
 below than
 the official estimated cost, the submitted tender wil be treated as non
responsive.
 7. The Tender must comply with the instructions/office orders/circulars issued
 by BWDB in
 connection with Protective Work.
 8. Al the information, clarification and documents submitted by the tenderer
 must comply
 with declaration given.
 9. Tenderer shal own or have proven access to hire or lease of the major
 construction
 equipments, in ful working order (required documents must be submitted).
 10. Contractor wil arrange land (if needed) by his own initiative for
 implementing the work."
 
Project: Bank Protective Work along the Left Bank of Padma River down of Padma Multipurpose Bridge at Louhajong and Tongibari Upazila in Munshigonj District
Location of work / delivery: Upazila-Louhajong Dist- Munshiganj
Budget Type: Development
Category: Works for complete or part construction and civil engineering work; Construction work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works
PE Address: WAPDA Bhaban (7th Floor), Motijheel C/A, City: Dhaka, Thana: Dhaka South City Corporation, District: Dhaka - 1000, Country: Bangladesh,


See more tenders from Munshiganj WD Division; Bangladesh Water Development Board (BWDB):
1279573 : Mun/NDR-07/2025-26 Supplying, Filling and Dumping of Geo-bags (250 Kg) at different vulnerable places of District-Munshiganj for emergency flood mitigation in c/w NDR budget under Munshiganj WD Division, BWDB, Munshiganj.
1268694 : Mun/CCTF/Rajat/W-01 Re-Excavation of Rajat Rekha River from km. 0.000 to km. 2.920= 2.920 km to reduce the impact of climate change in connection with ''Re-excavation, Beautification and Environmental conservation work of Rajat Rekha River in between Munshiganj Sadar & Tongibari Upazila of Munshiganj District to mitigate the climate change effects Project under CCTF at Munshiganj WD Division, BWDB, Munshiganj during the FY 2025-26.
1254291 : Munshi RE/Bhagykul/W-01 Re-Excavation of Bhagyakul Khal from Km 1.455 to km 4.675 = 3.22 Km at Sreenagar Upazila, District in Munshiganj under Munshiganj Water Development Division, BWDB, Munshiganj.
1254289 : Munshi RE/Ardhipara/W-14 Re-excavation of Ardhipara Khal in between Km 0.00 to Km 6.80 = 6.80 Km at Sreenagar Upazila, District in Munshiganj under Munshiganj Water Development Division, BWDB, Munshiganj.
1254287 : Munshi RE/Sreenagar/W-10 Re-excavation of Sreenagar Khal from Km 0.00 to Km 20.00 = 20.00 km at Sreenagar Upazila, District in Munshiganj under Munshiganj Water Development Division, BWDB, Munshiganj.
Share on Twitter