eGP Tender ID: 1016261; Works (NCT)
APP ID: 202347;
District: Khulna
Reference No.: APP ID : 202347
Package Title: Upgrading of Bastohara Intersection to City Biypass Road up to Ramjan's Bridge (Ch+0+00-1+460km) Section-1: General & Site Facilities, Section-2: Earth Work , Section-3: Pavement and Surfacing Works , Section-4: Drainage Structure Works , Section-5: Environmental and Safety Works & Section-6: Double Street Light .
Organization: Khulna City Corporation
Procuring Entity: Executive Engineer Zone A
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-09-18 14:45:00
Document last selling: 2024-10-16 17:00:00
Closing / Opening: 2024-10-17 12:00:00
Brief Description of Package: LGCRRP/KHULNA/2023-24/W -18
Upgrading of Bastohara Intersection to City Biypass Road up to Ramjan's Bridge (Ch+0+00-1+460km) Section-1: General & Site Facilities, Section-2: Earth Work , Section-3: Pavement and Surfacing Works , Section-4: Drainage Structure Works , Section-5: Environmental and Safety Works & Section-6: Double Street Light .
Tender Document Price: Tk. 4000;
Tender Security: 6500000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 216666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 650000000 BDT.
Thus, Official Cost Estimate should be BDT. 216666666 ~ 650000000.
Eligibility criteria:
As per TDS and ITT
1. Similar nature of work : TK 17,27,00,000.00
2. Average annual construction turnover : TK 37,01,00,000.00 ( Over the Best 3 Years in the Last 5 Years )
3. Liquid assets or working capital TK : 6,16,00,000.00
4. Tender Capacity : 19,74,00,000.00
5. Payment will be made upon availability of fund. For this no claim will be entertained.
6. VAT & IT from bill will be as per prevailling Government Rate. No extra claim will be entertained in this regard.
7. To ensure the Quality of the material, Various test shall be performed by the tenderer as per instruction.
Project: Local Government Covid-19 Response & Recovery Project (Khulna City Corporation)
Location of work / delivery: Khulna City Corporation
Budget Type: Development
Development Partner: World Bank
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: 28 KD GHOSH ROAD, City: Khulna, Thana: Khulna City Corporation, District: Khulna - 9100, Country: Bangladesh,
See more tenders from
Executive Engineer Zone A; Khulna City Corporation:
1120623 : KCC/IDSRWLP/XEN/Zone-A/2024-25/W-14
Construction of Drains Beside North Khal Bank Road ( Sher-e-Bangla Road to Hazi Ismail Road Drain) Left side drain Ch. 0+000 km to ch. 0+820 km & Right side drain Ch. 0+000 km to ch. 0+820 km ;Basupara Main Road Ch. 0+370-0+567 Total Drain Length= 1.824 km under Improvement of Drainage System for Reducing Water Logging Problem in Khulna City Corporation [Phase-1]
1120611 : KCC/KWASA/XEN-Civil/Zone-A/2024-25/W-32
Repair of (a ) Nirala Nirjon Road With RCC Drain ,( B) Kasem Nagor 1 No Road by Lane ( M A Goffar Lane 1 & 2) (C) Nirala 5 No Road by Lane ( Sobhan Lane ) ( D ) Bagmara Main Road by Lane ( Jafor Lane ) With Brick Drain & ( E ) Prantika 8 No Road , With Rcc Drain,, Road Length = 482 M,
1114860 : KCC/KWASA/XEN-Civil/Zone-A/2024-25/W-30
Boyra Cross Road-1 Partly & Bylane's Damaged Parts Repaired by KWASA. Ward No-17
1114773 : KCC/KWASA/XEN-Civil/Zone-A/2024-25/W-29
Estimate for Repair Various Road Excavated by KWASA, 15.Khatrakhali puro khalpar rd.by lane 1,2,3 ,16.Khan bahadur sarak by lane-3 & 4 ,17.Khan bahadur sarak by lane-5 ,18.Khan bahadur sarak by lane-6(Tangil) ,19.Khan bahadur sarak by lane-7 no goli ,20.Khan bahadur sarak by lane-8 no goli Ward No-31
1114689 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-38
Construction of Drain including slab from Muzgunni highway road KDA park to Khude Khal. drain: from Ch. 0+000 km to Ch. 1+776 km, Total Drain Length=1.776 km, DPP-CS 8
1114679 : KCC/IDSRWLP/XEN/Zone-A/2024-25/W-13
Construction of Drain at Suri Khal (from Mistri Para Khal to Dhunai Ali Bridge); Ward: 27 (DPP-153) From Ch. 0+405 km to Ch. 1+010 km, Ch. 0+000 km to-Ch. 0+065 km; Total Drain Length = 0.670 km