Login |Register


eGP Tender ID: 1013105; Works (NCT)

Reference No.: APP ID : 196990
Package Title: KCC/ADP/XEN-Civil/Zone-A/2023-24/W-05Repair of Pothol at M.A Bari Sarak Link Road ( Sonadanga bus Stand to Moyur Bridge)
PE & Organization: Ministry of Local Government, Rural Development and Co-operatives,Local Government Division,Khulna City Corporation,Executive Engineer Zone A
Procurement Method: LTM
IFT Published on: 2024-09-04 11:56:00
Closing / Opening: 2024-09-19 12:00:00


See more tenders from Ministry of Local Government, Rural Development and Co-operatives,Local Government Division,Khulna City Corporation,Executive Engineer Zone A:
1001772 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-31 Construction of Drain at North Khal, Bank. From Sher-e-Bangla Road to Meto Pole Drain, from Ch. 0+000 km to Ch. 1+935 km Total Drain Length = 1.935 km, DPP-148, Ward-26.
1001762 : LGCRRP/KHULNA/2023-24/W-18 Upgrading of Talukder Abdul Khaleq Road (Bastohara Intersection to City Biypass Road up to Ramjan's Bridge) (Ch+0+00-1+460km) Section-1: General & Site Facilities Upgrading of Talukder Abdul Khaleq Road (Bastohara Intersection to City Biypass Road up to Ramjan's Bridge) (Ch+0+00-1+460km) Section-2: Earth Work Upgrading of Talukder Abdul Khaleq Road (Bastohara Intersection to City Biypass Road up to Ramjan's Bridge) (Ch+0+00-1+460km) Section-3: Pavement and Surfacing Works Upgrading of Talukder Abdul Khaleq Road (Bastohara Intersection to City Biypass Road up to Ramjan's Bridge) (Ch+0+00-1+460km) Section-4: Drainage Structure Works Upgrading of Talukder Abdul Khaleq Road (Bastohara Intersection to City Biypass Road up to Ramjan's Bridge) (Ch+0+00-1+460km) Section-5: Environmental and Safety Works Upgrading of Talukder Abdul Khaleq Road (Bastohara Intersection to City Biypass Road up to Ramjan's Bridge) (Ch+0+00-1+460km) Section-6: Double Street Light
1001737 : LGCRRP/KHULNA/2023-24/W-19 Upgrading of Talukder Abdul Khaleq Road By Lane's (3 Nos) Ch. 00-130.00m
972032 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-22 Construction of RCC Drain with Footpath Single Side 16 NO. Road Ward 11, DPP No - 45; Right side Drain- From Ch. 0 + 000 km to Ch. 1+769km and Left Side Drain- From Ch. 0+000km to Ch. 1+769 km, Total Drain Length = 3.194 km For Construction: Left side Drain- from Ch. 0 + 000 km to Ch. 0+942 km and Left side Ch. +130km to Ch.1+230 and Right side Drain- From Ch. 0 + 942 km to Ch. 1+769km Total Drain Length= 1.914 km
970428 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-21 Construction of 3 No. Sluice Gate and Outlet RCC drain at Rupsha Bheribadh Road.
968658 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-13 1. (24775-23-10001) Part 1 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m) under Khulna City Corporation (Phase-1) 2. (24775-24-10001) Part 2 :Approach Road of Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m) under Khulna City Corporation (Phase-1) 3. (24775-23-10002) Part 3 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m)L.Control room part 4. (24775-24-10002) Part 4 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m) L.Electric part. 5. (24775-24-10003) Part 5 : Labonchara 1no. Regulator (4 Vents -1.50 m X 1.80 m).Automation part.
See live tender notices for bridge.
Share on Twitter