দরপত্র নং: ১,২৫৪,৭৫৪; কার্য (NCT)
শিরোনাম: River Morphological Survey work at Lower Salta River (Length 8.300km.) in C/W Revitalization, Pollution-free and Eviction of Encroachment of Salta River in Khulna District under Khulna Water Development Division-1, BWDB, Khulna.
সংস্থা: Ministry of Water Resources,Bangladesh Water Development Board (BWDB),Khulna WD Division-1
পদ্ধতি: RFQU
প্রকাশের তারিখ: ২০২৬-০৪-০৯ ১২:০০:০০
খোলার সময়: ২০২৬-০৪-১৩ ১৬:১৫:০০
Ministry of Water Resources,Bangladesh Water Development Board (BWDB),Khulna WD Division-1 এর আরও দরপত্র দেখুন:
১,২৪২,০৯৪ : Khulna-1/Sol/2025-26/W-03
Re-excavation of Lower Shoilmari River from km. 5.000 to km. 7.000=2.000 km. in Batiaghata Upazila, Dist:- Khulna in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna during the year 2025-26.
১,২৪২,০৯৩ : Khulna-1/Sol/2025-26/W-02
Re-excavation of Lower Shoilmari River from km. 3.000 to km. 5.000 = 2.000 km. in Batiaghata Upazila, Dist:- Khulna in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna.
১,২৪২,০৯২ : Khulna-1/Sol/2025-26/W-05
Re-excavation of Ramdia khal from km. 0.000 to Km. 4.500=4.500km in Batiaghata Upazila, Dist:- Khulna in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna during the year 2025-26.
১,২৪২,০৯১ : Khulna-1/Sol/2025-26/G-05
Supply, Installation & Commissioning of 5 Nos (3nos for Ramdia & 2nos for Shoilmari ) (35Cusec capacity each) submersible axial flow propeller water pump at upstream of Ramdia (9-vent) & Shoilmari (10-vent) of Khulna district along with construction of necessary civil & electrical works in c/w Reducing water logging in Beel and residential area adjacent to the Sholmari river in Dumuria and Batiaghata upazila of Khulna District under Khulna WD Division-1, BWDB, Khulna during the year 2025-26.
১,২০৫,৭২৪ : Khulna-1/Salta/2025-2/W-09
Repair work of Bakultola Regulator in connection with the project Re-excavation of Salta River for mitigation of pollution, eviction of illegal Structures & Rejuvenation of Salta River under Khulna District under Khulna Water Development Division-1, BWDB, Khulna.
১,২০৫,৩৮৭ : Khulna-1/Salta/2025-2/W-03
Re-excavation of Tiabunia Khal from Km.0.000 to Km. 1.700 = 1.700 Km. in connection with the project Re-excavation of Salta River for mitigation of pollution, eviction of illegal Structures & Rejuvenation of Salta River under Khulna District under Khulna Water Development Division-1, BWDB, Khulna.