Login |Register

LTM tenders of Feni district. | OSTETM tenders of Feni zilla. | OTM tenders of Feni. | View All the active tenders of Feni district.

eGP Tender ID: 697037; Goods (NCT)
APP ID: 176797; District: Feni
Package Title: Supply Of Electric Goods
Organization: Feni Paurashava
Procuring Entity: Office of the Feni Pourashava, Feni
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2022-06-09 16:00:00
Document last selling: 2022-06-27 17:00:00
Closing / Opening: 2022-06-28 13:00:00
Brief Description of Package: Rev/FP/2021-22/32.
Supply Of Electric Goods
Tender Document Price: Tk. 500; Tender Security: 100000 BDT
Official Cost Estimate (Prediction):
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 3333333.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 10000000 BDT.
Thus, Official Cost Estimate should be BDT. 3333333 ~ 10000000.

Eligibility criteria:
AS PER TDS
Location of work / delivery: Feni Pourashava
Budget Type: Revenue
Category: Insulated wire and cable; Electrical machinery, apparatus, equipment and consumables; Mains; Power distribution cables; Coaxial cable; Insulated cable accessories; Electric conductors for data and control purposes
PE Address: College Road, Feni Sadar, Feni., City: Feni, Thana: Feni Sadar, District: Feni - 3900, Country: Bangladesh,


See more tenders from Office of the Feni Pourashava, Feni; Feni Paurashava:
841580 : LGCRRP/Feni/2022-23/W-05 A) Improvement of Baitul Nazat Jame Mosque Road (Azmery Begum Road Bylane), Ch. 0.00m to 140.00m by bituminous dense carpeting at ward no.-08 under Feni Pourashava, District-Feni. B) Construction of RCC Drain at Baitul Nazat Jame Mosque Road side (Azmery Begum Road Bylane), Ch. 0.00m to 160.00m at Ward No.-08 under Feni Pourashava, District-Feni.
792974 : LGCRRP/Feni/2022-23/W-04 Part-01 : A) Construction of RCC Road Work in Falahia Madrasha Road.(Start from Feni-Comilla Trunk Road to Falahia Madrasha) Ch-0.00m to 155.00m at W#11.Under Feni Pourashava. B) Construction of RCC drain With Slab Work in Falahia Madrasha Road.(Start from Feni-Comilla Trunk Road to Falahia Madrasha) Ch-0.00m to 155.00m at W#11.Under Feni Pourashava. Part-02 : A) Improvement of DC Road Work in South Charipur Hazi Badsha Miah Bari Road. (Start from Shanti Company Road to Badsha Miah Zame Mosque) Ch-0.00m to 140.00m at W#12 Under Feni Pourashava. B) Construction of RCC drain With Slab Work in South Charipur Hazi Badsha Miah Bari Road.(Start from Shanti Company Road to Badsha Miah Zame Mosque) Ch-0.00m to 140.00m at W#12 Under Feni Pourashava. Part-03 : A) Improvement of Road Work in Middle Rampur Boktiyar Bhuiyan Road.(Start from Abid Munshi Road to Takia Road) Ch-0.00m to 300.00m at Ward no-18.Under Feni Pourashava. B) Improvement of Road Work in Middle Rampur Amin Uddin Road.(Start from Rampur Bhuiyan Bari Road to Rampur Hazari Road) Ch-0.00m to 245.00m at Ward no-18.Under Feni Pourashava.
792973 : LGCRRP/Feni/2022-23/W-03 Part-01: A) Construction of RCC Road Work in Muksadur Rahman Road by lane (Bhuiyan bari Road).(Start from Muksadur Rahman Road to End side Road) Ch-0.00m to 150.00m at W#11.Under Feni Pourashava. B) Construction of RCC drain With Slab Work in Muksadur Rahman Road by lane (Bhuiyan bari Road).(Start from Muksadur Rahman Road to End side Road) Ch-0.00m to 150.00m at W#11.Under Feni Pourashava. C) Construction of Existing RCC drain Top Slab Work in Middle Rampur Foyez Pathowary Road ( Behind of Shain Acadmy Road).(Start from Existing Foyez Pathowary Road to Shain Acadmy Road) Length 0.00m to 380.00m Total Length=380.00m at Ward no-16.Under Feni Pourashava. Part-02 : A) Construction of RCC Road Work in East Bijoysing Raza Miyar Bari Road (Kutirhat Road by lane).(Start from Kutirhat Road to Kutirhat Road) at Ward no-13.Ch-0.00m to 185.00m Total Length=185.00m Under Feni Pourashava. (B) Construction of RCC drain With Top Slab Work in East Bijoysing Raza Miyar Bari Road (Kutirhat Road by lane).(Start from Kutirhat Road to Kutirhat Road) at Ward no-13.Ch-0.00m to 120.00m.Total Length=120.00m Under Feni Pourashava. Part-03 : A) Construction of RCC Road and Existing drain Slab Work in South Modhupur Ali Ahammad Pondit Bari Road.(Start from Malek Miah Bazar Road to Pondit Bari Pond Ghatla) Ch-0.00m to 160.00m at Ward no-14.Under Feni Pourashava. B) Construction of RCC Road Work in Middle Modhupur Jamal Uddin Munshi Bari Road.(Start from Khirod Shah Road to Munshi Bari Pond Ghatla) Ch-0.00m to 225.00m at Ward no-15.Under Feni Pourashava.
792972 : LGCRRP/Feni/2022-23/W-02 Part-01: Construction of RCC Road at (i) Birinchi Zinnat Ali Mozumder Bari Road, Ch. 0.00m to 120.00m & Link-1: Ch. 0.00m to 35.00m and (ii) Birinchi Hazi Bari Road, Ch. 0.00m to 160.00m, Total Length = 315.00m at Ward No.04 under Feni Pourashava, District- Feni. Part-02: Improvement of Birinchi Atiqul Alam Road (Academy Road to Hunger), Ch. 0.00m to 600.00m, Link-1: Birinchi Madrasa Road (Atiqul Alam Road to Sufia Nuria Madrasa), Ch. 0.00m to 250.00, Total Length = 850.00m by Bituminous dense carpeting at Ward No.-05 under Feni Pourashava. Part-03: Improvement of Hazi Fazal Master Lane (College Road to Mizan Road) by bituminous dense carpeting, Ch. 0.00m to 400.00m, Total Length = 400.00m, at Ward No.-09 under Feni Pourashava, District-Feni.
792971 : LGCRRP/Feni/2022-23/W-01 Part -01: A) Construction of RCC Road at Petro Bangla Road bylane (i) Station Master Bari Road, Ch. 0.00m to 120.00m, (ii) Nath Bari Road (South side), Ch. 0.00m to 100.00m,Total Length = 220.00m at Ward No.01 under Feni Pourashava, District- Feni. B) Construction of RCC Drain at Petro Bangla Road bylane side (i) Station Master Bari Road, Ch. 0.00m to 120.00m, (ii) Nath Bari Road (South side), Ch. 0.00m to 100.00m,Total Length = 220.00m at Ward No.01 under Feni Pourashava. Part-02: A) Construction of RCC Road at Sahadebpur Guru Mondir (Sadon Babu) Road, Ch. 0.00m to 240.00m, Total Length = 240.00m, Ward no.- 02 under Feni Pourashava. B) Construction of RCC Drain at Sahadebpur Guru Mondir (Sadon Babu) Road, Ch. 0.00m to 240.00m, Total Length = 240.00m, Ward no.- 02 under Feni Pourashava. Part-03: A) Construction of RCC Road at Sahadebpur Notunpara Hosne Ara Road, Ch. 0.00m to 105.00m, Link-1: Ch. 0.00m to 25.00m and Link-2: Ansar Ali Hazari Bari Road, Ch. 0.00m to 50.00m, Total Length = 180.00m at Ward No.-03 under Feni Pourashva. B) Construction of RCC Drain and 01 No. Cross Drain at Sahadebpur Notunpara Hosne Ara Road, Ch. 0.00m to 105.00m, Link-1: Ch. 0.00m to 25.00, Total Length = 130.00m at Ward No.-03 under Feni Pourashva.
732335 : BCCT/FP/22-23/01 Installation of Solar Street Light in Feni Municipal Aria to Reduce Green House Gas Emission.
Share on Twitter