eGP Tender ID: 1116652; Works (NCT)
APP ID: 204694;
District: Chattogram
Reference No.: xenpne/east/e-tender/24-25/75
Package Title: At BG/MG Section: Riveting, Strengthening, Supply of Center Pivot of Turntable including Supplying, fitting, fixing of Wheel axle at Dhaka Yard including construction of RCC foundation for Pivot, Walk-way, Buffer Stop & soak well as per approved typical Plan with other ancillary works near Loco shed.
Organization: Bangladesh Railway
Procuring Entity: Office of the Chief Engineer (East), Chittagong
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2025-05-22 17:00:00
Document last selling: 2025-06-15 17:00:00
Closing / Opening: 2025-06-16 12:00:00
Brief Description of Package: At BG/MG Section: Riveting, Strengthening, Supply of Center Pivot of Turntable including Supplying, fitting, fixing of Wheel axle at Dhaka Yard including construction of RCC foundation for Pivot, Walk-way, Buffer Stop & soak well as per approved typical Plan with other ancillary works near Loco shed.
Tender Document Price: Tk. 2000;
Tender Security: 350000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 2000, estimated cost should be more than 50 lacs BDT, but less than or equal 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 11666666.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 35000000 BDT.
Thus, Official Cost Estimate should be BDT. 11666666 ~ 20000000.
Eligibility criteria:
As stated in the tender document.
Location of work / delivery: At DA station Yard
Budget Type: Revenue
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: CRB, Chittagong, City: Chittagong, Thana: Chattogram City Corporation, District: Chattogram - 4000, Country: Bangladesh,
See more tenders from
Office of the Chief Engineer (East), Chittagong; Bangladesh Railway:
1278207 : DA-1.501/13/25-26/KA-2
At SSAE/Works/JLX section : Construction of Bank Protection wall by rail piling at km 434/2-6 TKND-AMRT section and at km 436/8-9 in between SHTL-JUJB section as per drawing.
1278114 : BE-111/07/25-26/KA-5
At BCI-AVY Section: Repairing & repainting of steel girder bridges no. 1, 2, 2-A, 3 ,4, 5, 6, 7, 9, 10, 12, 14, 15, 19, 20 ,22, 22-C, 23, 27, 33, 35-A, 41, 44, 45-A, 46, 48, 49, 52-A Total 28 nos. with other allied works.
1278046 : BE-308/06/25-26/KA-5
At Tigerpass Railway area: Sinking and installation of 01 no. deep Tube well including construction of pump house with toilet and septic tank (10 users) and laying necessary pipe line on turnkey basis.
1277049 : DA-1.307/12/25-26/KA-2
At SSAE/Works/KYTO Section : Construction of yard drain at Gaforgaon end side of Fatemanagar (FMN) station yard for removal water of heavy rainfall and other ancillary works as per drawing.
1276870 : DA-1.307/11/25-26/KA-2
At SSAE/Works/KYTO Section : Re-construction of yard drain at Gofargaon (GFN) station yard as per drawing.
1276775 : DA-1.502/10/25-26/KA-2
At SSAE/Works/JLX Section : Raising & Extension of platform from existing level to equal 1'-6'' height from rail top by RCC works at Payerpur (PYP) station as per drawing.