LTM tenders of Khulna district. |
OSTETM tenders of Khulna zilla. |
OTM tenders of Khulna. |
View All the active tenders of Khulna district.
eGP Tender ID: 1018569; Works (NCT)
APP ID: 196050;
District: Khulna
Reference No.: APP ID : 196050
Package Title: Construction of Drain including slab from Muzgunni highway road KDA park to Khude Khal. drain: from Ch. 0+000 km to Ch. 1+776 km, Total Drain Length=1.776 km, DPP-CS 8
Organization: Khulna City Corporation
Procuring Entity: Executive Engineer Zone A
Procurement Method: Open Tendering Method (OTM)
IFT Published on: 2024-09-26 12:27:00
Document last selling: 2024-10-27 17:00:00
Closing / Opening: 2024-10-28 12:00:00
Brief Description of Package: KCC/IDSRWLP/XEN/Zone-A/2023-24/W-38
Construction of Drain including slab from Muzgunni highway road KDA park to Khude Khal. drain: from Ch. 0+000 km to Ch. 1+776 km, Total Drain Length=1.776 km, DPP-CS 8
Tender Document Price: Tk. 4000;
Tender Security: 4200000 BDT
Official Cost Estimate (Prediction):
* Since document price is Tk. 4000, estimated cost should be more than 2 crore BDT.
* Tender Security can be maximum 3% of Official Cost Estimate. So estimated cost is more than Tk. 140000000.
* Tender Security is normally more than 1% of Official Cost Estimate. So estimated cost should be less than 420000000 BDT.
Thus, Official Cost Estimate should be BDT. 140000000 ~ 420000000.
Eligibility criteria:
As per TDS and ITT
1. Similar nature of work : TK 8,28,00,000.00
2. Average annual construction turnover : TK 33,00,00,000.00 ( Over the Best 3 Years in the Last 5 Years )
3. Liquid assets or working capital TK : 8,28,00,000.00
4. Tender Capacity : 12,42,00,000.00
5. Payment will be made upon availability of fund. For this no claim will be entertained.
6. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive.
7. VAT & IT from bill will be as per prevailling Government Rate. No extra claim will be entertained in this regard.
8. To ensure the Quality of the material, Various test shall be performed by the tenderer as per instruction.
Project: Imrovement of Drainage System for reducing Water Logging Problem in Khulna City Corporation
Location of work / delivery: Khulna City Corporation
Budget Type: Development
Category: Construction work; Site preparation work; Building demolition and wrecking work and earthmoving work; Test drilling and boring work; Works for complete or part construction and civil engineering work; Building construction work; Engineering works and construction works; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; Construction work for water projects; Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry; Roof works and other special trade construction works; Building installation work; Electrical installation work; Insulation work; Plumbing and sanitary works; Fencing, railing and safety equipment installation work; Mechanical installations; Building completion work; Plastering work; Joinery and carpentry installation work; Floor and wall covering work; Painting and glazing work; Other building completion work; Hire of construction and civil engineering machinery and equipment with operator; Hire of cranes with operator; Hire of earthmoving equipment with operator
PE Address: 28 KD GHOSH ROAD, City: Khulna, Thana: Khulna City Corporation, District: Khulna - 9100, Country: Bangladesh,
See more tenders from
Executive Engineer Zone A; Khulna City Corporation:
1018574 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-28
Construction of Mojid Saroni Road Drains with Footpath; Ward no: 17, 18 (Both sides Drain and Footpath/Walkway: Total Drain Length= 2.428 km; Left Side Drain: from Ch. 0 + 000 km to Ch. 1+214 km Right Side Drain: from Ch. 0+000 km to Ch. 1+214 km) And Sonadanga R/A in 1st Phase Right side drain Ch. 0+000 to Ch. 0+758 km & Extra Ch. 0+000 to 0+048 km. Total Length=0.806
1018172 : LGCRRP/KHULNA/2023-24/W-20
Repair & Maintenance of Khalispur 16 no road with drain. Ch 00+930m (Ward no-12) Section-01 (Environmental Management Plan) , Repair & Maintenance of Khalispur 16 no road with drain. Ch00+930m (Ward no-12) Section-03 (Pavement & Surfacing Work) & Repair & Maintenance of Khalispur 16 no road with drain. Ch00+930m. RCC Drain 300m. (Ward no-12 Section-04 (Drainage Structure Work) .
1018128 : KCC/IDSRWLP/XEN/Zone-A/2023-24/W-37
Construction of Drain beside Karimnagar Covered Road ( From Boyra main road to mujgunni highway road) left side drain: from Ch. 0+000 km to Ch. 0+200km & Right side drain: from Ch. 0+000 km to Ch. 0+607 km Total drain length=0.607 km.
1016261 : LGCRRP/KHULNA/2023-24/W -18
Upgrading of Bastohara Intersection to City Biypass Road up to Ramjan's Bridge (Ch+0+00-1+460km) Section-1: General & Site Facilities, Section-2: Earth Work , Section-3: Pavement and Surfacing Works , Section-4: Drainage Structure Works , Section-5: Environmental and Safety Works & Section-6: Double Street Light .
1015899 : LGCRRP/KHULNA/2023-24/W -19
Upgrading of 3 Nos Bylane's Road Ch. 00-130.00m